Cabinet Approves Revival Plan for Rashtriya Ispat Nigam Ltd at Cost Rs 114 Bn
ECONOMY & POLICY

Cabinet Approves Revival Plan for Rashtriya Ispat Nigam Ltd at Cost Rs 114 Bn

The Cabinet Committee on Economic Affairs has approved the revival plan for Rashtriya Ispat Nigam Ltd. (RINL) at a total of Rs 114 billion, according to an official press release. For RINL, the infusion consists of Rs 103 billion in equity capital and the conversion of Rs 114 billiom working capital loan into 7% non-cumulative preference share capital that can be redeemed after ten years to maintain RINL's viability. 

As a Schedule-A CPSE, RINL is owned entirely by the Government of India and is administered by the Ministry of Steel. The only government-owned offshore steel facility in the state of Andhra Pradesh is the Visakhapatnam Steel Plant, which is run by RINL. It can hold 7.3 Mtpa of liquid steel when installed. 

The Cabinet Committee on Economic Affairs has approved the revival plan for Rashtriya Ispat Nigam Ltd. (RINL) at a total of Rs 114 billion, according to an official press release. For RINL, the infusion consists of Rs 103 billion in equity capital and the conversion of Rs 114 billiom working capital loan into 7% non-cumulative preference share capital that can be redeemed after ten years to maintain RINL's viability. As a Schedule-A CPSE, RINL is owned entirely by the Government of India and is administered by the Ministry of Steel. The only government-owned offshore steel facility in the state of Andhra Pradesh is the Visakhapatnam Steel Plant, which is run by RINL. It can hold 7.3 Mtpa of liquid steel when installed. 

Next Story
Infrastructure Transport

Kavach 4.0 Commissioned on Delhi–Mumbai and Delhi–Howrah

"Kavach version four has been commissioned on 1,452 route km, covering the high density Delhi–Mumbai and Delhi–Howrah corridors. The rollout included laying 8,570 km of optical fibre, installation of 1,100 telecom towers, deployment of trackside equipment over 6,776 RKm and establishment of 767 station data centres. Trackside implementation has been taken up on 24,427 RKm covering Golden Quadrilateral, Golden Diagonal and High Density Network sections. The programme aims to strengthen signalling and train protection on key routes.Kavach is an indigenously developed automatic train protecti..

Next Story
Infrastructure Transport

Railways Advance Kalyan–Murbad Line And Mumbai Capacity Expansion

"Indian Railways is advancing multiple rail infrastructure projects in Maharashtra, including the sanctioned Kalyan–Murbad new line and sizable investments under the Mumbai Urban Transport Project and the Mumbai–Ahmedabad High Speed Rail project. The Kalyan–Murbad 28 km new line has been sanctioned at Rs 8.36 billion (bn) on a 50:50 cost-sharing basis with the Government of Maharashtra and has been declared a Special Railway Project for land acquisition; proposals covering 214 hectares are at various stages of acquisition. Budgetary outlay for projects falling fully or partly in Maharash..

Next Story
Infrastructure Urban

Parliamentary Panel Flags Funding Gaps in Heavy Industries

"The Department-Related Parliamentary Standing Committee on Industry (Rajya Sabha) presented its 332nd report on the Demands for Grants 2026-27 of the Ministry of Heavy Industries (MHI). Figures converted from crore and lakh are expressed in million (mn). The Budget Estimates 2026-27 for the Ministry stand at Rs 79,399 mn against a projected requirement of Rs 94,843.2 mn, a shortfall of about 16 per cent, with revenue at Rs 79,370.8 mn and capital compressed to Rs 28.2 mn from Rs 5,020 mn.The committee flagged recurring BE-to-RE compression and declining revised estimate utilisation, and calle..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement