Tips for Concrete Equipment
Concrete

Tips for Concrete Equipment

Concrete equipment is designed to do a lot of very intricate and precise tasks. Like all superior equipment our intelligent and sophisticated pumps and equipment need maintenance when lying idle. The countrywide lockdown to prevent the spread of COVID-19 has resulted in a closure of all but essential activity. Putzmeister urges its customers with access to their machines to follow its Lockdown Maintenance Checklist. Its Service Engineers have put together tips that customers or their equipment operators can do themselves to keep the equipment in good working condition. Following these tips will help retain value of the equipment through the lockdown and help with smooth operations when activity resumes.

While many of the tips shared are common across concrete equipment, the checklist has been made with Putzmeister concrete equipment in mind. The firm advises others to check with their individual OEMs for the most suitable tips.

Stationary Concrete Pumps

  • Clean/remove concrete from all machine components.
  • Drain water out of water box/ tank and keep it empty.
  • It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods.
  • Drain water from the hydraulic tank once every 5 days.
  • Run the engine for 15 minutes every 5 days. This will keep the battery from draining.
  • Check all operations and functions.
  • Truck Mounted Concrete Pump

  • Clean/remove concrete from all machine components.
  • Drain water out of water box/ tank and keep it empty.
  • Store remote and cable inside the cabinet, away from moisture.
  • Disengage the hand break of the truck chassis, use tyre/wheel stoppers instead.
  • It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods including the 3rd arm boom cylinder rod.
  • Drain water from the hydraulic tank once every 5 days.
  • Run the engine for 15 minutes every 5 days. This will keep the battery from draining.
  • Check all operations and functions.
  • Batching Plant

  • Ensure the mixer is free of all concrete.
  • Regularly grease all greasing points, including points in the mixer shaft.
  • Apply grease to all open pneumatic cylinder rods.
  • Keep cement screw free of cement to prevent it from setting inside the screw.
  • Protect your wire rope by applying Cardium Compound.
  • Your next big infra connection is waiting at RAHSTA 2025 – Asia’s Biggest Roads & Highways Expo, Jio World Convention Centre, Mumbai. Don’t miss out!

    Concrete equipment is designed to do a lot of very intricate and precise tasks. Like all superior equipment our intelligent and sophisticated pumps and equipment need maintenance when lying idle. The countrywide lockdown to prevent the spread of COVID-19 has resulted in a closure of all but essential activity. Putzmeister urges its customers with access to their machines to follow its Lockdown Maintenance Checklist. Its Service Engineers have put together tips that customers or their equipment operators can do themselves to keep the equipment in good working condition. Following these tips will help retain value of the equipment through the lockdown and help with smooth operations when activity resumes. While many of the tips shared are common across concrete equipment, the checklist has been made with Putzmeister concrete equipment in mind. The firm advises others to check with their individual OEMs for the most suitable tips. Stationary Concrete PumpsClean/remove concrete from all machine components. Drain water out of water box/ tank and keep it empty. It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods. Drain water from the hydraulic tank once every 5 days. Run the engine for 15 minutes every 5 days. This will keep the battery from draining. Check all operations and functions. Truck Mounted Concrete PumpClean/remove concrete from all machine components. Drain water out of water box/ tank and keep it empty. Store remote and cable inside the cabinet, away from moisture. Disengage the hand break of the truck chassis, use tyre/wheel stoppers instead. It is important to regularly grease all greasing points. You should also apply grease on all exposed hydraulic cylinder rods including the 3rd arm boom cylinder rod. Drain water from the hydraulic tank once every 5 days. Run the engine for 15 minutes every 5 days. This will keep the battery from draining. Check all operations and functions. Batching PlantEnsure the mixer is free of all concrete. Regularly grease all greasing points, including points in the mixer shaft. Apply grease to all open pneumatic cylinder rods. Keep cement screw free of cement to prevent it from setting inside the screw. Protect your wire rope by applying Cardium Compound.

    Next Story
    Real Estate

    Mumbai Records 11,230 Property Deals in August 2025

    Mumbai’s property market remained resilient in August 2025, with 11,230 property registrations recorded under the Brihanmumbai Municipal Corporation (BMC) jurisdiction, according to data released by Knight Frank India. While this marks a 3 per cent year-on-year (YoY) decline compared to 11,631 registrations in August 2024, activity stayed robust despite the marginal dip.On a month-on-month (MoM) basis, registrations fell 11 per cent from 12,579 deals in July 2025, indicating seasonal moderation. However, the city’s stamp duty collections still reached Rs 10 billion, reflecting a 6 per cent..

    Next Story
    Infrastructure Transport

    68 Jammu-Katra Trains Cancelled Amid Rain Damage

    Jammu and Katra railway services remain severely affected as Northern Railway announced the cancellation of 68 trains—both incoming and outgoing—until 30 September, due to extensive track damage caused by heavy rains and flash floods. Meanwhile, 24 trains are scheduled to resume operations gradually.The Jammu railway division has experienced a complete halt in services for the past eight days, following track misalignment and breaches at several points along the Pathankot–Jammu section. Torrential rainfall since 26 August led to widespread flooding and damage, stranding hundreds of passe..

    Next Story
    Infrastructure Transport

    Bangalore Metro MD Reviews Reach 6 and Phase 2A Progress

    Bangalore Metro Rail Corporation Limited (BMRCL) Managing Director, Dr J Ravishankar, IAS, conducted inspections of key metro corridors on 29 and 30 August, reviewing the progress of Reach 6 (Pink Line) and Phase 2A (Blue Line).On 30 August, the inspection covered Reach 6, a 21.39-km corridor stretching from Kalena Agrahara to Nagawara, with 18 stations. This stretch is part of Phase 2 of the Bangalore Metro project. Dr Ravishankar assessed the status of civil works, finishing, track laying, and system integration between Kalena Agrahara and MG Road.Earlier, on 29 August, the MD inspected Phas..

    Advertisement

    Subscribe to Our Newsletter

    Get daily newsletters around different themes from Construction world.

    STAY CONNECTED

    Advertisement

    Advertisement

    Advertisement

    Talk to us?