Adani Energy Solutions Acquires Satara Power Transmission
POWER & RENEWABLE ENERGY

Adani Energy Solutions Acquires Satara Power Transmission

Adani Energy Solutions has completed the acquisition of 100% of the equity shares of Satara Power Transmission. The company executed a share purchase agreement with PFC Consulting on 6 October 2026 at about 5:00 p.m. IST and informed the stock exchanges under Regulation 30 of the Securities and Exchange Board of India’s listing disclosure rules.

The transaction was conducted for cash, with the shares acquired at a face value of Rs. 10 each. Satara Power Transmission has authorised and paid-up share capital of Rs. 0.1 mn each. The transaction is not classified as a related-party transaction, and no governmental or regulatory approvals were required for its completion.

The acquired entity is associated with Adani Energy Solutions’ earlier award of a Rs. 47 bn transmission project in Maharashtra. That project, disclosed on 26 August 2026, is intended to evacuate 4,500 MW of renewable and storage power through infrastructure supporting regional grid connectivity.

Satara Power Transmission has been planned to facilitate an additional 765 kV inter-regional corridor connecting the Southern and Western Region grids. The Narendra–Kolhapur–Satara–Pune III/Pune East corridor is expected to support the movement of renewable power from Karnataka to load centres and pumped storage projects in Satara, Pune and the Mumbai Metropolitan Region.

Satara Power Transmission was incorporated in India on 10 July 2026 and is registered with the Registrar of Companies in New Delhi. Adani Energy Solutions said the acquisition forms part of its strategy to pursue organic and inorganic growth in the transmission sector and enhance shareholder value. Detailed disclosures were submitted to BSE under Scrip Code 539254 and to NSE under Scrip Code ADANIENSOL.

Adani Energy Solutions has completed the acquisition of 100% of the equity shares of Satara Power Transmission. The company executed a share purchase agreement with PFC Consulting on 6 October 2026 at about 5:00 p.m. IST and informed the stock exchanges under Regulation 30 of the Securities and Exchange Board of India’s listing disclosure rules. The transaction was conducted for cash, with the shares acquired at a face value of Rs. 10 each. Satara Power Transmission has authorised and paid-up share capital of Rs. 0.1 mn each. The transaction is not classified as a related-party transaction, and no governmental or regulatory approvals were required for its completion. The acquired entity is associated with Adani Energy Solutions’ earlier award of a Rs. 47 bn transmission project in Maharashtra. That project, disclosed on 26 August 2026, is intended to evacuate 4,500 MW of renewable and storage power through infrastructure supporting regional grid connectivity. Satara Power Transmission has been planned to facilitate an additional 765 kV inter-regional corridor connecting the Southern and Western Region grids. The Narendra–Kolhapur–Satara–Pune III/Pune East corridor is expected to support the movement of renewable power from Karnataka to load centres and pumped storage projects in Satara, Pune and the Mumbai Metropolitan Region. Satara Power Transmission was incorporated in India on 10 July 2026 and is registered with the Registrar of Companies in New Delhi. Adani Energy Solutions said the acquisition forms part of its strategy to pursue organic and inorganic growth in the transmission sector and enhance shareholder value. Detailed disclosures were submitted to BSE under Scrip Code 539254 and to NSE under Scrip Code ADANIENSOL.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Vaishnaw Inaugurates Two Rail Sections in Madhya Pradesh

Railway Minister Ashwini Vaishnaw on October 24 inaugurated the Satna-Devendranagar and Rewa-Churhat rail sections under the Lalitpur-Singrauli Railway Project in Madhya Pradesh. He also flagged off the new Devendranagar-Churhat passenger train service through video conferencing. Chief Minister Dr Mohan Yadav attended the event. The new Rewa-Churhat railway line, which extends approximately 65 km, was built at a cost of over Rs. 10 bn. The 53 km Satna-Devendranagar line was constructed at a cost of over Rs. 8 bn. The passenger service is expected to provide improved rail access to residents in..

Next Story
Infrastructure Transport

Railways Minister to Inaugurate New Rail Sections Covering 118 km

Railways Minister Ashwini Vaishnaw will inaugurate the Satna-Devendra Nagar and Rewa-Churhat rail sections in Madhya Pradesh on October 24. The two sections have a combined length of 118 km and are intended to improve passenger and freight connectivity across the region. Vaishnaw will also flag off a new train service between Devendra Nagar and Churhat. Madhya Pradesh Chief Minister Mohan Yadav will attend the inauguration programme, according to information released by the Ministry of Railways. The 53-km Satna-Devendra Nagar section is expected to improve rail access to Satna, Nagod, Devendra..

Next Story
Infrastructure Transport

ARSS SCPL JV Secures Rs. 2.4 bn Railway Doubling Contract

ARSS Infrastructure Projects said its joint venture, ARSS SCPL JV, has secured an engineering, procurement and construction (EPC) contract valued at Rs. 2.4 bn from East Central Railway. The project involves railway doubling works in Jharkhand and forms part of the Koderma–Arigada railway doubling initiative. The contract covers a 29.5-km railway stretch between Kathuatia and Hazaribagh Town stations in the Dhanbad Division. The work is intended to add a second railway line along the identified section and includes the construction and installation activities required for the upgraded corrid..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code