Tridhaatu Realty’s Phase 1 of its project Tridhaatu Morya in Chembur
Real Estate

Tridhaatu Realty’s Phase 1 of its project Tridhaatu Morya in Chembur

Tridhaatu Realty for phase 1 of its project Tridhaatu Morya, its contemporary residential project located in Chembur, Mumbai, has received the occupancy certificate (OC). Tridhaatu Morya is divided into two phases. Phase 1 comprises 220 units, in configuration of 1 and 2 BHK apartments measurin...

Tridhaatu Realty for phase 1 of its project Tridhaatu Morya, its contemporary residential project located in Chembur, Mumbai, has received the occupancy certificate (OC). Tridhaatu Morya is divided into two phases. Phase 1 comprises 220 units, in configuration of 1 and 2 BHK apartments measuring in size from 477 to 724 sq ft. The second phase of the project will consist of larger 2 and 3 BHK configured apartments with sizes ranging from 728 to 1008 sq ft, comprising a total of 105 units.  Contact: Tridhaatu RealtyTel: 022 6708 3000Email: sales@tridhaatu.comWebiste: www.tridhaatu.com

Next Story
Infrastructure Transport

Maharashtra Approves Rs 9.31 Bn for Bhandara–Gadchiroli Expressway

The Maharashtra cabinet, chaired by Chief Minister Devendra Fadnavis, has approved the revised design and funding of Rs 9.31 billion for the Bhandara–Gadchiroli controlled access expressway, a project expected to enhance connectivity across Vidarbha.The 94.2 km expressway, to be implemented by the Maharashtra State Road Development Corporation (MSRDC), will cut the Bhandara–Gadchiroli distance by 23 km and reduce travel time to 1.5 hours. Of the sanctioned funds, Rs 5.34 billion has been earmarked for project work and Rs 3.96 billion for interest, with land acquisition to begin shortly.The..

Next Story
Infrastructure Energy

Waaree Energies to Offload 14.66% Stake in Indosolar via OFS

Waaree Energies, promoter of Indosolar, will sell up to 61 lakh equity shares, representing 14.66 per cent of Indosolar’s paid-up capital, through an Offer for Sale (OFS) on stock exchanges. The move is aimed at meeting SEBI’s minimum public shareholding (MPS) norms.The OFS will open for non-retail investors on September 18 (T-day), followed by retail investors on September 19 (T+1 day), through a dedicated trading window. Each share carries a face value of Rs 10.Antique Stock Broking has been appointed as the seller’s broker to manage the transaction, ensuring compliance and transparenc..

Next Story
Infrastructure Energy

Gujarat Adds 6,632 MW Renewable Capacity in 2025

Gujarat has added 6,632 MW of renewable energy capacity between April and August 2025, taking its total installed capacity to 39,275.7 MW.The surge is driven by large-scale solar parks, hybrid solar-wind projects, and enhanced transmission infrastructure, further cementing Gujarat’s position as a renewable energy leader.Officials said the expansion supports the state’s sustainable energy goals while strengthening grid reliability and ensuring long-term energy security.News source: Bharat Aawaz ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?