RailTel Corporation receives Rs 11.57 crore work order from RVNL
RAILWAYS & METRO RAIL

RailTel Corporation receives Rs 11.57 crore work order from RVNL

RailTel Corporation of India received Rs 11.57 crore work order from Rail Vikas Nigam Ltd (RVNL) for the installation of multiprotocol label switching-virtual private networks (MPLS-VPN) services of RailTel for a 5-year period at several locations of the RVNL.

Currently, Railtel Corporation Of India is trading at Rs 91.70 on the Bombay stock exchange (BSE), which is up by 2.34% or 2.10 points from the previous closing of Rs. 89.60.

The corporation had opened at Rs. 91.30 and has now touched a high and low of Rs 93.25 and Rs 90.85. As of now, 113738 shares had been traded on the counter.

The group ‘A’ of the BSE stock of face value of Rs 10 on June 10, 2021, has reached a 52 week high of Rs 164.70, and on March 7, 2022, has reached a 52 week low of Rs 87.20.

In the last week, the high and low stood at Rs 93.25 and Rs 89.25. Their current market cap is Rs 2875.61 crore.

In the company, the promoter's holding stood at 72.84%. The Institutions and Non-Institutions holding stood at 7.21% and 19.95% .

RailTel Corporation is a ‘Mini Ratna (Category-I)’ public sector undertaking (PSU) and is among the largest neutral telecom infrastructure providers in India having ownership of a Pan-India optic fiber network on exclusive Right of Way (ROW) by the Railway track. The company offers broadband, telecom, and multimedia networks in the country.

Image Source

Also read: Indian Railways and RailTel to develop Edge Data Centres

RailTel Corporation of India received Rs 11.57 crore work order from Rail Vikas Nigam Ltd (RVNL) for the installation of multiprotocol label switching-virtual private networks (MPLS-VPN) services of RailTel for a 5-year period at several locations of the RVNL. Currently, Railtel Corporation Of India is trading at Rs 91.70 on the Bombay stock exchange (BSE), which is up by 2.34% or 2.10 points from the previous closing of Rs. 89.60. The corporation had opened at Rs. 91.30 and has now touched a high and low of Rs 93.25 and Rs 90.85. As of now, 113738 shares had been traded on the counter. The group ‘A’ of the BSE stock of face value of Rs 10 on June 10, 2021, has reached a 52 week high of Rs 164.70, and on March 7, 2022, has reached a 52 week low of Rs 87.20. In the last week, the high and low stood at Rs 93.25 and Rs 89.25. Their current market cap is Rs 2875.61 crore. In the company, the promoter's holding stood at 72.84%. The Institutions and Non-Institutions holding stood at 7.21% and 19.95% . RailTel Corporation is a ‘Mini Ratna (Category-I)’ public sector undertaking (PSU) and is among the largest neutral telecom infrastructure providers in India having ownership of a Pan-India optic fiber network on exclusive Right of Way (ROW) by the Railway track. The company offers broadband, telecom, and multimedia networks in the country. Image Source Also read: Indian Railways and RailTel to develop Edge Data Centres

Next Story
Infrastructure Transport

Gurgaon-Pataudi-Rewari Highway Set for Completion by December 2025

The National Highways Authority of India (NHAI) has set a new target to complete the four-lane Gurgaon-Pataudi-Rewari highway by December 2025, following a two-year delay.Originally planned in 2018 to upgrade the two-lane state highway into a national highway, the project is estimated to cost Rs 9 billion. Construction, which began in 2021, was initially scheduled for completion in November 2023. According to NHAI, around 70 per cent of the work is already complete, with two major structures still pending: a railway overbridge at Pahari village and a two-lane unidirectional flyover on Dwarka E..

Next Story
Infrastructure Transport

UP Plans Rs 900 Million Extensions to Hindon Elevated Road

The Uttar Pradesh state bridge corporation has prepared the detailed project report and cost estimates for two proposed extensions of the 10.3-km Hindon elevated road, officials said on Thursday. The road connects Raj Nagar Extension to UP-Gate near the east Delhi border, and the project is expected to cost around Rs 900 million.The two extensions, each 400 metres long, will be added to the existing elevated road to ensure smoother traffic flow. “One of the extensions will be from near the Kanawani culvert (near Indirapuram) to the elevated road for commuters heading towards Delhi. The other..

Next Story
Infrastructure Urban

Goa Likely to Miss October Deadline for Maritime Master Plan

Goa is expected to miss the October 31 deadline for submitting its maritime and waterways master plan, which covers the state’s 105 km coastline and river network. The delay is due to the project management consultant not yet being appointed. The plan is now anticipated to be completed by December, Captain of Ports Octavio Rodrigues stated at the India Maritime Week 2025 roadshow.“We have already selected the consultant and will bring them on board within a week. Only then can we begin drafting the master plan, which is essential to secure central government funding,” Rodrigues added.A c..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?