India to Add 337,900 MW Power Capacity by 2032: MoS Naik
POWER & RENEWABLE ENERGY

India to Add 337,900 MW Power Capacity by 2032: MoS Naik

India is set to significantly enhance its power generation capacity, with plans to add approximately 337,900 megawatts (MW) by 2032. This ambitious goal, announced by Minister of State (MoS) for Power, Shripad Naik, is aimed at addressing the increasing energy demands and supporting the country?s economic growth.

The expansion will involve a mix of renewable energy sources, such as solar and wind, alongside traditional power generation methods. This diversified approach is intended to ensure a stable and sustainable energy supply while reducing reliance on fossil fuels.

The planned capacity increase is part of the government's broader strategy to enhance the energy infrastructure, improve efficiency, and meet the needs of a growing population and industrial sector. By focusing on both renewable and conventional sources, the initiative aims to support India's energy transition goals and reduce carbon emissions.

As part of this plan, the government will also invest in modernising the grid infrastructure and developing advanced technologies to optimise energy distribution. This substantial investment in power infrastructure is expected to create job opportunities and contribute to economic development across various regions.

Overall, this expansion reflects India's commitment to strengthening its energy sector and supporting long-term sustainable growth.

India is set to significantly enhance its power generation capacity, with plans to add approximately 337,900 megawatts (MW) by 2032. This ambitious goal, announced by Minister of State (MoS) for Power, Shripad Naik, is aimed at addressing the increasing energy demands and supporting the country?s economic growth. The expansion will involve a mix of renewable energy sources, such as solar and wind, alongside traditional power generation methods. This diversified approach is intended to ensure a stable and sustainable energy supply while reducing reliance on fossil fuels. The planned capacity increase is part of the government's broader strategy to enhance the energy infrastructure, improve efficiency, and meet the needs of a growing population and industrial sector. By focusing on both renewable and conventional sources, the initiative aims to support India's energy transition goals and reduce carbon emissions. As part of this plan, the government will also invest in modernising the grid infrastructure and developing advanced technologies to optimise energy distribution. This substantial investment in power infrastructure is expected to create job opportunities and contribute to economic development across various regions. Overall, this expansion reflects India's commitment to strengthening its energy sector and supporting long-term sustainable growth.

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?