Gevra becomes India's first coal mine to reach 50 mt output
COAL & MINING

Gevra becomes India's first coal mine to reach 50 mt output

Gevra coal mine in Chhattisgarh's Korba district has become the country's first to produce 50 million tonnes. The mine is operated by South Eastern Coalfields (SECL), one of Coal India's largest coal producing subsidiaries.

"A Historic Moment for the Coal Sector For the first time ever in India, a coal mine has breached the 50 MT production mark. Congratulations to the team of @secl_cil on getting Gevra mine's name written in gold letters in the history of India's coal sector," Pralhad Joshi, Union Minister of Coal and Mines said in a tweet. About 700 personnel work per shift in the Gevra mine.

When the milestone was reached, CMD Prem Sagar Mishra and FDs visited the Gevra project, met with, and congratulated the entire team. He also interacted with officers and HoDs in the area. The Gevra mine has set a 52 million tonne target for this year, which it expects to meet before the end of the fiscal year.

Gevra mine has distinguished itself among Coal India's projects by incorporating modern and environmentally friendly mining technology. In mining, blasting free surface mining technology is used, while rapid loading systems with conveyor belt equipped silos are used for coal transportation.

Also Read
29% of India’s hydropower potential already utilised
Completion certificate received by H.G. Infra for Rajasthan project

Gevra coal mine in Chhattisgarh's Korba district has become the country's first to produce 50 million tonnes. The mine is operated by South Eastern Coalfields (SECL), one of Coal India's largest coal producing subsidiaries. A Historic Moment for the Coal Sector For the first time ever in India, a coal mine has breached the 50 MT production mark. Congratulations to the team of @secl_cil on getting Gevra mine's name written in gold letters in the history of India's coal sector, Pralhad Joshi, Union Minister of Coal and Mines said in a tweet. About 700 personnel work per shift in the Gevra mine. When the milestone was reached, CMD Prem Sagar Mishra and FDs visited the Gevra project, met with, and congratulated the entire team. He also interacted with officers and HoDs in the area. The Gevra mine has set a 52 million tonne target for this year, which it expects to meet before the end of the fiscal year. Gevra mine has distinguished itself among Coal India's projects by incorporating modern and environmentally friendly mining technology. In mining, blasting free surface mining technology is used, while rapid loading systems with conveyor belt equipped silos are used for coal transportation. Also Read 29% of India’s hydropower potential already utilised Completion certificate received by H.G. Infra for Rajasthan project

Next Story
Building Material

Trishakti Industries Secures Major Tata Steel Order

Trishakti Industries Limited has secured a significant order from Tata Steel Ltd for the deployment of advanced machinery and skilled manpower at one of the steel major’s flagship project sites.The contract, awarded domestically, involves the hiring of machines along with manpower, with execution set to be completed by 20th September 2025. The initial contract period is 12 months. The total fresh capital expenditure for the project is approximately Rs 1.5 million, while the overall contract value is expected to exceed Rs 5 million inclusive of taxes.This order marks a reinforcement of top-ti..

Next Story
Real Estate

Kalpataru Projects Secures Rs 27.2 Billion in New Orders

Kalpataru Projects International Limited (KPIL), a leading EPC player in the power transmission and distribution (T&D) and civil infrastructure sector, along with its international subsidiaries, has received new orders and notifications for projects worth approximately Rs 27.2 billion.The projects include:Power Transmission & Distribution (T&D) initiatives in India and overseas.Buildings and Factories (B&F) projects in India.Manish Mohnot, MD & CEO of KPIL, said, “We are delighted with the strong ordering momentum in our T&D and B&F businesses. The orders include ..

Next Story
Infrastructure Energy

ACME Solar Secures Rs 38.92 Billion Financing for Barmer Project

ACME Solar Holdings rose 2.05 per cent to Rs 308.50 after its wholly owned subsidiary, ACME Venus Urja, secured long-term project financing of Rs 38.92 billion from the State Bank of India (SBI).The funds will be utilised for the development and construction of a 400 MW Firm and Dispatchable Renewable Energy (FDRE) project in Barmer, Rajasthan. The loan repayment is structured over 19 years.The Barmer-based FDRE project is contracted with NHPC at a tariff of Rs 4.64 per unit. It will integrate solar power generation with a Battery Energy Storage System (BESS) to ensure higher reliability and d..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?