GFRG demonstrated at IIT-Madras campus
Real Estate

GFRG demonstrated at IIT-Madras campus

With the idea of demonstrating this building system using the technology developed, a two-storey glass fibre-reinforced gypsum (GFRG) demonstration building of 1,981 sq ft was constructed at the IIT-Madras campus in 2013. Dr A Meher Prasad, Professor, Structural Engineering Division, Department of Civil Engineering, IIT Madras, shares more…

The entire superstructure was completed and rendered fit for occupation within 29 days after the laying of the foundation. There was a saving of over 50 per cent in embodied energy for GFRG construction. The demo building was constructed using glass fibre-reinforced gypsum panels, originally designed for use as walls by Rapid Building Systems, Australia. The IIT-Madras research group extended the application of this product for the entire building system – including floors, roofs and staircases – thus significantly reducing the consumption of reinforced cement concrete (RCC). The team also collaborated in the indigenous development of an excellent waterproofing material, which is essential for prolonged durability of GFRG panels, especially in the case of roofs and toilets.

Cost comparison
Currently, the cost of GFRG construction stands at Rs, 1,600 to 1,700 per sq. ft. The GFRG demo building inside the IIT-Madras campus, covering a total plinth area of about 1,981 sq ft, costed about Rs 23 lakh A comparison of the cost of this building with a conventional building of the same plan showed that the demo building was 25 per cent cheaper compared to the latter.

- SERAPHINA D’SOUZA

With the idea of demonstrating this building system using the technology developed, a two-storey glass fibre-reinforced gypsum (GFRG) demonstration building of 1,981 sq ft was constructed at the IIT-Madras campus in 2013. Dr A Meher Prasad, Professor, Structural Engineering Division, Department of Civil Engineering, IIT Madras, shares more… The entire superstructure was completed and rendered fit for occupation within 29 days after the laying of the foundation. There was a saving of over 50 per cent in embodied energy for GFRG construction. The demo building was constructed using glass fibre-reinforced gypsum panels, originally designed for use as walls by Rapid Building Systems, Australia. The IIT-Madras research group extended the application of this product for the entire building system – including floors, roofs and staircases – thus significantly reducing the consumption of reinforced cement concrete (RCC). The team also collaborated in the indigenous development of an excellent waterproofing material, which is essential for prolonged durability of GFRG panels, especially in the case of roofs and toilets. Cost comparison Currently, the cost of GFRG construction stands at Rs, 1,600 to 1,700 per sq. ft. The GFRG demo building inside the IIT-Madras campus, covering a total plinth area of about 1,981 sq ft, costed about Rs 23 lakh A comparison of the cost of this building with a conventional building of the same plan showed that the demo building was 25 per cent cheaper compared to the latter. - SERAPHINA D’SOUZA

Next Story
Infrastructure Transport

JNPA Becomes First Indian Port to Cross 10 Million TEU Capacity

The Jawaharlal Nehru Port Authority (JNPA), located at Uran in Navi Mumbai, has become the first port in India to achieve over 10 million TEUs (twenty-foot equivalent units) in container handling capacity.With the recent expansion, the port now operates five container terminals with a combined capacity of 10.4 million TEUs, alongside two liquid and two general cargo terminals.Handling more than half of India’s container traffic, JNPA processed 7.05 million TEUs in 2024 and has moved 15.39 million tonnes of containers and 16.64 million tonnes of total cargo in the first two months of FY 2025â..

Next Story
Infrastructure Transport

Nod for Rs. 36.26 billion Expansion of Pune Metro Line 2

The Union Cabinet has approved the Rs.36.26 billion expansion of Pune Metro Line 2, adding 12.75 km of track and 13 new stations to improve east–west connectivity across the city.The project aims to link Pune’s urban core with rapidly growing suburbs, supporting the city’s rising demand for efficient and sustainable transport solutions. This expansion is part of Corridor 2 of the Pune Metro and includes two key routes: Vanaz to Chandani Chowk (Corridor 2A) and Ramwadi to Wagholi/Vitthalwadi (Corridor 2B).It will connect residential, IT, and educational hubs in areas such as Bavdhan, Koth..

Next Story
Infrastructure Transport

Assembly begins for ‘Nayak’ TBM on Thane– Borivali Twin Tunnel Project

The assembly of ‘Nayak’, the first of four Tunnel Boring Machines (TBMs) for the Thane–Borivali Twin Tube Tunnel Project, has commenced at the Thane site. Built by German firm Herrenknecht AG and deployed by Megha Engineering & Infrastructure (MEIL), the TBM marks a key milestone in Mumbai’s ambitious 11.8-km underground road corridor beneath Sanjay Gandhi National Park.The twin tunnels will reduce the Thane–Borivali travel distance by 12 km and decongest Thane Ghodbunder Road. ‘Nayak’, with a 13.2-metre diameter, is designed to bore through challenging geological conditions ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?