Dilip Buildcon Wins Rs. 6.88 bn Solapur Elevated Corridor Project
ROADS & HIGHWAYS

Dilip Buildcon Wins Rs. 6.88 bn Solapur Elevated Corridor Project

Dilip Buildcon has received a Letter of Award (LoA) from the National Highways Authority of India (NHAI) for a 4-lane elevated corridor project in Solapur, Maharashtra, valued at Rs. 6.88 bn excluding goods and services tax (GST). The project will be developed under the Hybrid Annuity Mode (HAM).

The contract covers construction of the elevated corridor and its approaches between Old Pune Naka and Boramani Naka on National Highway 65 (NH-65), within Solapur city. The alignment extends from Km 0.050 to Km 9.710 and has a stated length of 9.66 km.

Dilip Buildcon is required to complete construction within 24 months. The operation period will run for 15 years from the commercial operation date (COD), according to the company’s exchange filing dated October 29, 2026. The award was made by a domestic entity and is classified as a general contract.

The company said neither its promoter group nor related parties have an interest in NHAI, and the contract does not fall within related-party transactions. The project consideration excludes GST, while the disclosure identifies the contract as a domestic order.

Dilip Buildcon’s filing followed an earlier disclosure dated September 28, 2026, and was submitted to BSE and the National Stock Exchange of India. It also noted that the trading window for insiders and connected persons had already been closed from the end of the quarter until 48 hours after the financial results for the quarter ended September 30, 2026, are declared.

Dilip Buildcon has received a Letter of Award (LoA) from the National Highways Authority of India (NHAI) for a 4-lane elevated corridor project in Solapur, Maharashtra, valued at Rs. 6.88 bn excluding goods and services tax (GST). The project will be developed under the Hybrid Annuity Mode (HAM). The contract covers construction of the elevated corridor and its approaches between Old Pune Naka and Boramani Naka on National Highway 65 (NH-65), within Solapur city. The alignment extends from Km 0.050 to Km 9.710 and has a stated length of 9.66 km. Dilip Buildcon is required to complete construction within 24 months. The operation period will run for 15 years from the commercial operation date (COD), according to the company’s exchange filing dated October 29, 2026. The award was made by a domestic entity and is classified as a general contract. The company said neither its promoter group nor related parties have an interest in NHAI, and the contract does not fall within related-party transactions. The project consideration excludes GST, while the disclosure identifies the contract as a domestic order. Dilip Buildcon’s filing followed an earlier disclosure dated September 28, 2026, and was submitted to BSE and the National Stock Exchange of India. It also noted that the trading window for insiders and connected persons had already been closed from the end of the quarter until 48 hours after the financial results for the quarter ended September 30, 2026, are declared.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Welspun One unveils Diwali campaign for World Trade Center Thane

Welspun One has unveiled A Dream Diwali, a festive brand film promoting World Trade Center Thane, its proposed mixed-use development in the Mumbai Metropolitan Region (MMR). The campaign uses individual interpretations of an ideal Diwali to introduce the experiences and offerings planned at the development.The film follows different characters as they share their festive wishes and go about activities such as shopping, meeting friends, playing games and spending time with family. Through these everyday moments, the campaign presents the idea that celebrations are personal and that different ge..

Next Story
Equipment

BorgWarner secures three turbocharger contracts with global powertrain leader

BorgWarner has secured three new turbocharger contracts with a global powertrain technology company. The wins comprise one contract for its variable turbine geometry (VTG) turbocharger and two for its wastegate turbocharger. The technologies will be deployed in the customer's light-vehicle gasoline platforms in South America and Europe, with production scheduled to begin in 2027.The VTG turbochargers are designed for gasoline engines operating under demanding conditions and high-boost pressure requirements. They are engineered to support Miller-cycle engines and withstand exhaust temperatures ..

Next Story
Infrastructure Transport

International Digi Yatra Trials Begin at Seven Airports

India has begun trials of Digi Yatra for international passengers at seven airports, allowing eligible Indian passport holders to use facial recognition at selected airport checkpoints. The facility is currently limited to Indian nationals with e-passports travelling on selected international flights operated by Air India and IndiGo. The Civil Aviation Ministry announced the trials on 1 November, with testing scheduled through December 2026. A wider rollout is expected in 2027 after the ministry assesses passenger feedback gathered during the trial period, according to PTI. The system is inten..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code