+
MMRDA to widen Shahad Bridge
ROADS & HIGHWAYS

MMRDA to widen Shahad Bridge

The Mumbai Metropolitan Region Development Authority (MMRDA) has decided to develop and widen the Shahad bridge that falls on the Kalyan-Murbad-Ahmednagar route.

This bridge, which is presently 10-m wide, will be widened by 30 m, bringing much relief to motorists. Around two lakh vehicles use the bridge daily, many of these being trucks carrying vegetables from the rural parts of Murbad, Ahmednagar.

MMRDA had already initiated the widening and concreting work of the Kalyan-Murbad road but there was no announcement about the bridge that is part of this stretch. Earlier this week, at a meeting held between Kalyan MP Shrikant Shinde and MMRDA officials, the plan to develop and widen this bridge was sanctioned.

The bridge was built by the public works department, which also looked after its upkeep. During the monsoon, it was riddled with potholes but no proper repair work was undertaken on it. Last month, a 40-year-old woman died when a tanker hit her from behind when she was on her scooter. Locals claimed she lost her balance because of the potholes.

“The bridge is too narrow to comfortably accommodate the number of vehicles using it. It was very necessary to widen as well as repair it, as potholes spring up on its surface every monsoon,” said Ameya Kothekar, 39, a motorist who takes the bridge daily to travel to work at Murbad.

The Mumbai Metropolitan Region Development Authority (MMRDA) has decided to develop and widen the Shahad bridge that falls on the Kalyan-Murbad-Ahmednagar route. This bridge, which is presently 10-m wide, will be widened by 30 m, bringing much relief to motorists. Around two lakh vehicles use the bridge daily, many of these being trucks carrying vegetables from the rural parts of Murbad, Ahmednagar. MMRDA had already initiated the widening and concreting work of the Kalyan-Murbad road but there was no announcement about the bridge that is part of this stretch. Earlier this week, at a meeting held between Kalyan MP Shrikant Shinde and MMRDA officials, the plan to develop and widen this bridge was sanctioned. The bridge was built by the public works department, which also looked after its upkeep. During the monsoon, it was riddled with potholes but no proper repair work was undertaken on it. Last month, a 40-year-old woman died when a tanker hit her from behind when she was on her scooter. Locals claimed she lost her balance because of the potholes. “The bridge is too narrow to comfortably accommodate the number of vehicles using it. It was very necessary to widen as well as repair it, as potholes spring up on its surface every monsoon,” said Ameya Kothekar, 39, a motorist who takes the bridge daily to travel to work at Murbad.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App