Alstom Completes 36 Driverless Trainsets for Chennai Metro Phase II
RAILWAYS & METRO RAIL

Alstom Completes 36 Driverless Trainsets for Chennai Metro Phase II

Alstom has completed manufacturing 36 driverless Metropolis trainsets for Chennai Metro Phase II, with passenger services beginning on Corridor 4. The fleet comprises 108 cars and was designed at the company’s engineering centre in Bengaluru, Karnataka, before being manufactured at its Sri City facility in Andhra Pradesh.

Corridor 4 spans 26 km between Poonamallee Bypass and Light House, with 28 stations comprising 18 elevated and 10 underground stops. The route links residential, commercial and cultural areas and provides an alternative to road travel for Chennai’s more than 11 mn residents.

The trainsets are configured for driverless operations at speeds of up to 80 kmh. Each three-car train can accommodate up to 1,000 passengers and includes regenerative braking, air conditioning, passenger information displays, CCTV cameras, emergency evacuation doors and dedicated spaces for women and differently abled passengers. One entire car reserves two-thirds of its space as a ladies’ section.

The contract, awarded in 2023 and valued at 124 mn euros, covered the design, manufacture, supply, testing, commissioning and training of CMRL drivers for the Corridor 4 fleet. The 36th and final trainset is scheduled for delivery by the end of October 2026, while 32 additional driverless trainsets remain under production at Sri City.

The trainsets feature exterior styling inspired by Bharatanatyam mudras and interior platform screen patterns based on Tamil Nadu’s Kolam art. Alstom has supported Chennai’s metro network since 2010, supplying 208 cars, signalling and power systems for the 54 km Phase I network. A further 96 driverless Metropolis cars ordered in 2025 have also entered production, extending the company’s partnership with Chennai Metro Rail. Alstom operates six industrial sites and five engineering centres in India, supplying rolling stock, infrastructure, signalling and related services for domestic and international projects.

Alstom has completed manufacturing 36 driverless Metropolis trainsets for Chennai Metro Phase II, with passenger services beginning on Corridor 4. The fleet comprises 108 cars and was designed at the company’s engineering centre in Bengaluru, Karnataka, before being manufactured at its Sri City facility in Andhra Pradesh. Corridor 4 spans 26 km between Poonamallee Bypass and Light House, with 28 stations comprising 18 elevated and 10 underground stops. The route links residential, commercial and cultural areas and provides an alternative to road travel for Chennai’s more than 11 mn residents. The trainsets are configured for driverless operations at speeds of up to 80 kmh. Each three-car train can accommodate up to 1,000 passengers and includes regenerative braking, air conditioning, passenger information displays, CCTV cameras, emergency evacuation doors and dedicated spaces for women and differently abled passengers. One entire car reserves two-thirds of its space as a ladies’ section. The contract, awarded in 2023 and valued at 124 mn euros, covered the design, manufacture, supply, testing, commissioning and training of CMRL drivers for the Corridor 4 fleet. The 36th and final trainset is scheduled for delivery by the end of October 2026, while 32 additional driverless trainsets remain under production at Sri City. The trainsets feature exterior styling inspired by Bharatanatyam mudras and interior platform screen patterns based on Tamil Nadu’s Kolam art. Alstom has supported Chennai’s metro network since 2010, supplying 208 cars, signalling and power systems for the 54 km Phase I network. A further 96 driverless Metropolis cars ordered in 2025 have also entered production, extending the company’s partnership with Chennai Metro Rail. Alstom operates six industrial sites and five engineering centres in India, supplying rolling stock, infrastructure, signalling and related services for domestic and international projects.

Related Stories

Gold Stories

Next Story
Real Estate

IGBC Green Building Congress 2026 advances India’s net-zero agenda

The Indian Green Building Council (IGBC), part of the Confederation of Indian Industry (CII), opened the 24th edition of the Green Building Congress 2026 at the Jio World Convention Centre, Mumbai, with a focus on accelerating India's green and net-zero building movement. The three-day event, being held from 26 to 28 November, brought together policymakers, industry leaders and sustainability experts to discuss green buildings, climate-resilient infrastructure and sustainable communities.A key highlight of the inaugural session was the launch of five pilot rating systems: Green Retail, DigiBui..

Next Story
Real Estate

Maharashtra CM inaugurates fifth Model Sub-Registrar Office in Mumbai

Maharashtra Chief Minister Devendra Fadnavis has inaugurated a Model Sub-Registrar Office (SRO) in Lower Parel, Mumbai, taking the number of such centres launched in the state to five. The initiative aims to modernise property registration services through technology-enabled infrastructure and citizen-centric processes.Developed by the Government of Maharashtra in association with VFS Global and WE Excel Software, the Lower Parel centre follows the launch of Model SROs in Pune, Bandra Kurla Complex in Mumbai, Navi Mumbai and Nagpur.The centres provide facilities for registering property-relate..

Next Story
Infrastructure Transport

NHBF hails Indian Army aircraft operations on Amritsar–Jamnagar corridor

The National Highways Builders Federation (NHBF) has welcomed the successful landing and take-off of four Indian Army microlight aircraft on the Amritsar–Jamnagar Economic Corridor (NH-754K) in Gujarat. The exercise demonstrated the potential of highway infrastructure to support defence operations and emergency response. The expressway was developed by CDS Infra Projects, an NHBF member company.Developed under the Bharatmala Pariyojana, the six-lane greenfield corridor is described as India's second-longest expressway. The operation was conducted by the Indian Army's Team Mountain Eagles as ..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code