Govern. Launches Mission to Develop Emerging Tech In Power
POWER & RENEWABLE ENERGY

Govern. Launches Mission to Develop Emerging Tech In Power

The Mission on Advanced and High-Impact Research (MAHIR), a national project to develop, scale, and implement homegrown technological advancements in India's power sector, was started by the Ministries of Power (MoP) and New and Renewable Energy (MNRE).

The mission intends to support new technology research, development, and demonstration while assisting the government in advancing these technologies to the implementation stage. Initially slated to run from 2023–2024 to 2027–2028, MAHIR will use the Idea to Product technology life cycle strategy.

The MoP, MNRE, and Central Public Sector Enterprises will pay for it.

For the initial research under the mission, eight target areas have been designated, including solid- state refrigeration, carbon capture, alternatives to lithium-ion batteries, green hydrogen for mobility, and high-efficiency fuel cells.

The two-tier organisation of MAHIR will consist of an Apex Committee and a Technical Scoping Committee.

The Apex Committee will approve the research proposals and keep track of the research progress after the TSC surveys and identifies the current and emerging research areas around the world.

The Mission on Advanced and High-Impact Research (MAHIR), a national project to develop, scale, and implement homegrown technological advancements in India's power sector, was started by the Ministries of Power (MoP) and New and Renewable Energy (MNRE). The mission intends to support new technology research, development, and demonstration while assisting the government in advancing these technologies to the implementation stage. Initially slated to run from 2023–2024 to 2027–2028, MAHIR will use the Idea to Product technology life cycle strategy. The MoP, MNRE, and Central Public Sector Enterprises will pay for it. For the initial research under the mission, eight target areas have been designated, including solid- state refrigeration, carbon capture, alternatives to lithium-ion batteries, green hydrogen for mobility, and high-efficiency fuel cells. The two-tier organisation of MAHIR will consist of an Apex Committee and a Technical Scoping Committee. The Apex Committee will approve the research proposals and keep track of the research progress after the TSC surveys and identifies the current and emerging research areas around the world.

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Viaduct and Piers Work Completed: NHSRCL

The Mumbai-Ahmedabad bullet train project, India's first high-speed rail corridor, has reached significant construction milestones with more than 300 km of viaduct completed and ongoing progress on trackbed works.The National High Speed Rail Corporation (NHSRCL), the implementing agency for the project, reported that 304 km of viaduct and 388 km of pier work have been finished. Additionally, the construction of 14 river bridges, 7 steel bridges, and 5 prestressed concrete bridges has been completed.Trackbed construction is advancing steadily, with 163 km completed so far. The Vapi bullet train..

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Project Slab Casting Starts at Virar Station

The Mumbai-Ahmedabad Bullet Train Project has advanced with the commencement of casting the first slab at the Virar Bullet Train station. A total of nine slabs will be constructed at this level, which will serve as the foundation for track laying at the station.The Virar Bullet Train station is designed to have two levels—a concourse level and a rail level—extending to a total length of 425 meters.The first slab cast measures 50 meters in length and 35.32 meters in width, with an approximate thickness of 300 mm. This slab required 1,555 cubic meters of concrete.In recent developments, the ..

Next Story
Infrastructure Transport

Konkan Railway Plans Ro-Ro Train Service to Transport Cars

The Konkan Railway (KR) is considering the possibility of introducing a special roll-on/roll-off (Ro-Ro) train service for car transportation during the upcoming Ganapati festival, provided there is sufficient public demand. The operation of this service would require a minimum of 40 cars to be transported at once.Traditionally, the KR Ro-Ro service has been used for trucks, allowing vehicles to be transported along with their drivers. Over the past 15 months, the corporation secured projects worth Rs 31.50 billion through tendering and is currently executing works valued at Rs 40.87 billion.K..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?