Tata Steel to invest in hydrogen-based steel manufacturing
Steel

Tata Steel to invest in hydrogen-based steel manufacturing

Tata Steel will invest more than 65 million euros in hydrogen-based steel manufacturing in the Netherlands. Tata Steel has inked pacts with three firms -- McDermott, Danieli and Hatch -- for the further technical preparations for hydrogen-based steel manufacturing in the Dutch city of Ijmuiden.

All three companies have their own specific proficiency that is needed together to assist Tata Steel in hydrogen-based steel manufacturing.

The cost for this first development step is in excess of 65 million euros and will result in an engineering package that forms the basis for a final permitting and project planning. The overall project is led by the Tata Steel internal project and sustainability team, with close support from the main delivery partners.

McDermott is responsible for the construction input and support of the technical project management.

Danieli will oversee the engineering design of the plant and technology that delivers the Direct Reduced Iron (DRI), the first step in the iron-making process.

Hatch is the technology licensor of the electric furnaces that melt the DRI and help reduce the oxygen content further, thereby improving the final steel quality.

The REF and DRI plants are closely combined to form an integrated production system.

Also read:
Tata Steel to invest big in India and Europe operations
Welspun Corp and Tata Steel enter a green energy partnership


Tata Steel will invest more than 65 million euros in hydrogen-based steel manufacturing in the Netherlands. Tata Steel has inked pacts with three firms -- McDermott, Danieli and Hatch -- for the further technical preparations for hydrogen-based steel manufacturing in the Dutch city of Ijmuiden. All three companies have their own specific proficiency that is needed together to assist Tata Steel in hydrogen-based steel manufacturing. The cost for this first development step is in excess of 65 million euros and will result in an engineering package that forms the basis for a final permitting and project planning. The overall project is led by the Tata Steel internal project and sustainability team, with close support from the main delivery partners. McDermott is responsible for the construction input and support of the technical project management. Danieli will oversee the engineering design of the plant and technology that delivers the Direct Reduced Iron (DRI), the first step in the iron-making process. Hatch is the technology licensor of the electric furnaces that melt the DRI and help reduce the oxygen content further, thereby improving the final steel quality. The REF and DRI plants are closely combined to form an integrated production system. Also read: Tata Steel to invest big in India and Europe operationsWelspun Corp and Tata Steel enter a green energy partnership

Next Story
Infrastructure Transport

Tripura Rail Survey Approved For Jirania–Bodhjung Link

The Ministry of Railways has approved a Final Location Survey (FLS) for a proposed new railway line between Jirania and Bodhjung Nagar in Tripura. The planned section will span 14 km and is estimated to cost around Rs 4.2 million, with the entire alignment located within West Tripura district. The approval marks a key step towards strengthening railway infrastructure and supporting industrial growth in the state. Bodhjung Nagar is Tripura’s principal industrial and commercial hub, developed mainly for resource-based industries such as rubber, bamboo and food processing. The proposed Jirania..

Next Story
Infrastructure Transport

MCF Raebareli Rolls Out Its 15,000th Passenger Coach

The Modern Coach Factory (MCF) in Raebareli, Uttar Pradesh, has reached a major production milestone with the manufacture of its 15,000th passenger coach on December 15, the Ministry of Railways said. During the current financial year 2025–26, the unit has produced a total of 1,310 coaches so far. Established in 2007 at Lalganj in Raebareli, MCF is among India’s most advanced passenger coach manufacturing facilities. Built at a cost of around Rs 31.92 billion, the factory has an installed annual capacity of 1,000 coaches and is located about 3 km from Lalganj on the Kanpur–Raebareli Roa..

Next Story
Infrastructure Transport

RVNL Wins Gandak River Rail Bridge Contract

Rail Vikas Nigam Limited (RVNL) has received a Letter of Award from North Eastern Railway for a major railway infrastructure project valued at Rs 1.65 billion. The contract relates to the construction of the substructure for a key railway bridge over the Gandak River. The bridge will be constructed between Paniyahwa and Valmikinagar stations as part of the doubling of the Gorakhpur Cantt–Valmikinagar railway section. Designed to enhance capacity and operational efficiency, the structure will comprise 14 spans of 61 metres each and will be supported by double D-type well foundations. The des..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App