NHAI Floats Tender for Contactless Tolling at Kukdola Plaza
ROADS & HIGHWAYS

NHAI Floats Tender for Contactless Tolling at Kukdola Plaza

The National Highways Authority of India (NHAI) has floated a tender to implement a multi-lane free flow (MLFF) toll collection system at the proposed Kukdola toll plaza near Pachgaon. The plaza is being established to replace the Kherki Daula toll plaza on the Delhi-Jaipur highway, with vehicles expected to pass through without stopping to pay fees.

The proposed facility will use a gantry-based system, while the technical bids are scheduled to be opened on October 23. The successful bidder will also construct the plaza’s control centre and will be responsible for creating, designing and operating the MLFF system. The bidder will be paid according to the number of toll transactions processed.

The Union transport ministry approved the relocation of the Kherki Daula toll plaza in May last year following persistent demands from local residents. The proposed Kukdola facility is around 12 km from the existing plaza. NHAI has provided estimated toll collections as a reference for bidders and expects the entire project to be completed within three months of awarding the contract.

The tender requires the selected company to install two gantries on the main carriageway, including paved shoulders, in each direction. Each gantry must be positioned approximately 350 metres downstream of the respective fee plaza. The system will include automatic number plate recognition (ANPR) cameras, radio-frequency identification (RFID) readers and antennas, detector-Lidar, detector-radar and audit surveillance cameras.

The Bijwasan fee plaza on the Dwarka Expressway and the proposed Kukdola fee plaza will operate as integrated fee plazas. User charges will be based on NHAI’s annual toll fee notification. The request for proposal estimates Kukdola’s toll collection at Rs. 1.66 bn for 2025-26. ANPR and FASTag-based electronic toll collection are intended to enable automated tolling, improve vehicle movement and reduce congestion and traffic jams at Kherki Daula.

The National Highways Authority of India (NHAI) has floated a tender to implement a multi-lane free flow (MLFF) toll collection system at the proposed Kukdola toll plaza near Pachgaon. The plaza is being established to replace the Kherki Daula toll plaza on the Delhi-Jaipur highway, with vehicles expected to pass through without stopping to pay fees. The proposed facility will use a gantry-based system, while the technical bids are scheduled to be opened on October 23. The successful bidder will also construct the plaza’s control centre and will be responsible for creating, designing and operating the MLFF system. The bidder will be paid according to the number of toll transactions processed. The Union transport ministry approved the relocation of the Kherki Daula toll plaza in May last year following persistent demands from local residents. The proposed Kukdola facility is around 12 km from the existing plaza. NHAI has provided estimated toll collections as a reference for bidders and expects the entire project to be completed within three months of awarding the contract. The tender requires the selected company to install two gantries on the main carriageway, including paved shoulders, in each direction. Each gantry must be positioned approximately 350 metres downstream of the respective fee plaza. The system will include automatic number plate recognition (ANPR) cameras, radio-frequency identification (RFID) readers and antennas, detector-Lidar, detector-radar and audit surveillance cameras. The Bijwasan fee plaza on the Dwarka Expressway and the proposed Kukdola fee plaza will operate as integrated fee plazas. User charges will be based on NHAI’s annual toll fee notification. The request for proposal estimates Kukdola’s toll collection at Rs. 1.66 bn for 2025-26. ANPR and FASTag-based electronic toll collection are intended to enable automated tolling, improve vehicle movement and reduce congestion and traffic jams at Kherki Daula.

Related Stories

Gold Stories

Next Story
Resources

Kalpataru Projects International elevates Amit Uplenchwar as Joint MD and CEO

Kalpataru Projects International (KPIL) has elevated Amit Uplenchwar as Joint Managing Director and CEO (designate), following approval by its board on 5 November 2026. He will take charge as Additional Director, Joint Managing Director and CEO from 1 January 2027 for a five-year term ending 31 December 2031, subject to shareholders' approval.Uplenchwar brings over three decades of experience in corporate strategy, business operations, business development, mergers and acquisitions, and international business management. His experience spans transportation, power, water, oil and gas, aerospace..

Next Story
Resources

HCC appoints Vivek Singhal as CEO

Hindustan Construction Company (HCC) has appointed Vivek Singhal as Chief Executive Officer, effective 5 November 2026. He brings over four decades of experience in infrastructure and engineering, procurement and construction (EPC), covering project execution, business leadership, business development and profit and loss management.Singhal has spent 16 years in international markets, delivering projects and managing assets worth approximately Rs 285 billion across five countries. His experience spans airports, metro rail, urban transport, hydropower, bridges and other infrastructure sectors.He..

Next Story
Infrastructure Energy

Essar Signs PPA for 300 MW Hybrid Renewable Energy Project

Essar Renewables, the renewable energy arm of Essar Power, has signed a Power Purchase Agreement (PPA) with NHPC for a 300 MW renewable energy project in Andhra Pradesh. The agreement follows the company’s successful bid for the project two years ago. Essar Power will invest approximately Rs. 45 bn in the development. The project will combine solar and wind generation with Battery Energy Storage Systems (BESS), enabling the supply of reliable and dispatchable renewable power. It forms part of Essar Power’s plan to build a diversified energy portfolio of approximately 5 GW across renewable,..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code