+
Vaishnaw Flags Off Biweekly Ramnagar Dehradun Express
RAILWAYS & METRO RAIL

Vaishnaw Flags Off Biweekly Ramnagar Dehradun Express

Railway Minister Ashwini Vaishnaw virtually flagged off the inaugural service of the biweekly Ramnagar-Dehradun Express, marking the first ever direct express connection between Ramnagar and Dehradun in Uttarakhand. The launch was attended virtually by Uttarakhand Chief Minister Pushkar Singh Dhami. The ministry said the service aims to boost connectivity across the two regions.

The ministry described the new train as addressing a long?pending demand and strengthening rail links between the Kumaon and Garhwal regions. Officials said the date for commencement of regular passenger operations has not been specified and is being planned. The Express will operate every Wednesday and Friday; Train No 15310 will depart Ramnagar at 05:50 hrs and arrive at Dehradun at 12:40 hrs, while Train No 15309 will depart Dehradun at 15:55 hrs and reach Ramnagar at 23:30 hrs, with halts at Kashipur, Roshanpur, Pipalsana, Moradabad, Najibabad and Haridwar.

The train will comprise AC Second Class, AC Third Class, AC Chair Car, Sleeper Class, Second Sitting and General Second Class coaches to offer travel options across different categories. Officials said residents of Nainital, Udham Singh Nagar, Haridwar and Dehradun districts in Uttarakhand, and Moradabad and Bijnor districts in Uttar Pradesh stand to benefit, including students, farmers and traders. The service is expected to promote tourism and pilgrimage by improving access to Jim Corbett National Park, the Girija Devi temple on a rock in the Kosi river near Ramnagar and the ancient sites of Sitamadhi and Sitavani.

Vaishnaw noted that the new service would strengthen rail connectivity between the Kumaon and Garhwal regions and that Rishikesh railway station will be developed as a feeder station to ease pressure on Haridwar. A master plan is being prepared to create additional capacity and improve connectivity for passengers travelling to and from Haridwar and Rishikesh. Officials said the measures aim to enhance convenience for passengers and support regional economic activity.

Railway Minister Ashwini Vaishnaw virtually flagged off the inaugural service of the biweekly Ramnagar-Dehradun Express, marking the first ever direct express connection between Ramnagar and Dehradun in Uttarakhand. The launch was attended virtually by Uttarakhand Chief Minister Pushkar Singh Dhami. The ministry said the service aims to boost connectivity across the two regions. The ministry described the new train as addressing a long?pending demand and strengthening rail links between the Kumaon and Garhwal regions. Officials said the date for commencement of regular passenger operations has not been specified and is being planned. The Express will operate every Wednesday and Friday; Train No 15310 will depart Ramnagar at 05:50 hrs and arrive at Dehradun at 12:40 hrs, while Train No 15309 will depart Dehradun at 15:55 hrs and reach Ramnagar at 23:30 hrs, with halts at Kashipur, Roshanpur, Pipalsana, Moradabad, Najibabad and Haridwar. The train will comprise AC Second Class, AC Third Class, AC Chair Car, Sleeper Class, Second Sitting and General Second Class coaches to offer travel options across different categories. Officials said residents of Nainital, Udham Singh Nagar, Haridwar and Dehradun districts in Uttarakhand, and Moradabad and Bijnor districts in Uttar Pradesh stand to benefit, including students, farmers and traders. The service is expected to promote tourism and pilgrimage by improving access to Jim Corbett National Park, the Girija Devi temple on a rock in the Kosi river near Ramnagar and the ancient sites of Sitamadhi and Sitavani. Vaishnaw noted that the new service would strengthen rail connectivity between the Kumaon and Garhwal regions and that Rishikesh railway station will be developed as a feeder station to ease pressure on Haridwar. A master plan is being prepared to create additional capacity and improve connectivity for passengers travelling to and from Haridwar and Rishikesh. Officials said the measures aim to enhance convenience for passengers and support regional economic activity.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

MMRDA Targets Completion of Projects by December 2028

The Mumbai Metropolitan Region Development Authority (MMRDA) is targeting the completion of all its ongoing infrastructure projects by December 2028, a year ahead of its December 2029 deadline, Metropolitan Commissioner Dr Sanjay Mukherjee has said.Speaking at the sixth edition of the Real Estate & Infrastructure Investors' Summit (REIIS) 2026 in Mumbai, Mukherjee said the authority was developing an integrated network of roads, tunnels, sea links and Metro corridors under its broader vision of “Mumbai in 59 Minutes”.The objective is to improve east-west and north-south connectivity an..

Next Story
Building Material

High-Performance Façades Gain Ground in Indian Buildings

High-performance façades are gaining greater importance in Indian architecture as developers and architects increasingly focus on energy efficiency, thermal comfort and building performance, according to Shankar Fenestrations & Glasses.The company said modern façade systems are increasingly being considered as part of a building's overall performance strategy rather than being used primarily as aesthetic elements.High-performance glass, curtain wall systems and structural glazing can contribute to thermal regulation, solar control, daylight management and indoor comfort. Their growing ad..

Next Story
Technology

SPML Infra's 104.4 kWh BESS Battery Pack Clears Global Tests

SPML Infra has announced that its proprietary 104.4 kWh Battery Energy Storage System (BESS) battery pack has completed key international safety, performance and transportation testing and certification requirements, marking a step towards its commercial deployment.Developed under the company's own intellectual property, the battery pack has completed requirements under UL9540A, IEC 62619, IEC 63056, IEC 60730, IEC 61000-6-2, IEC 61000-6-4 and UN38.3 standards.The testing covers areas including thermal runaway safety, battery performance, system functional safety, electromagnetic compatibility..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code