+
BHEL floats tender for supplying multicrystalline solar modules
POWER & RENEWABLE ENERGY

BHEL floats tender for supplying multicrystalline solar modules

Bharat Heavy Electricals Ltd (BHEL) has floated tenders for multi-crystalline solar modules manufacturers for the 6.5 MW rooftop solar project in Nalanda, Bihar.

The deadline to submit the bids is 24 August 2021, and the tenders will be opened on the same date.

To participate in the bidding, the annual turnover of the bidder should be Rs 45 million in the last three financial years (FYs).

The winning bidder has to provide insurance for the solar module power output warranty that covers the warranty of the solar module in case of any insolvency of the module manufacturer. The bidder has to submit a bank guarantee of 10% as the value in the tender if the bidder cannot provide insurance for the solar modules.

The successful bidder has to supply 72-cell multi-crystalline solar modules in a configuration of 12*6 or 144-cell in 24*6 configuration. The modules' wattage output should be more than 325 Wp or 5 W band.

The solar modules should be certified by the Bureau of Indian Standards.

The modules should have a minimum efficiency of 16.5%, and they should work satisfactorily between the temperature range of -10 degrees centigrade and 85-degree centigrade. The modules should withstand gusts to 140 km per hour on the surface panel.

As per the tender, the warranty of the modules should be at least ten years, and the degradation rate of the modules should not be less than 90% after ten years and 80% after 25 years.

The glass used in the solar modules should be toughened, high transmission, low iron, with a minimum thickness of 3.2 millimetres (mm) and the bending should be less than 0.3%. In crystalline silicon modules, the back sheet should be 30 microns and water vapour transmission rate less than 2 grams (gm) per metre square (m2) daily.

Image Source


Also read: Mumbai civic body seeks EC for 4 MW Deonar waste-to-energy plant

Bharat Heavy Electricals Ltd (BHEL) has floated tenders for multi-crystalline solar modules manufacturers for the 6.5 MW rooftop solar project in Nalanda, Bihar. The deadline to submit the bids is 24 August 2021, and the tenders will be opened on the same date. To participate in the bidding, the annual turnover of the bidder should be Rs 45 million in the last three financial years (FYs). The winning bidder has to provide insurance for the solar module power output warranty that covers the warranty of the solar module in case of any insolvency of the module manufacturer. The bidder has to submit a bank guarantee of 10% as the value in the tender if the bidder cannot provide insurance for the solar modules. The successful bidder has to supply 72-cell multi-crystalline solar modules in a configuration of 12*6 or 144-cell in 24*6 configuration. The modules' wattage output should be more than 325 Wp or 5 W band. The solar modules should be certified by the Bureau of Indian Standards. The modules should have a minimum efficiency of 16.5%, and they should work satisfactorily between the temperature range of -10 degrees centigrade and 85-degree centigrade. The modules should withstand gusts to 140 km per hour on the surface panel. As per the tender, the warranty of the modules should be at least ten years, and the degradation rate of the modules should not be less than 90% after ten years and 80% after 25 years. The glass used in the solar modules should be toughened, high transmission, low iron, with a minimum thickness of 3.2 millimetres (mm) and the bending should be less than 0.3%. In crystalline silicon modules, the back sheet should be 30 microns and water vapour transmission rate less than 2 grams (gm) per metre square (m2) daily. Image Source Also read: Mumbai civic body seeks EC for 4 MW Deonar waste-to-energy plant

Next Story
Infrastructure Urban

Naidu Seeks Rs 563 Crore For AP Sports Infrastructure

Andhra Pradesh Chief Minister N Chandrababu Naidu has sought Rs 563 crore from the Centre to boost sports infrastructure in the state, including Rs 538 crore for stadium development and Rs 25 crore to host the Khelo India Martial Arts Games 2025. Naidu made the request during a meeting with Union Youth Services and Sports Minister Mansukh Mandaviya in New Delhi on Wednesday.The CM urged early completion of Khelo India infrastructure projects in Tirupati, Rajahmundry, Kakinada, and Narasaraopeta, and called for an international-standard badminton training centre and a national aquatic sports hu..

Next Story
Infrastructure Transport

Tough Bidding Norms Slow NHAI Road Project Awards

Stringent bidding rules imposed by the Ministry of Road Transport & Highways (MoRTH) have led to a slowdown in project awards by the National Highways Authority of India (NHAI), despite a robust Rs 3.5 trillion pipeline. According to an HDFC Securities report, the shift to more cautious developer models now favours firms with strong balance sheets, as tighter qualification norms limit aggressive bidders.The revised norms mandate additional performance security, targeting the exclusion of players that previously submitted low bids—often 25 to 40 per cent below NHAI cost estimates—raisin..

Next Story
Infrastructure Transport

Mumbai Gets Coastal Nod for Next Promenade Phase

As Mumbai prepares to open two major sections of its expansive seafront promenade this week, the city’s civic authority has secured a key coastal clearance to advance further construction. The Maharashtra Coastal Zone Management Authority (MCZMA) has approved the commencement of work on the segment between Haji Ali and Baroda Palace, with tendering expected soon after project cost assessments.The promenade, stretching 7.5 km in length and 20 metres wide, is being designed as a flagship open space for walkers, joggers, and cyclists. Two critical stretches—2.75 km from Tata Garden to Haji Al..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?