+
ONGC set to award contracts to hire six oil rigs a day
OIL & GAS

ONGC set to award contracts to hire six oil rigs a day

After concluding pricing discussions following a global tender, state-owned Oil and Natural Gas Corporation Ltd (ONGC) is prepared to contract six oil drilling rigs, including one from Greatship (India) Ltd, for day rates ranging between $78,000 and $80,000, according to numerous sources.

The largest private ocean carrier in India, Great Eastern Shipping Co Ltd, has an offshore division called Greatship (India) Ltd. The largest oil and gas explorer in India will sign three-year contracts to charter three jack-up rigs from companies in Dubai, Abu Dhabi, and Dubai, including two from Shelf Drilling Ltd., one from Jindal Drilling & Industries Ltd., and two from Foresight Offshore Drilling Ltd.

Based on the rig design and usage for drilling new wells and performing work on existing fields, the State-run company's 12 rig tender was divided into three groups. The first group includes the six oil drilling rigs that will be awarded.

ONGC normally engages in price discussions with the lowest bidders in each category after the price bids are opened to decrease their quoted prices. On this basis, the other bidders are then required to match the reduced rates before the contracts are finalised.

"All of the rig operators that submitted the lowest bids for the tender remained steadfast in their pricing despite a recent sharp increase in the worldwide rates for hiring rigs. As a result, ONGC was only able to slightly lower the charges "a representative briefed on the development stated. With the lowest bidders, ONGC is currently discussing the prices for Category 2 and 3 rigs. Four rigs each from these two groups will be hired by the oil company.

After struggling for a while, the offshore oil drilling business has recovered, with day rates for three- year contracts in the crucial Middle East region rising to $110,000 from $50,000.

The price of some of ONGC's most recent rig hire contracts was between $45,000 and $48,000 per day, which was more expensive than the day cost of mid-$20,000 decided upon almost two years ago.

After concluding pricing discussions following a global tender, state-owned Oil and Natural Gas Corporation Ltd (ONGC) is prepared to contract six oil drilling rigs, including one from Greatship (India) Ltd, for day rates ranging between $78,000 and $80,000, according to numerous sources. The largest private ocean carrier in India, Great Eastern Shipping Co Ltd, has an offshore division called Greatship (India) Ltd. The largest oil and gas explorer in India will sign three-year contracts to charter three jack-up rigs from companies in Dubai, Abu Dhabi, and Dubai, including two from Shelf Drilling Ltd., one from Jindal Drilling & Industries Ltd., and two from Foresight Offshore Drilling Ltd. Based on the rig design and usage for drilling new wells and performing work on existing fields, the State-run company's 12 rig tender was divided into three groups. The first group includes the six oil drilling rigs that will be awarded. ONGC normally engages in price discussions with the lowest bidders in each category after the price bids are opened to decrease their quoted prices. On this basis, the other bidders are then required to match the reduced rates before the contracts are finalised. All of the rig operators that submitted the lowest bids for the tender remained steadfast in their pricing despite a recent sharp increase in the worldwide rates for hiring rigs. As a result, ONGC was only able to slightly lower the charges a representative briefed on the development stated. With the lowest bidders, ONGC is currently discussing the prices for Category 2 and 3 rigs. Four rigs each from these two groups will be hired by the oil company. After struggling for a while, the offshore oil drilling business has recovered, with day rates for three- year contracts in the crucial Middle East region rising to $110,000 from $50,000. The price of some of ONGC's most recent rig hire contracts was between $45,000 and $48,000 per day, which was more expensive than the day cost of mid-$20,000 decided upon almost two years ago.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App