+
NTPC shares rebound as power giant achieves milestones
POWER & RENEWABLE ENERGY

NTPC shares rebound as power giant achieves milestones

On September 13, NTPC shares exhibited a modest recovery, trading 1% higher at Rs 237 during early trading hours. This rebound followed a previous day's decline of over 3%, on September 12. The positive sentiment was driven by NTPC's announcement regarding the completion of Unit-1, an 800-megawatt (MW) segment, at the Telangana Super Thermal Power project.

In an exchange filing made on September 12, NTPC reported that the installed capacity of both NTPC and the NTPC group had now reached 57,838 MW and 73,824 MW, respectively.

Additionally, NTPC revealed that it had declared a final dividend of Rs 29.09 billion for the fiscal year 2022-23. This dividend payout represents 30% of the paid-up equity share capital of NTPC. Impressively, the total dividend distributed for FY 2022-23 amounted to Rs 70.3 billion, equivalent to 41% of the profit after tax (PAT). This accomplishment marked the 30th consecutive year in which the company had rewarded its investors with dividends, showcasing its commitment to delivering consistent returns.

In a pioneering move for India, NTPC, a significant coal consumer in the power sector, successfully produced 'green coal' (torrefied charcoal) through a trial process utilising municipal solid waste (MSW) or garbage. Following a successful trial in Varanasi, the central public sector undertaking announced plans to establish more waste-to-coal plants across the nation. The largest of these proposed plants, with a capacity of 900 tonnes per day (TPD), is set to be located in Greater Noida.

On September 13, NTPC shares exhibited a modest recovery, trading 1% higher at Rs 237 during early trading hours. This rebound followed a previous day's decline of over 3%, on September 12. The positive sentiment was driven by NTPC's announcement regarding the completion of Unit-1, an 800-megawatt (MW) segment, at the Telangana Super Thermal Power project.In an exchange filing made on September 12, NTPC reported that the installed capacity of both NTPC and the NTPC group had now reached 57,838 MW and 73,824 MW, respectively.Additionally, NTPC revealed that it had declared a final dividend of Rs 29.09 billion for the fiscal year 2022-23. This dividend payout represents 30% of the paid-up equity share capital of NTPC. Impressively, the total dividend distributed for FY 2022-23 amounted to Rs 70.3 billion, equivalent to 41% of the profit after tax (PAT). This accomplishment marked the 30th consecutive year in which the company had rewarded its investors with dividends, showcasing its commitment to delivering consistent returns.In a pioneering move for India, NTPC, a significant coal consumer in the power sector, successfully produced 'green coal' (torrefied charcoal) through a trial process utilising municipal solid waste (MSW) or garbage. Following a successful trial in Varanasi, the central public sector undertaking announced plans to establish more waste-to-coal plants across the nation. The largest of these proposed plants, with a capacity of 900 tonnes per day (TPD), is set to be located in Greater Noida.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App