+
ITI Invites EoI for 2 MW Rooftop Solar Systems in Odisha
POWER & RENEWABLE ENERGY

ITI Invites EoI for 2 MW Rooftop Solar Systems in Odisha

ITI, a public sector undertaking under the Department of Telecommunications, has issued an expression of interest (EoI) for the installation of 2 MW off-grid rooftop solar systems across Odisha. The deadline for submitting bids is January 24, 2025, with the bids to be opened on the same day.

Bidders are required to submit an earnest money deposit of Rs 0.3 million and a document fee of Rs 5,900, including GST. The selected bidders will be responsible for designing, engineering, supplying, installing, testing, and commissioning the rooftop solar systems. Additionally, they will need to provide comprehensive operations and maintenance services for a period of five years.

Once awarded the contract, successful bidders must submit a performance bank guarantee equivalent to 5 per cent of the work order value within 15 days of receiving the letter of intent.

Eligibility criteria include having completed a 500 kW capacity project in the last three years from the bid submission date. Bidders registered in Odisha must have completed a 200 kW capacity project during the same period. Furthermore, bidders must have been operational in India for at least three years, possess an average annual turnover of Rs 10 million, and demonstrate a positive net worth over the last three financial years.

Bidders are also required to either have a project office in Odisha or commit to establishing one within a month of the award. ISO 9001 and ISO 14001 certifications are mandatory for participation.

Any project delays will incur liquidated damages of 0.5 per cent per week, with a maximum cap of 10 per cent of the project cost.

In a separate development, ITI recently issued a tender for the establishment of a 500 MW fully automatic solar photovoltaic module manufacturing line on a turnkey basis at its facility in Prayagraj, Uttar Pradesh. Earlier this year, ITI also issued a tender for the procurement of 738,000 polycrystalline solar cells, each with a minimum power output of 3.58 Wp and a tolerance range of -0-2 per cent, featuring a 5BB design.

ITI, a public sector undertaking under the Department of Telecommunications, has issued an expression of interest (EoI) for the installation of 2 MW off-grid rooftop solar systems across Odisha. The deadline for submitting bids is January 24, 2025, with the bids to be opened on the same day. Bidders are required to submit an earnest money deposit of Rs 0.3 million and a document fee of Rs 5,900, including GST. The selected bidders will be responsible for designing, engineering, supplying, installing, testing, and commissioning the rooftop solar systems. Additionally, they will need to provide comprehensive operations and maintenance services for a period of five years. Once awarded the contract, successful bidders must submit a performance bank guarantee equivalent to 5 per cent of the work order value within 15 days of receiving the letter of intent. Eligibility criteria include having completed a 500 kW capacity project in the last three years from the bid submission date. Bidders registered in Odisha must have completed a 200 kW capacity project during the same period. Furthermore, bidders must have been operational in India for at least three years, possess an average annual turnover of Rs 10 million, and demonstrate a positive net worth over the last three financial years. Bidders are also required to either have a project office in Odisha or commit to establishing one within a month of the award. ISO 9001 and ISO 14001 certifications are mandatory for participation. Any project delays will incur liquidated damages of 0.5 per cent per week, with a maximum cap of 10 per cent of the project cost. In a separate development, ITI recently issued a tender for the establishment of a 500 MW fully automatic solar photovoltaic module manufacturing line on a turnkey basis at its facility in Prayagraj, Uttar Pradesh. Earlier this year, ITI also issued a tender for the procurement of 738,000 polycrystalline solar cells, each with a minimum power output of 3.58 Wp and a tolerance range of -0-2 per cent, featuring a 5BB design.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

MMRDA Targets Completion of Projects by December 2028

The Mumbai Metropolitan Region Development Authority (MMRDA) is targeting the completion of all its ongoing infrastructure projects by December 2028, a year ahead of its December 2029 deadline, Metropolitan Commissioner Dr Sanjay Mukherjee has said.Speaking at the sixth edition of the Real Estate & Infrastructure Investors' Summit (REIIS) 2026 in Mumbai, Mukherjee said the authority was developing an integrated network of roads, tunnels, sea links and Metro corridors under its broader vision of “Mumbai in 59 Minutes”.The objective is to improve east-west and north-south connectivity an..

Next Story
Building Material

High-Performance Façades Gain Ground in Indian Buildings

High-performance façades are gaining greater importance in Indian architecture as developers and architects increasingly focus on energy efficiency, thermal comfort and building performance, according to Shankar Fenestrations & Glasses.The company said modern façade systems are increasingly being considered as part of a building's overall performance strategy rather than being used primarily as aesthetic elements.High-performance glass, curtain wall systems and structural glazing can contribute to thermal regulation, solar control, daylight management and indoor comfort. Their growing ad..

Next Story
Technology

SPML Infra's 104.4 kWh BESS Battery Pack Clears Global Tests

SPML Infra has announced that its proprietary 104.4 kWh Battery Energy Storage System (BESS) battery pack has completed key international safety, performance and transportation testing and certification requirements, marking a step towards its commercial deployment.Developed under the company's own intellectual property, the battery pack has completed requirements under UL9540A, IEC 62619, IEC 63056, IEC 60730, IEC 61000-6-2, IEC 61000-6-4 and UN38.3 standards.The testing covers areas including thermal runaway safety, battery performance, system functional safety, electromagnetic compatibility..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code