Coal Stocks at Power Plants Hold Above 18 mn t in October
COAL & MINING

Coal Stocks at Power Plants Hold Above 18 mn t in October

Coal stocks at domestic coal-based power plants have remained above 18 mn t since September 29, with inventories standing at 18.205 mn t on October 10, compared with 18.932 mn t on September 29. The stability indicates that coal supplies have broadly kept pace with daily consumption at generating stations.

Supplies to plants with critically low inventories are being monitored, while coal is being redistributed to vulnerable stations according to their requirements. The measures are intended to maintain adequate availability and support uninterrupted power generation across the country. Stocks increased on October 2 and October 10, by 0.024 mn t and 0.017 mn t respectively.

The Ministry of Coal said stocks declined by about 7.28 mn t in September, an average reduction of 0.24 mn t a day. During the first 10 days of October, the decline slowed to 0.56 mn t, or about 0.06 mn t a day, indicating a substantial moderation in depletion compared with the previous month.

The improvement followed higher rake loading for the power sector. An average of 469 rakes was supplied daily between October 1 and October 10, up from 426 rakes a day in September, representing an increase of about 10 per cent. Daily loading during the period ranged from 447 to 482 rakes.

Average daily coal supply to the power sector rose to 2.49 mn t in October from 2.21 mn t in September. Supply exceeded the planned daily level of 2.37 mn t on nine of the first 10 days of the month. The Ministry is coordinating with Coal India, SCCL, the Ministry of Railways and power utilities to sustain coal evacuation and deliveries. It also acknowledged Indian Railways' support in facilitating coal movement to thermal power plants.

Coal stocks at domestic coal-based power plants have remained above 18 mn t since September 29, with inventories standing at 18.205 mn t on October 10, compared with 18.932 mn t on September 29. The stability indicates that coal supplies have broadly kept pace with daily consumption at generating stations. Supplies to plants with critically low inventories are being monitored, while coal is being redistributed to vulnerable stations according to their requirements. The measures are intended to maintain adequate availability and support uninterrupted power generation across the country. Stocks increased on October 2 and October 10, by 0.024 mn t and 0.017 mn t respectively. The Ministry of Coal said stocks declined by about 7.28 mn t in September, an average reduction of 0.24 mn t a day. During the first 10 days of October, the decline slowed to 0.56 mn t, or about 0.06 mn t a day, indicating a substantial moderation in depletion compared with the previous month. The improvement followed higher rake loading for the power sector. An average of 469 rakes was supplied daily between October 1 and October 10, up from 426 rakes a day in September, representing an increase of about 10 per cent. Daily loading during the period ranged from 447 to 482 rakes. Average daily coal supply to the power sector rose to 2.49 mn t in October from 2.21 mn t in September. Supply exceeded the planned daily level of 2.37 mn t on nine of the first 10 days of the month. The Ministry is coordinating with Coal India, SCCL, the Ministry of Railways and power utilities to sustain coal evacuation and deliveries. It also acknowledged Indian Railways' support in facilitating coal movement to thermal power plants.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Welspun One unveils Diwali campaign for World Trade Center Thane

Welspun One has unveiled A Dream Diwali, a festive brand film promoting World Trade Center Thane, its proposed mixed-use development in the Mumbai Metropolitan Region (MMR). The campaign uses individual interpretations of an ideal Diwali to introduce the experiences and offerings planned at the development.The film follows different characters as they share their festive wishes and go about activities such as shopping, meeting friends, playing games and spending time with family. Through these everyday moments, the campaign presents the idea that celebrations are personal and that different ge..

Next Story
Equipment

BorgWarner secures three turbocharger contracts with global powertrain leader

BorgWarner has secured three new turbocharger contracts with a global powertrain technology company. The wins comprise one contract for its variable turbine geometry (VTG) turbocharger and two for its wastegate turbocharger. The technologies will be deployed in the customer's light-vehicle gasoline platforms in South America and Europe, with production scheduled to begin in 2027.The VTG turbochargers are designed for gasoline engines operating under demanding conditions and high-boost pressure requirements. They are engineered to support Miller-cycle engines and withstand exhaust temperatures ..

Next Story
Infrastructure Transport

International Digi Yatra Trials Begin at Seven Airports

India has begun trials of Digi Yatra for international passengers at seven airports, allowing eligible Indian passport holders to use facial recognition at selected airport checkpoints. The facility is currently limited to Indian nationals with e-passports travelling on selected international flights operated by Air India and IndiGo. The Civil Aviation Ministry announced the trials on 1 November, with testing scheduled through December 2026. A wider rollout is expected in 2027 after the ministry assesses passenger feedback gathered during the trial period, according to PTI. The system is inten..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code