+
Ahmedabad railway station to transform into integrated hub by 2027
RAILWAYS & METRO RAIL

Ahmedabad railway station to transform into integrated hub by 2027

The Kalupur-based Ahmedabad railway station is undergoing a significant transformation to become an integrated hub serving the Indian Railways, the bullet train, and the metro. Inspired by the Modhera Sun Temple, the new railway station is slated for completion by 2027.

Railway authorities have confirmed that two Archaeological Survey of India monuments?the Shaking Minarets and Brick Minarets?located on the station premises will be incorporated into the new complex and preserved.

As part of the redevelopment initiative, the station will feature a spacious roof plaza above the tracks, consolidating all passenger amenities in one location. This will include areas for stores, cafeterias, and recreational facilities. The station building will span both sides of the tracks, with a master plan designed to facilitate smooth traffic flow and provide ample parking facilities.

Officials have outlined specific entry points for different modes of transportation. The Kalupur side entry will cater to Indian Railways and BRTS, with convenient walkways linking it to the metro and bullet train stations. On the Saraspur side, direct access will be available to the bullet train and metro stations, with separate entries and exits to prevent congestion.

The DRA-DMRC JV, a joint venture between Dineshchandra R Agrawal Infracon and Delhi Metro Rail Corporation, has been awarded the contract for the project. A fresh tender was issued after the Railway Land Development Authority (RLDA) canceled a previous one due to high bids. The new tender, valued at Rs 2,563 crore, attracted multiple companies, and the DRA-DMRC JV secured the project with a bid of Rs 2,383 crore.

The redevelopment project, a part of the Amrut Bharat Station Yojna, aims to create a modern station complex featuring 16 buildings, including a hotel. Passengers can expect facilities comparable to those found at airports.

The Kalupur-based Ahmedabad railway station is undergoing a significant transformation to become an integrated hub serving the Indian Railways, the bullet train, and the metro. Inspired by the Modhera Sun Temple, the new railway station is slated for completion by 2027. Railway authorities have confirmed that two Archaeological Survey of India monuments?the Shaking Minarets and Brick Minarets?located on the station premises will be incorporated into the new complex and preserved. As part of the redevelopment initiative, the station will feature a spacious roof plaza above the tracks, consolidating all passenger amenities in one location. This will include areas for stores, cafeterias, and recreational facilities. The station building will span both sides of the tracks, with a master plan designed to facilitate smooth traffic flow and provide ample parking facilities. Officials have outlined specific entry points for different modes of transportation. The Kalupur side entry will cater to Indian Railways and BRTS, with convenient walkways linking it to the metro and bullet train stations. On the Saraspur side, direct access will be available to the bullet train and metro stations, with separate entries and exits to prevent congestion. The DRA-DMRC JV, a joint venture between Dineshchandra R Agrawal Infracon and Delhi Metro Rail Corporation, has been awarded the contract for the project. A fresh tender was issued after the Railway Land Development Authority (RLDA) canceled a previous one due to high bids. The new tender, valued at Rs 2,563 crore, attracted multiple companies, and the DRA-DMRC JV secured the project with a bid of Rs 2,383 crore. The redevelopment project, a part of the Amrut Bharat Station Yojna, aims to create a modern station complex featuring 16 buildings, including a hotel. Passengers can expect facilities comparable to those found at airports.

Next Story
Technology

Six ways a smarter workflow leads to faster, more accurate bids

In today’s fast-paced civil construction environment, estimators need more than just solid numbers. They need smart, streamlined processes. This article explores six key ways connected workflows can transform the estimated approach, help in minimising risk, move faster, and improve accuracy. By integrating tools, data, and teams, one can produce stronger bids with less rework, fewer surprises, and more confidence. As an estimator, the job goes beyond producing numbers. They are responsible for delivering bids that are fast, accurate, and built to win. In today’s civil construction ind..

Next Story
Real Estate

Experion Launches Women-Only Co-Living Project in Greater Noida

Experion, part of Singapore-based AT Capital Group, has launched its first co-living space under its managed rental housing brand, VLIV, in Greater Noida. The all-women residence features 730 twin-sharing beds with a strong focus on safety, comfort, and well-being. VLIV has committed a $300 million investment to create a structured, service-led rental housing ecosystem in India. The brand aims to scale up to 20,000 beds in the next few years, with a long-term target of 100,000 beds nationwide. “India’s rental housing is fragmented. VLIV is our way of building long-term, dependabl..

Next Story
Infrastructure Urban

Officine Maccaferri Acquires CPT to Bolster Tunnelling Tech

Ambienta’s platform company, Officine Maccaferri S.p.A., has acquired CPT Group, a leading Italian developer of robotic prefabrication systems and digital control technologies for mechanised tunnelling. The move positions Maccaferri as a global player in integrated tunnelling solutions, blending traditional and advanced mechanised systems. Based in Nova Milanese, CPT serves major global contractors across Europe, Southeast Asia, and Australia. The company offers robotic prefabrication (Robofactory), productivity-monitoring software for Tunnel Boring Machines (TBMs), and eco-designed spa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?