Dallas Tech Centre to Lease Premises to TCS in Visakhapatnam
Real Estate

Dallas Tech Centre to Lease Premises to TCS in Visakhapatnam

The works to set up Tata Consultancy Services (TCS) facility in Madhurawada IT SEZ are progressing swiftly, following a proposal from Dallas Technology Centre (DTC) to lease its premises to TCS along with other arrangements. The state industries and commerce department issued a government order regarding this proposal.

DTC has requested an occupancy certificate, permission to sub-lease the premises to TCS, and the allocation of an additional 1,600 sq m at the original rate of Rs 6,720 per sq m.

Previously, the government had allocated Plot No A, measuring 7,774.90 sq m on Hill No 2 in Rushikonda to DTC. The sale agreement was executed on August 12, 2016, with possession of the plot transferred on September 8 of the same year. The company had received four extensions, with the final deadline set for August 9, 2026.

In a letter dated September 21 of this year, the Dallas Technology Centre had outlined plans to facilitate TCS operations, aiming to employ 2,000 IT professionals in Phase I. The current plan, which includes a ground floor plus three additional floors, accommodates only 1,400 employees, requiring additional space. DTC had requested an additional 1,600 sq m from the available 1,909 sq m.

The State Investment Promotion Board (SIPB) reviewed the proposal on November 19, following recommendations from the State Investment Promotion Committee (SIPC) meeting on November 16. After careful deliberation, the SIPB had recommended a special package for Dallas Technology Centre, which was subsequently approved by the government.

The government directed the special chief secretary, principal secretary, and secretaries of relevant departments, including E&F, S&T, power, roads and buildings, infrastructure and investment, industry and commerce (CIP), and finance, as well as associated departments, to expedite the project implementation through their HODs and PSUs.

The works to set up Tata Consultancy Services (TCS) facility in Madhurawada IT SEZ are progressing swiftly, following a proposal from Dallas Technology Centre (DTC) to lease its premises to TCS along with other arrangements. The state industries and commerce department issued a government order regarding this proposal. DTC has requested an occupancy certificate, permission to sub-lease the premises to TCS, and the allocation of an additional 1,600 sq m at the original rate of Rs 6,720 per sq m. Previously, the government had allocated Plot No A, measuring 7,774.90 sq m on Hill No 2 in Rushikonda to DTC. The sale agreement was executed on August 12, 2016, with possession of the plot transferred on September 8 of the same year. The company had received four extensions, with the final deadline set for August 9, 2026. In a letter dated September 21 of this year, the Dallas Technology Centre had outlined plans to facilitate TCS operations, aiming to employ 2,000 IT professionals in Phase I. The current plan, which includes a ground floor plus three additional floors, accommodates only 1,400 employees, requiring additional space. DTC had requested an additional 1,600 sq m from the available 1,909 sq m. The State Investment Promotion Board (SIPB) reviewed the proposal on November 19, following recommendations from the State Investment Promotion Committee (SIPC) meeting on November 16. After careful deliberation, the SIPB had recommended a special package for Dallas Technology Centre, which was subsequently approved by the government. The government directed the special chief secretary, principal secretary, and secretaries of relevant departments, including E&F, S&T, power, roads and buildings, infrastructure and investment, industry and commerce (CIP), and finance, as well as associated departments, to expedite the project implementation through their HODs and PSUs.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?