Adani Green's Renewable Capacity Rises to 13,487.8 MW
POWER & RENEWABLE ENERGY

Adani Green's Renewable Capacity Rises to 13,487.8 MW

Adani Green Energy Limited (AGEL) announced that its renewable energy generation capacity has increased to 13,487.8 MW following the commissioning of new projects. In a stock exchange filing, AGEL stated that it has operationalised a combined 396.7 MW of power projects at Khavda in Gujarat via its wholly-owned step-down subsidiaries.

With the commissioning of these projects, the company's total operational renewable generation capacity now stands at 13,487.8 MW, AGEL confirmed.

Adani Renewable Energy Fifty Six Limited and Adani Green Energy Twenty Four A Limited have commissioned solar projects of 200 MW and 87.5 MW respectively, while Adani Renewable Energy Forty One Limited has commissioned a 109.2-MW wind energy project.

Adani Green Energy Limited (AGEL) announced that its renewable energy generation capacity has increased to 13,487.8 MW following the commissioning of new projects. In a stock exchange filing, AGEL stated that it has operationalised a combined 396.7 MW of power projects at Khavda in Gujarat via its wholly-owned step-down subsidiaries. With the commissioning of these projects, the company's total operational renewable generation capacity now stands at 13,487.8 MW, AGEL confirmed. Adani Renewable Energy Fifty Six Limited and Adani Green Energy Twenty Four A Limited have commissioned solar projects of 200 MW and 87.5 MW respectively, while Adani Renewable Energy Forty One Limited has commissioned a 109.2-MW wind energy project.

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->