Chandigarh administration approves C&D waste policy draft rules
WATER & WASTE

Chandigarh administration approves C&D waste policy draft rules

The Chandigarh administration approved draft rules of the construction and demolition (C&D) waste policy, aiming to reuse 100% C&D waste in the city after recycling.

The draft rules of the C&D waste policy will be sent to Chandigarh administrator VP Singh Badnore for approval, and accordingly, public notice seeking suggestions and objections will be issued.

Union Territory (UT) adviser Dharam Pal said he aims to recycle 100% C&D waste. The UT will give various options to residents to bring C&D waste to its plant in the Industrial Area.

He said that the charges, transportation modes—private or government — everything will be finalised after receiving objections and suggestions from the public.

He further added that the UT is aiming not only at the C&D waste of Chandigarh but also Panchkula and Mohali.

During the municipal corporation (MC) commissioner KK Yadav presentation related to solid waste management rules-2016, it was discussed that while residents are free to use their private vehicle to send their malba to the plant, MC vehicles will also be available but on a chargeable basis, Sources said.

Dharam Pal had recently urged the MC to expand the capacity of the C&D waste plant at Industrial Area, Phase I, for better use of recycled construction waste.

Image Source

The Chandigarh administration approved draft rules of the construction and demolition (C&D) waste policy, aiming to reuse 100% C&D waste in the city after recycling. The draft rules of the C&D waste policy will be sent to Chandigarh administrator VP Singh Badnore for approval, and accordingly, public notice seeking suggestions and objections will be issued. Union Territory (UT) adviser Dharam Pal said he aims to recycle 100% C&D waste. The UT will give various options to residents to bring C&D waste to its plant in the Industrial Area. He said that the charges, transportation modes—private or government — everything will be finalised after receiving objections and suggestions from the public. He further added that the UT is aiming not only at the C&D waste of Chandigarh but also Panchkula and Mohali. During the municipal corporation (MC) commissioner KK Yadav presentation related to solid waste management rules-2016, it was discussed that while residents are free to use their private vehicle to send their malba to the plant, MC vehicles will also be available but on a chargeable basis, Sources said. Dharam Pal had recently urged the MC to expand the capacity of the C&D waste plant at Industrial Area, Phase I, for better use of recycled construction waste. Image Source

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?