Tata Elxsi Joins Hands with Minespider for Battery Platform
POWER & RENEWABLE ENERGY

Tata Elxsi Joins Hands with Minespider for Battery Platform

Global design and technology services provider Tata Elxsi said it has joined hands with blockchain-powered traceability solutions provider Minespider to introduce an advanced battery lifecycle management platform. Designed to address the growing need for sustainability, compliance, and performance optimization in the battery industry, the platform MOBIUS+ aims to revolutionize the way batteries are managed from production to recycling, the company said in a statement. 

The platform integrates advanced data analytics, real-time monitoring, and compliance features to deliver actionable insights for Original Equipment Manufacturers (OEMs) and the entire battery ecosystem, including material suppliers, cell and module manufacturers, and recyclers, it added.

Global design and technology services provider Tata Elxsi said it has joined hands with blockchain-powered traceability solutions provider Minespider to introduce an advanced battery lifecycle management platform. Designed to address the growing need for sustainability, compliance, and performance optimization in the battery industry, the platform MOBIUS+ aims to revolutionize the way batteries are managed from production to recycling, the company said in a statement. The platform integrates advanced data analytics, real-time monitoring, and compliance features to deliver actionable insights for Original Equipment Manufacturers (OEMs) and the entire battery ecosystem, including material suppliers, cell and module manufacturers, and recyclers, it added.

Next Story
Infrastructure Transport

Maharashtra Approves Rs 9.31 Bn for Bhandara–Gadchiroli Expressway

The Maharashtra cabinet, chaired by Chief Minister Devendra Fadnavis, has approved the revised design and funding of Rs 9.31 billion for the Bhandara–Gadchiroli controlled access expressway, a project expected to enhance connectivity across Vidarbha.The 94.2 km expressway, to be implemented by the Maharashtra State Road Development Corporation (MSRDC), will cut the Bhandara–Gadchiroli distance by 23 km and reduce travel time to 1.5 hours. Of the sanctioned funds, Rs 5.34 billion has been earmarked for project work and Rs 3.96 billion for interest, with land acquisition to begin shortly.The..

Next Story
Infrastructure Energy

Waaree Energies to Offload 14.66% Stake in Indosolar via OFS

Waaree Energies, promoter of Indosolar, will sell up to 61 lakh equity shares, representing 14.66 per cent of Indosolar’s paid-up capital, through an Offer for Sale (OFS) on stock exchanges. The move is aimed at meeting SEBI’s minimum public shareholding (MPS) norms.The OFS will open for non-retail investors on September 18 (T-day), followed by retail investors on September 19 (T+1 day), through a dedicated trading window. Each share carries a face value of Rs 10.Antique Stock Broking has been appointed as the seller’s broker to manage the transaction, ensuring compliance and transparenc..

Next Story
Infrastructure Energy

Gujarat Adds 6,632 MW Renewable Capacity in 2025

Gujarat has added 6,632 MW of renewable energy capacity between April and August 2025, taking its total installed capacity to 39,275.7 MW.The surge is driven by large-scale solar parks, hybrid solar-wind projects, and enhanced transmission infrastructure, further cementing Gujarat’s position as a renewable energy leader.Officials said the expansion supports the state’s sustainable energy goals while strengthening grid reliability and ensuring long-term energy security.News source: Bharat Aawaz ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?