+
Small Project – BIG Solution for Dehradun Retired Couple
Products

Small Project – BIG Solution for Dehradun Retired Couple

By Suzan Chin-Taylor

In the southwest part of Dehradun, retired couple Mr. and Mrs. Mohan own a separated housing building with a large plot and generous portion of terrace space. Over the years, age of the structure and annual monsoon rains had impacted the home, primarily and extensively in the family’s downstairs dining room. The problems that come with interior damp walls and leakage were becoming a concern for the couple due to health reasons as well as the aesthetics. They began investigating new potential solutions for waterproofing, as prior applications of other popular and inexpensive products were not delivering the performance desired nor sealing off water ingress.

The Mohan’s learned of a new brand of waterproofing and heat resistant coatings, OBICCool by OBIC Solutions Pvt Ltd. Although unknown, the firm’s product was backed by an experienced team of IIT Bombay engineers, produced under the “Make in India” initiative and manufactured under stringent quality controls at an ISO 9000:2015 facility and this provided enough evidence and confidence to try this new product line.

The OBICCool product was somewhat more expensive than what they had used in the past, but they were anxious to see if it could truly deliver what it promised so they decided to have the coating applied in a 500 square foot potion of the roof where the water ingress into the dining room was coming from.

OBIC Solutions deployed its own application crews for the project. The area to be treated was first prepped and cleaned. The existing waterproofing material needed to be removed first and the surface made smooth. Once the surface was dry and ready for the next coat, white cement was mixed with this same OBICCool 100C material. The purpose of this is to fill any cracks and gaps in the substrate and completely seal the roof with the second coat. An initial coat of OBICCool 100C, a nano-enhanced absorption coat was applied to seal off any porous areas in the cement surface. These steps took 2 days and were performed by a crew of 3 members. The topcoats followed this process. The crew completed two topcoats in 6 hours. Normally, a four-layer system which uses a cement coat in between the absorption coat and the final topcoats is applied, however, due to budget constraints, OBIC Solutions was able to provide a solution using three coats along with the topcoats to successfully stop water ingress.


It has now been 9 months since the installation and even during heavy rains, the couple has reported that there is no water leakage, mold growth has not returned and the problem areas in the dining room are now fully dry and returned to a healthy, clean state.

For more information about OBIC Solutions high-tech, high-performance waterproofing products and installation, please visit obicsolutions.in or call +91 7078888215

By Suzan Chin-Taylor In the southwest part of Dehradun, retired couple Mr. and Mrs. Mohan own a separated housing building with a large plot and generous portion of terrace space. Over the years, age of the structure and annual monsoon rains had impacted the home, primarily and extensively in the family’s downstairs dining room. The problems that come with interior damp walls and leakage were becoming a concern for the couple due to health reasons as well as the aesthetics. They began investigating new potential solutions for waterproofing, as prior applications of other popular and inexpensive products were not delivering the performance desired nor sealing off water ingress. The Mohan’s learned of a new brand of waterproofing and heat resistant coatings, OBICCool by OBIC Solutions Pvt Ltd. Although unknown, the firm’s product was backed by an experienced team of IIT Bombay engineers, produced under the “Make in India” initiative and manufactured under stringent quality controls at an ISO 9000:2015 facility and this provided enough evidence and confidence to try this new product line. The OBICCool product was somewhat more expensive than what they had used in the past, but they were anxious to see if it could truly deliver what it promised so they decided to have the coating applied in a 500 square foot potion of the roof where the water ingress into the dining room was coming from. OBIC Solutions deployed its own application crews for the project. The area to be treated was first prepped and cleaned. The existing waterproofing material needed to be removed first and the surface made smooth. Once the surface was dry and ready for the next coat, white cement was mixed with this same OBICCool 100C material. The purpose of this is to fill any cracks and gaps in the substrate and completely seal the roof with the second coat. An initial coat of OBICCool 100C, a nano-enhanced absorption coat was applied to seal off any porous areas in the cement surface. These steps took 2 days and were performed by a crew of 3 members. The topcoats followed this process. The crew completed two topcoats in 6 hours. Normally, a four-layer system which uses a cement coat in between the absorption coat and the final topcoats is applied, however, due to budget constraints, OBIC Solutions was able to provide a solution using three coats along with the topcoats to successfully stop water ingress.It has now been 9 months since the installation and even during heavy rains, the couple has reported that there is no water leakage, mold growth has not returned and the problem areas in the dining room are now fully dry and returned to a healthy, clean state. For more information about OBIC Solutions high-tech, high-performance waterproofing products and installation, please visit obicsolutions.in or call +91 7078888215

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App