Swachhata Startup Challenge to promote waste management Startup
WATER & WASTE

Swachhata Startup Challenge to promote waste management Startup

On January 27, 2022, the centre launched the ‘Swachhata Startup Challenge’ in collaboration with the Department for Promotion of Industry and Internal Trade (DPIIT) for the promotion of an enabling environment to develop startups and entrepreneurs in the sector of waste management.

Applications have been received from startups in the domain of four thematic areas identified which are, social inclusion, zero dump, plastic waste management, and transparency, these will be evaluated to check the quality of solutions offered.

The scheme offers the ten best solutions by the startups to be chosen and every selected project will be provided with the financial support of Rs 25 lakh and dedicated incubation support of one year.

Additionally, with the Swachhata Startup Challenge, the government also launched the Swachh Technology Challenge in December 2021.

According to the Swachh Technology Challenge guidelines, the Urban Local Bodies (ULBs) have conducted the challenge and forwarded two best solutions to the State's post-evaluation of entries to select a maximum of three best entries. The ULBs in the country shall provide implementation support to the winners along with award money and State/City level felicitation.

Furthermore, provisions are made under Swachh Bharat Mission or Urban 2.0 Guidelines for the encouragement of local innovations, cost-effective technology solutions, and business models for sanitation and solid waste management by several startups via investment in Research and Design (R&D) and facilitation in the Government e-Market portal.

Image Source


Also read: Rajarhat's construction waste recovery plant to begin work in April

On January 27, 2022, the centre launched the ‘Swachhata Startup Challenge’ in collaboration with the Department for Promotion of Industry and Internal Trade (DPIIT) for the promotion of an enabling environment to develop startups and entrepreneurs in the sector of waste management. Applications have been received from startups in the domain of four thematic areas identified which are, social inclusion, zero dump, plastic waste management, and transparency, these will be evaluated to check the quality of solutions offered. The scheme offers the ten best solutions by the startups to be chosen and every selected project will be provided with the financial support of Rs 25 lakh and dedicated incubation support of one year. Additionally, with the Swachhata Startup Challenge, the government also launched the Swachh Technology Challenge in December 2021. According to the Swachh Technology Challenge guidelines, the Urban Local Bodies (ULBs) have conducted the challenge and forwarded two best solutions to the State's post-evaluation of entries to select a maximum of three best entries. The ULBs in the country shall provide implementation support to the winners along with award money and State/City level felicitation. Furthermore, provisions are made under Swachh Bharat Mission or Urban 2.0 Guidelines for the encouragement of local innovations, cost-effective technology solutions, and business models for sanitation and solid waste management by several startups via investment in Research and Design (R&D) and facilitation in the Government e-Market portal. Image SourceAlso read: Rajarhat's construction waste recovery plant to begin work in April

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?