Tips for Concrete Equipment
Concrete

Tips for Concrete Equipment

Concrete equipment is designed to do a lot of very intricate and precise tasks. Like all superior equipment our intelligent and sophisticated pumps and equipment need maintenance when lying idle. The countrywide lockdown to prevent the spread of COVID-19 has resulted in a closure of all but essential activity. Putzmeister urges its customers with access to their machines to follow its Lockdown Maintenance Checklist. Its Service Engineers have put together tips that customers or their equipment operators can do themselves to keep the equipment in good working condition. Following these tips will help retain value of the equipment through the lockdown and help with smooth operations when activity resumes.

While many of the tips shared are common across concrete equipment, the checklist has been made with Putzmeister concrete equipment in mind. The firm advises others to check with their individual OEMs for the most suitable tips.

Stationary Concrete Pumps

  • Clean/remove concrete from all machine components.
  • Drain water out of water box/ tank and keep it empty.
  • It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods.
  • Drain water from the hydraulic tank once every 5 days.
  • Run the engine for 15 minutes every 5 days. This will keep the battery from draining.
  • Check all operations and functions.
  • Truck Mounted Concrete Pump

  • Clean/remove concrete from all machine components.
  • Drain water out of water box/ tank and keep it empty.
  • Store remote and cable inside the cabinet, away from moisture.
  • Disengage the hand break of the truck chassis, use tyre/wheel stoppers instead.
  • It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods including the 3rd arm boom cylinder rod.
  • Drain water from the hydraulic tank once every 5 days.
  • Run the engine for 15 minutes every 5 days. This will keep the battery from draining.
  • Check all operations and functions.
  • Batching Plant

  • Ensure the mixer is free of all concrete.
  • Regularly grease all greasing points, including points in the mixer shaft.
  • Apply grease to all open pneumatic cylinder rods.
  • Keep cement screw free of cement to prevent it from setting inside the screw.
  • Protect your wire rope by applying Cardium Compound.
  • Concrete equipment is designed to do a lot of very intricate and precise tasks. Like all superior equipment our intelligent and sophisticated pumps and equipment need maintenance when lying idle. The countrywide lockdown to prevent the spread of COVID-19 has resulted in a closure of all but essential activity. Putzmeister urges its customers with access to their machines to follow its Lockdown Maintenance Checklist. Its Service Engineers have put together tips that customers or their equipment operators can do themselves to keep the equipment in good working condition. Following these tips will help retain value of the equipment through the lockdown and help with smooth operations when activity resumes. While many of the tips shared are common across concrete equipment, the checklist has been made with Putzmeister concrete equipment in mind. The firm advises others to check with their individual OEMs for the most suitable tips. Stationary Concrete PumpsClean/remove concrete from all machine components. Drain water out of water box/ tank and keep it empty. It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods. Drain water from the hydraulic tank once every 5 days. Run the engine for 15 minutes every 5 days. This will keep the battery from draining. Check all operations and functions. Truck Mounted Concrete PumpClean/remove concrete from all machine components. Drain water out of water box/ tank and keep it empty. Store remote and cable inside the cabinet, away from moisture. Disengage the hand break of the truck chassis, use tyre/wheel stoppers instead. It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods including the 3rd arm boom cylinder rod. Drain water from the hydraulic tank once every 5 days. Run the engine for 15 minutes every 5 days. This will keep the battery from draining. Check all operations and functions. Batching PlantEnsure the mixer is free of all concrete. Regularly grease all greasing points, including points in the mixer shaft. Apply grease to all open pneumatic cylinder rods. Keep cement screw free of cement to prevent it from setting inside the screw. Protect your wire rope by applying Cardium Compound.

    Next Story
    Infrastructure Transport

    Mumbai’s Carnac Bridge Renamed Sindoor After Operation Sindoor

    The newly constructed Carnac Bridge in Mumbai, now officially renamed as Sindoor Bridge, was inaugurated on July 10, 2025, by Maharashtra Chief Minister Devendra Fadnavis. The decision to rename the bridge was linked to “Operation Sindoor,” a symbolic initiative aimed at erasing the colonial legacy associated with the original name.During the inauguration, Chief Minister Fadnavis explained that the renaming sought to wipe away a dark chapter of Indian history linked to British rule. He referred to historical accounts written by Prabodhankar Thackeray, which alleged that British Governor Ca..

    Next Story
    Infrastructure Transport

    Govt Plans 20-km Elevated Road Over Munak Canal for Rs 30 Bn

    In an effort to enhance Delhi's transport infrastructure and offer commuters an alternative travel route, the Delhi government has proposed the construction of a 20-kilometre-long elevated road over the Munak Canal, linking Inderlok to Bawana in northwest Delhi. Officials stated that the project, estimated to cost around Rs 30 billion, would benefit 18 assembly constituencies, two parliamentary constituencies, and 35 municipal wards. The construction is expected to take approximately three years from the commencement date. The Munak Canal, a 102-kilometre aqueduct running from Har..

    Next Story
    Infrastructure Transport

    NHAI Takes Charge of Two Major Expressway Projects in Rajasthan

    The National Highways Authority of India (NHAI) has taken over the construction of two major expressway projects in Rajasthan—Jaipur-to-Pachpadra and Bikaner-to-Kotputli—which were originally proposed by a state government agency following the previous budget announcement.Officials explained that both corridors were identified as highly viable due to the substantial traffic volumes they already handle. The Jaipur-to-Pachpadra greenfield expressway, spanning approximately 350 km, was initially planned at an estimated cost of ₹11,492 crore and was set to pass through Kishangarh, Ajmer, and..

    Advertisement

    Advertisement

    Subscribe to Our Newsletter

    Get daily newsletters around different themes from Construction world.

    STAY CONNECTED

    Advertisement

    Advertisement

    Advertisement

    Advertisement

    Talk to us?