BHEL floats tender for supplying multicrystalline solar modules
POWER & RENEWABLE ENERGY

BHEL floats tender for supplying multicrystalline solar modules

Bharat Heavy Electricals Ltd (BHEL) has floated tenders for multi-crystalline solar modules manufacturers for the 6.5 MW rooftop solar project in Nalanda, Bihar.

The deadline to submit the bids is 24 August 2021, and the tenders will be opened on the same date.

To participate in the bidding, the annual turnover of the bidder should be Rs 45 million in the last three financial years (FYs).

The winning bidder has to provide insurance for the solar module power output warranty that covers the warranty of the solar module in case of any insolvency of the module manufacturer. The bidder has to submit a bank guarantee of 10% as the value in the tender if the bidder cannot provide insurance for the solar modules.

The successful bidder has to supply 72-cell multi-crystalline solar modules in a configuration of 12*6 or 144-cell in 24*6 configuration. The modules' wattage output should be more than 325 Wp or 5 W band.

The solar modules should be certified by the Bureau of Indian Standards.

The modules should have a minimum efficiency of 16.5%, and they should work satisfactorily between the temperature range of -10 degrees centigrade and 85-degree centigrade. The modules should withstand gusts to 140 km per hour on the surface panel.

As per the tender, the warranty of the modules should be at least ten years, and the degradation rate of the modules should not be less than 90% after ten years and 80% after 25 years.

The glass used in the solar modules should be toughened, high transmission, low iron, with a minimum thickness of 3.2 millimetres (mm) and the bending should be less than 0.3%. In crystalline silicon modules, the back sheet should be 30 microns and water vapour transmission rate less than 2 grams (gm) per metre square (m2) daily.

Image Source


Also read: Mumbai civic body seeks EC for 4 MW Deonar waste-to-energy plant

Bharat Heavy Electricals Ltd (BHEL) has floated tenders for multi-crystalline solar modules manufacturers for the 6.5 MW rooftop solar project in Nalanda, Bihar. The deadline to submit the bids is 24 August 2021, and the tenders will be opened on the same date. To participate in the bidding, the annual turnover of the bidder should be Rs 45 million in the last three financial years (FYs). The winning bidder has to provide insurance for the solar module power output warranty that covers the warranty of the solar module in case of any insolvency of the module manufacturer. The bidder has to submit a bank guarantee of 10% as the value in the tender if the bidder cannot provide insurance for the solar modules. The successful bidder has to supply 72-cell multi-crystalline solar modules in a configuration of 12*6 or 144-cell in 24*6 configuration. The modules' wattage output should be more than 325 Wp or 5 W band. The solar modules should be certified by the Bureau of Indian Standards. The modules should have a minimum efficiency of 16.5%, and they should work satisfactorily between the temperature range of -10 degrees centigrade and 85-degree centigrade. The modules should withstand gusts to 140 km per hour on the surface panel. As per the tender, the warranty of the modules should be at least ten years, and the degradation rate of the modules should not be less than 90% after ten years and 80% after 25 years. The glass used in the solar modules should be toughened, high transmission, low iron, with a minimum thickness of 3.2 millimetres (mm) and the bending should be less than 0.3%. In crystalline silicon modules, the back sheet should be 30 microns and water vapour transmission rate less than 2 grams (gm) per metre square (m2) daily. Image Source Also read: Mumbai civic body seeks EC for 4 MW Deonar waste-to-energy plant

Next Story
Real Estate

CREDAI-MCHI to Host 10th Design & Construction Conference

CREDAI-MCHI will host the 10th anniversary edition of its Design & Construction Conference on August 19, 2026, at the Jio World Convention Centre in Mumbai.The event is expected to bring together more than 500 procurement leaders, construction heads, architects, consultants and senior real estate decision-makers, alongside over 50 construction and ancillary brands.The conference will feature product launches, technology showcases, knowledge sessions, strategic business-to-business networking and recognition of procurement professionals contributing to the transformation of the construction..

Next Story
Infrastructure Energy

BorgWarner Wins Extension for High-Voltage Inverter Programmes

BorgWarner has secured a major extension of several high-volume high-voltage inverter programmes from a leading European automotive manufacturer.The contracts cover updated inverter designs for plug-in hybrid and 800V battery-electric vehicle applications. Production is scheduled to begin in 2029.Isabelle McKenzie, President and General Manager, BorgWarner PowerDrive Systems, said the programme extensions demonstrate the company’s position in power electronics and reflect the strength of its technology, in-house expertise and customer relationships.For plug-in hybrid vehicles, BorgWarner wil..

Next Story
Infrastructure Urban

Castrol India Q2 Profit Rises 43% to Rs 3.48 bn

Castrol India reported a 43 per cent year-on-year increase in profit after tax to Rs 3.48 billion for the quarter ended June 30, 2026, supported by growth across its consumer, industrial and institutional businesses.Revenue from operations increased 25 per cent to Rs 18.71 billion during the second quarter of 2026, compared with Rs 14.97 billion in the corresponding period of 2025. EBITDA rose 41 per cent to Rs 4.94 billion from Rs 3.50 billion.Sequentially, revenue increased from Rs 15.45 billion in the first quarter of 2026, while EBITDA rose from Rs 3.29 billion. Profit after tax increased ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement