+
Serentica Signs 100 MW Green Power Deal with SECI
POWER & RENEWABLE ENERGY

Serentica Signs 100 MW Green Power Deal with SECI

Serentica Renewables has signed a power purchase agreement (PPA) with state-run Solar Energy Corporation of India (SECI) for a 100 MW round-the-clock clean energy project.

This marks India’s first “load-following” PPA, developed in coordination with SECI and state DISCOMs to align with seasonal demand patterns. Under the agreement, Serentica will meet 80 per cent of specified hourly demand each month, ranging from 17 MW during low-demand periods to 100 MW during peak hours.

To meet these obligations, the company will deploy a diversified mix of wind, solar, and battery energy storage systems (BESS). The project is expected to generate more than 400 GWh of renewable power annually.

Akshay Hiranandani, CEO, Serentica Renewables, said, “By signing the country’s first load-following PPA with SECI, we are demonstrating how innovation in renewable contracting can accelerate decarbonisation while also strengthening the stability and resilience of the power grid.”

The company has not disclosed details regarding the tariff or project location.

News source: Outlook Business

Serentica Renewables has signed a power purchase agreement (PPA) with state-run Solar Energy Corporation of India (SECI) for a 100 MW round-the-clock clean energy project.This marks India’s first “load-following” PPA, developed in coordination with SECI and state DISCOMs to align with seasonal demand patterns. Under the agreement, Serentica will meet 80 per cent of specified hourly demand each month, ranging from 17 MW during low-demand periods to 100 MW during peak hours.To meet these obligations, the company will deploy a diversified mix of wind, solar, and battery energy storage systems (BESS). The project is expected to generate more than 400 GWh of renewable power annually.Akshay Hiranandani, CEO, Serentica Renewables, said, “By signing the country’s first load-following PPA with SECI, we are demonstrating how innovation in renewable contracting can accelerate decarbonisation while also strengthening the stability and resilience of the power grid.”The company has not disclosed details regarding the tariff or project location.News source: Outlook Business

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App