ITI Invites EoI for 2 MW Rooftop Solar Systems in Odisha
POWER & RENEWABLE ENERGY

ITI Invites EoI for 2 MW Rooftop Solar Systems in Odisha

ITI, a public sector undertaking under the Department of Telecommunications, has issued an expression of interest (EoI) for the installation of 2 MW off-grid rooftop solar systems across Odisha. The deadline for submitting bids is January 24, 2025, with the bids to be opened on the same day.

Bidders are required to submit an earnest money deposit of Rs 0.3 million and a document fee of Rs 5,900, including GST. The selected bidders will be responsible for designing, engineering, supplying, installing, testing, and commissioning the rooftop solar systems. Additionally, they will need to provide comprehensive operations and maintenance services for a period of five years.

Once awarded the contract, successful bidders must submit a performance bank guarantee equivalent to 5 per cent of the work order value within 15 days of receiving the letter of intent.

Eligibility criteria include having completed a 500 kW capacity project in the last three years from the bid submission date. Bidders registered in Odisha must have completed a 200 kW capacity project during the same period. Furthermore, bidders must have been operational in India for at least three years, possess an average annual turnover of Rs 10 million, and demonstrate a positive net worth over the last three financial years.

Bidders are also required to either have a project office in Odisha or commit to establishing one within a month of the award. ISO 9001 and ISO 14001 certifications are mandatory for participation.

Any project delays will incur liquidated damages of 0.5 per cent per week, with a maximum cap of 10 per cent of the project cost.

In a separate development, ITI recently issued a tender for the establishment of a 500 MW fully automatic solar photovoltaic module manufacturing line on a turnkey basis at its facility in Prayagraj, Uttar Pradesh. Earlier this year, ITI also issued a tender for the procurement of 738,000 polycrystalline solar cells, each with a minimum power output of 3.58 Wp and a tolerance range of -0-2 per cent, featuring a 5BB design.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

ITI, a public sector undertaking under the Department of Telecommunications, has issued an expression of interest (EoI) for the installation of 2 MW off-grid rooftop solar systems across Odisha. The deadline for submitting bids is January 24, 2025, with the bids to be opened on the same day. Bidders are required to submit an earnest money deposit of Rs 0.3 million and a document fee of Rs 5,900, including GST. The selected bidders will be responsible for designing, engineering, supplying, installing, testing, and commissioning the rooftop solar systems. Additionally, they will need to provide comprehensive operations and maintenance services for a period of five years. Once awarded the contract, successful bidders must submit a performance bank guarantee equivalent to 5 per cent of the work order value within 15 days of receiving the letter of intent. Eligibility criteria include having completed a 500 kW capacity project in the last three years from the bid submission date. Bidders registered in Odisha must have completed a 200 kW capacity project during the same period. Furthermore, bidders must have been operational in India for at least three years, possess an average annual turnover of Rs 10 million, and demonstrate a positive net worth over the last three financial years. Bidders are also required to either have a project office in Odisha or commit to establishing one within a month of the award. ISO 9001 and ISO 14001 certifications are mandatory for participation. Any project delays will incur liquidated damages of 0.5 per cent per week, with a maximum cap of 10 per cent of the project cost. In a separate development, ITI recently issued a tender for the establishment of a 500 MW fully automatic solar photovoltaic module manufacturing line on a turnkey basis at its facility in Prayagraj, Uttar Pradesh. Earlier this year, ITI also issued a tender for the procurement of 738,000 polycrystalline solar cells, each with a minimum power output of 3.58 Wp and a tolerance range of -0-2 per cent, featuring a 5BB design.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement