Fadnavis Inaugurates Three Bridges to Cut Mumbai Travel Time
ROADS & HIGHWAYS

Fadnavis Inaugurates Three Bridges to Cut Mumbai Travel Time

Maharashtra Chief Minister Devendra Fadnavis has inaugurated three bridges and flyovers in Mumbai, saying the projects would improve north-south and east-west connectivity and support the goal of reducing travel time across the city to 50 to 60 minutes. The projects are located at Sion, Vidyavihar and Goregaon East.

The facilities were inaugurated virtually and are intended to improve traffic flow, reduce congestion and make travel between key parts of Mumbai more efficient. The Sion railway overbridge and Vidyavihar railway bridge are expected to strengthen connectivity between the eastern and western parts of the city.

The reconstructed Sion bridge replaces a 112-year-old British-era structure that was demolished after being declared unsafe in 2019. The new bridge will make space for the planned fifth and sixth railway lines between Chhatrapati Shivaji Maharaj Terminus and Kurla under the Mumbai Urban Transport Project (MUTP)-II.

The Sion project was originally scheduled for completion in February 2027 but was completed four months ahead of schedule, according to the Brihanmumbai Municipal Corporation. The additional railway lines are intended to increase the number and frequency of suburban train services and improve the operation of long-distance trains.

The Vidyavihar bridge connects Ramchandra Chemburkar Marg in the east with Lal Bahadur Shastri Marg in the west. The facility is expected to reduce the journey between the two sides from around 30 minutes to 10 minutes and ease pressure on the Ghatkopar railway overbridge.

The third project is a 1.26 km flyover near Hotel Ratnagiri junction in Goregaon East. Built as part of the Goregaon-Mulund Link Road project, it connects General Arun Kumar Vaidya Marg with Dadasaheb Phalke Chitranagari Road near Santosh Nagar. Deputy Chief Minister Sunetra Pawar, ministers Ashish Shelar and Mangal Prabhat Lodha, and Mumbai Mayor Ritu Tawde attended the inauguration.

Maharashtra Chief Minister Devendra Fadnavis has inaugurated three bridges and flyovers in Mumbai, saying the projects would improve north-south and east-west connectivity and support the goal of reducing travel time across the city to 50 to 60 minutes. The projects are located at Sion, Vidyavihar and Goregaon East. The facilities were inaugurated virtually and are intended to improve traffic flow, reduce congestion and make travel between key parts of Mumbai more efficient. The Sion railway overbridge and Vidyavihar railway bridge are expected to strengthen connectivity between the eastern and western parts of the city. The reconstructed Sion bridge replaces a 112-year-old British-era structure that was demolished after being declared unsafe in 2019. The new bridge will make space for the planned fifth and sixth railway lines between Chhatrapati Shivaji Maharaj Terminus and Kurla under the Mumbai Urban Transport Project (MUTP)-II. The Sion project was originally scheduled for completion in February 2027 but was completed four months ahead of schedule, according to the Brihanmumbai Municipal Corporation. The additional railway lines are intended to increase the number and frequency of suburban train services and improve the operation of long-distance trains. The Vidyavihar bridge connects Ramchandra Chemburkar Marg in the east with Lal Bahadur Shastri Marg in the west. The facility is expected to reduce the journey between the two sides from around 30 minutes to 10 minutes and ease pressure on the Ghatkopar railway overbridge. The third project is a 1.26 km flyover near Hotel Ratnagiri junction in Goregaon East. Built as part of the Goregaon-Mulund Link Road project, it connects General Arun Kumar Vaidya Marg with Dadasaheb Phalke Chitranagari Road near Santosh Nagar. Deputy Chief Minister Sunetra Pawar, ministers Ashish Shelar and Mangal Prabhat Lodha, and Mumbai Mayor Ritu Tawde attended the inauguration.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

Indus Towers Targets 100,000 Solar-Powered Sites by FY29

Indus Towers expects revenue growth of around 5 to 6 per cent to continue, supported by expansion in its tower and co-location base, managing director and chief executive officer Prachur Sah said. The Gurugram-based telecom infrastructure company also plans to double its solar-powered sites to 100,000 by early or mid-FY29. Sah said demand for towers remained healthy despite expectations of a slowdown after the peak of 5G network rollouts in FY24 and FY25. Continued network deployment by telecom operators and rising data consumption in India are supporting demand, while urban expansion and data..

Next Story
Infrastructure Energy

Odisha Lines Up Rs. 1.17 tn for 11.7 GW Energy Projects

The Odisha government has lined up proposed investments of Rs. 1.17 tn across 11.7 gigawatts (GW) of energy projects through around 18 memorandums of understanding (MoUs) exchanged at the Odisha Pavilion during the Bharat Renewable Energy Summit and Expo 2026 in New Delhi. Chief Minister Mohan Charan Majhi and Deputy Chief Minister Kanak Vardhan Singh Deo witnessed the signing ceremony. The agreements involve developers, public sector undertakings (PSUs), industrial partners and academic institutions. The proposed projects cover pumped hydro storage, wind and solar generation, battery energy s..

Next Story
Real Estate

Pioneer Urban to Invest Rs. 35 bn in Gurugram Residences

Pioneer Urban Land & Infrastructure has announced an investment of more than Rs. 35 bn to develop Alura, an ultra-luxury serviced residences project in Sector 62 along Golf Course Extension Road, Gurugram. The project is expected to generate sales realisation exceeding Rs. 90 bn, according to the developer. Spread across 6.99 acres of licensed land in Pioneer District, Alura will comprise approximately 250 residences in two towers. The homes will range from 7,000 sq ft to 15,000 sq ft and will be priced from Rs. 280 mn. Construction has started, with delivery scheduled for the second quarter o..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code