NTPC shares rebound as power giant achieves milestones
POWER & RENEWABLE ENERGY

NTPC shares rebound as power giant achieves milestones

On September 13, NTPC shares exhibited a modest recovery, trading 1% higher at Rs 237 during early trading hours. This rebound followed a previous day's decline of over 3%, on September 12. The positive sentiment was driven by NTPC's announcement regarding the completion of Unit-1, an 800-megawatt (MW) segment, at the Telangana Super Thermal Power project.

In an exchange filing made on September 12, NTPC reported that the installed capacity of both NTPC and the NTPC group had now reached 57,838 MW and 73,824 MW, respectively.

Additionally, NTPC revealed that it had declared a final dividend of Rs 29.09 billion for the fiscal year 2022-23. This dividend payout represents 30% of the paid-up equity share capital of NTPC. Impressively, the total dividend distributed for FY 2022-23 amounted to Rs 70.3 billion, equivalent to 41% of the profit after tax (PAT). This accomplishment marked the 30th consecutive year in which the company had rewarded its investors with dividends, showcasing its commitment to delivering consistent returns.

In a pioneering move for India, NTPC, a significant coal consumer in the power sector, successfully produced 'green coal' (torrefied charcoal) through a trial process utilising municipal solid waste (MSW) or garbage. Following a successful trial in Varanasi, the central public sector undertaking announced plans to establish more waste-to-coal plants across the nation. The largest of these proposed plants, with a capacity of 900 tonnes per day (TPD), is set to be located in Greater Noida.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

On September 13, NTPC shares exhibited a modest recovery, trading 1% higher at Rs 237 during early trading hours. This rebound followed a previous day's decline of over 3%, on September 12. The positive sentiment was driven by NTPC's announcement regarding the completion of Unit-1, an 800-megawatt (MW) segment, at the Telangana Super Thermal Power project.In an exchange filing made on September 12, NTPC reported that the installed capacity of both NTPC and the NTPC group had now reached 57,838 MW and 73,824 MW, respectively.Additionally, NTPC revealed that it had declared a final dividend of Rs 29.09 billion for the fiscal year 2022-23. This dividend payout represents 30% of the paid-up equity share capital of NTPC. Impressively, the total dividend distributed for FY 2022-23 amounted to Rs 70.3 billion, equivalent to 41% of the profit after tax (PAT). This accomplishment marked the 30th consecutive year in which the company had rewarded its investors with dividends, showcasing its commitment to delivering consistent returns.In a pioneering move for India, NTPC, a significant coal consumer in the power sector, successfully produced 'green coal' (torrefied charcoal) through a trial process utilising municipal solid waste (MSW) or garbage. Following a successful trial in Varanasi, the central public sector undertaking announced plans to establish more waste-to-coal plants across the nation. The largest of these proposed plants, with a capacity of 900 tonnes per day (TPD), is set to be located in Greater Noida.

Next Story
Infrastructure Transport

MMRDA advances 250 m on Orange Gate–Marine Drive tunnel

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed 250 m of underground tunnelling for the Orange Gate–Marine Drive Urban Road Tunnel using India’s largest slurry shield tunnel boring machine (TBM) deployed for an urban road project.The project involves twin tunnels extending over 7 km beneath critical transport corridors, including Central Railway, Western Railway and Metro Line 3. The work requires high-precision engineering to navigate densely developed urban infrastructure.Once completed, the tunnel is expected to reduce travel time between Orange Gate and Marin..

Next Story
Infrastructure Urban

Hindustan Zinc Pays Rs 188.46 Billion in FY26

Hindustan Zinc contributed Rs 188.46 billion to the public exchequer in FY 2025-26, according to its 9th Tax Transparency Report. The contribution, equivalent to 46 per cent of the company’s revenue, included direct and indirect taxes, government royalties, dividends to the Government of India, withholding taxes and other statutory levies.The company’s five-year cumulative contribution to the exchequer stood at Rs 915.72 billion. In FY26, Hindustan Zinc reported revenue of Rs 408.44 billion, EBITDA of Rs 221.62 billion and profit after tax of Rs 138.32 billion. It also achieved its highest..

Next Story
Infrastructure Urban

World of Concrete India 2026 Opens in Mumbai

Informa Markets in India will host the 12th edition of World of Concrete India 2026 from 3–5 June 2026 at the Bombay Exhibition Centre, Mumbai. The specialised B2B exhibition will bring together manufacturers, suppliers, contractors, developers, architects, consultants, infrastructure companies, project leaders and government stakeholders.The event is expected to feature over 350 brands and more than 18,000 trade professionals. It will cover concrete and cement, dry mortar, precast technologies, formwork, construction chemicals, industrial and commercial flooring, scaffolding, safety solutio..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement