Total Energies to acquire a 25% stake in ANIL
POWER & RENEWABLE ENERGY

Total Energies to acquire a 25% stake in ANIL

Total Energies to acquire a 25% stake in Adani New Industries Limited (ANIL), a new energy venture of the edible oils (Ahmedabad-based) infrastructure and energy conglomerate.

ANIL is aiming to valorise the abundant low-cost renewable power potential in the country by investing $ 50 billion in the next 10 years to create the largest green hydrogen ecosystem in the world.

On Tuesday a joint statement by the companies stated that TotalEnergies would acquire a minority interest in ANIL from the Adani Enterprises. In the initial phase, ANIL would develop a green hydrogen production capacity of 1 million tonne annually before 2030.

While addressing the JP Morgan India Investor Summit, Adani Group chairman Gautam Adani first outlined the green hydrogen plan having an investment of $ 20 billion along with a target of producing the world’s cheapest green electron.

Total Energies and Adani commenced their tango in 2018 when Total acquired a stake in Adani Gas, associated LNG terminal, city gas distribution, and gas marketing businesses. It now has a 37. 4% stake in Adani Gas and 50% stake in the Dhamra LNG project. It further has a 20% stake in Adani Green Energy, which is the group’s renewable energy arm.

ANIL targets to be the largest fully integrated green hydrogen player globally, with its presence across the entire value chain.

Image Source

Also read: SECI to install 25 kW green hydrogen-based pilot project in Leh

Total Energies to acquire a 25% stake in Adani New Industries Limited (ANIL), a new energy venture of the edible oils (Ahmedabad-based) infrastructure and energy conglomerate. ANIL is aiming to valorise the abundant low-cost renewable power potential in the country by investing $ 50 billion in the next 10 years to create the largest green hydrogen ecosystem in the world. On Tuesday a joint statement by the companies stated that TotalEnergies would acquire a minority interest in ANIL from the Adani Enterprises. In the initial phase, ANIL would develop a green hydrogen production capacity of 1 million tonne annually before 2030. While addressing the JP Morgan India Investor Summit, Adani Group chairman Gautam Adani first outlined the green hydrogen plan having an investment of $ 20 billion along with a target of producing the world’s cheapest green electron. Total Energies and Adani commenced their tango in 2018 when Total acquired a stake in Adani Gas, associated LNG terminal, city gas distribution, and gas marketing businesses. It now has a 37. 4% stake in Adani Gas and 50% stake in the Dhamra LNG project. It further has a 20% stake in Adani Green Energy, which is the group’s renewable energy arm. ANIL targets to be the largest fully integrated green hydrogen player globally, with its presence across the entire value chain. Image Source Also read: SECI to install 25 kW green hydrogen-based pilot project in Leh

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?