Users Urge Start of Additional Railway Lines from Attipattu to Gummudipoondi
RAILWAYS & METRO RAIL

Users Urge Start of Additional Railway Lines from Attipattu to Gummudipoondi

The Gummudipoondi Railway Passengers Welfare Association has urged the Union government and Southern Railway to begin work on the proposed third and fourth railway lines between Attipattu and Gummidipoondi in northern Chennai. The association wrote to Prime Minister Narendra Modi, Railways Minister Ashwini Vaishnaw and senior railway officials seeking action on the project.

The 22.52-km lines were sanctioned recently at an estimated cost of Rs. 3.65 bn. The association said the Railway Board approved the project about eight months ago, after which Southern Railway opened a tender that closed on May 12, 2026. It added that almost five months had passed since the tender closed, but construction had not started.

Association president S Suresh Babu said in the letter that passengers faced severe congestion and lengthy journeys on the route. Commuters currently spend nearly two hours travelling the 45-km distance between Gummidipoondi and Chennai Central, making the doubling project a long-standing demand among residents of North Chennai.

The association said the project could reduce the journey between Chennai Central and Gummidipoondi by approximately 45 minutes. It also pointed to the existing use of the third and fourth lines between Korukkupet and Attipattu, which are mainly used by goods trains rather than suburban services.

According to the association, suburban trains currently halt on loop lines at Ponneri, Minjur and Kavaraipettai stations after Attipattu to allow express trains to pass. The proposed additional lines would enable separate tracks for express and suburban services, reducing operational conflicts and improving train movement. The association has therefore sought the early finalisation of the tender process and commencement of construction, saying the project would benefit thousands of daily passengers along the corridor.

The Gummudipoondi Railway Passengers Welfare Association has urged the Union government and Southern Railway to begin work on the proposed third and fourth railway lines between Attipattu and Gummidipoondi in northern Chennai. The association wrote to Prime Minister Narendra Modi, Railways Minister Ashwini Vaishnaw and senior railway officials seeking action on the project. The 22.52-km lines were sanctioned recently at an estimated cost of Rs. 3.65 bn. The association said the Railway Board approved the project about eight months ago, after which Southern Railway opened a tender that closed on May 12, 2026. It added that almost five months had passed since the tender closed, but construction had not started. Association president S Suresh Babu said in the letter that passengers faced severe congestion and lengthy journeys on the route. Commuters currently spend nearly two hours travelling the 45-km distance between Gummidipoondi and Chennai Central, making the doubling project a long-standing demand among residents of North Chennai. The association said the project could reduce the journey between Chennai Central and Gummidipoondi by approximately 45 minutes. It also pointed to the existing use of the third and fourth lines between Korukkupet and Attipattu, which are mainly used by goods trains rather than suburban services. According to the association, suburban trains currently halt on loop lines at Ponneri, Minjur and Kavaraipettai stations after Attipattu to allow express trains to pass. The proposed additional lines would enable separate tracks for express and suburban services, reducing operational conflicts and improving train movement. The association has therefore sought the early finalisation of the tender process and commencement of construction, saying the project would benefit thousands of daily passengers along the corridor.

Related Stories

Gold Stories

Next Story
Technology

Where Infrastructure Meets Intelligence: Inside Bentley's Year inc

Oct 28, 2026  @Tanveer PadodeA first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.- By Tanveer Padode, CEO, IMPACCT: A first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.Two days in SingaporeConstruction is won or lost in two places: how a project is designed and how it is delivered. Technology has promised to improve both for years, and the question I carried into Bentley's Year in Infrastructure, held at the Fairmont Si..

Next Story
Infrastructure Transport

Vaishnaw Inaugurates Two Rail Sections in Madhya Pradesh

Railway Minister Ashwini Vaishnaw on October 24 inaugurated the Satna-Devendranagar and Rewa-Churhat rail sections under the Lalitpur-Singrauli Railway Project in Madhya Pradesh. He also flagged off the new Devendranagar-Churhat passenger train service through video conferencing. Chief Minister Dr Mohan Yadav attended the event. The new Rewa-Churhat railway line, which extends approximately 65 km, was built at a cost of over Rs. 10 bn. The 53 km Satna-Devendranagar line was constructed at a cost of over Rs. 8 bn. The passenger service is expected to provide improved rail access to residents in..

Next Story
Infrastructure Transport

Railways Minister to Inaugurate New Rail Sections Covering 118 km

Railways Minister Ashwini Vaishnaw will inaugurate the Satna-Devendra Nagar and Rewa-Churhat rail sections in Madhya Pradesh on October 24. The two sections have a combined length of 118 km and are intended to improve passenger and freight connectivity across the region. Vaishnaw will also flag off a new train service between Devendra Nagar and Churhat. Madhya Pradesh Chief Minister Mohan Yadav will attend the inauguration programme, according to information released by the Ministry of Railways. The 53-km Satna-Devendra Nagar section is expected to improve rail access to Satna, Nagod, Devendra..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code