BMC Issues Rs 1.29bn Tenders For Expressway Repairs
ROADS & HIGHWAYS

BMC Issues Rs 1.29bn Tenders For Expressway Repairs

The Brihanmumbai Municipal Corporation has floated two separate tenders for microsurfacing works on the Western Express Highway and the Eastern Express Highway, with a combined estimated project cost of around Rs 1.29 billion.

Of the total outlay, Rs 0.69 billion has been earmarked for microsurfacing a 7.5-kilometre stretch of the 25.33-kilometre Western Express Highway between Oberoi Mall Junction in Goregaon and Magathane in Borivali. A further Rs 0.60 billion has been allocated for a 7.9-kilometre section of the 23.5-kilometre Eastern Express Highway from Kamraj Nagar in Ghatkopar to Amar Mahal in Chembur. Both corridors are critical north–south arterial routes connecting Mumbai’s western and eastern suburbs.

The two highways were earlier maintained by the Mumbai Metropolitan Region Development Authority, with responsibility transferred to the BMC in 2023. Civic officials said resurfacing the entire expressways in one phase would be both expensive and highly disruptive, given the heavy traffic volumes on these roads.

Instead, the BMC plans to undertake annual microsurfacing of selected sections to maintain road quality while minimising traffic disruption. The phased approach is aimed at keeping the expressways smooth and serviceable without causing prolonged congestion on some of the city’s busiest corridors.

The Brihanmumbai Municipal Corporation has floated two separate tenders for microsurfacing works on the Western Express Highway and the Eastern Express Highway, with a combined estimated project cost of around Rs 1.29 billion. Of the total outlay, Rs 0.69 billion has been earmarked for microsurfacing a 7.5-kilometre stretch of the 25.33-kilometre Western Express Highway between Oberoi Mall Junction in Goregaon and Magathane in Borivali. A further Rs 0.60 billion has been allocated for a 7.9-kilometre section of the 23.5-kilometre Eastern Express Highway from Kamraj Nagar in Ghatkopar to Amar Mahal in Chembur. Both corridors are critical north–south arterial routes connecting Mumbai’s western and eastern suburbs. The two highways were earlier maintained by the Mumbai Metropolitan Region Development Authority, with responsibility transferred to the BMC in 2023. Civic officials said resurfacing the entire expressways in one phase would be both expensive and highly disruptive, given the heavy traffic volumes on these roads. Instead, the BMC plans to undertake annual microsurfacing of selected sections to maintain road quality while minimising traffic disruption. The phased approach is aimed at keeping the expressways smooth and serviceable without causing prolonged congestion on some of the city’s busiest corridors.

Next Story
Resources

Haworth India Hosts Women’s Leadership Panel Series

Haworth India marked International Women’s Day by hosting a leadership roundtable series titled ‘Give to Gain’, bringing together senior women leaders from architecture and design firms, corporates and project management consultancies. The series has been conducted in Delhi and Mumbai, with upcoming sessions scheduled in Bengaluru and Hyderabad on 27 March 2026. Structured as moderated panel discussions followed by audience interaction, the initiative examined the business impact of women’s leadership and the role of inclusive workplaces in supporting professional growth. Manish Khan..

Next Story
Real Estate

Max Estates Secures RERA For Max One Project

Max Estates has secured RERA approval (UPRERA No.: UPRERAPRJ9759) for its Max One development around Max Towers in Sector 16B, Noida, bringing renewed progress to a project previously stalled following the insolvency of its earlier developer. Spread across around 10 acres with an estimated development potential of about 2.5 million sq ft, Max One is planned as an integrated mixed-use campus combining serviced residences, premium offices, retail spaces and a private club. The project is expected to generate total sales potential of about Rs 20 billion along with an estimated annuity rental inc..

Next Story
Real Estate

Hindware Introduces Starc Smart Wall Mount Toilet

Hindware has introduced the Starc Smart Wall-Mount Toilet under its Hindware Italian Collection, designed to combine automation, hygiene and contemporary bathroom aesthetics. The model features automatic flushing, sensor-based seat opening and closing, and remote-controlled functions. It also includes an oscillating water spray and warm air dryer for cleaning, along with a self-cleaning nozzle designed to maintain hygiene. Additional features include adjustable heated seating, customisable water temperature and pressure settings, a foot-touch flush system and an LCD control interface. The wa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement