Ministry of Power Allows ISTS-Tendered Projects to Use InSTS
POWER & RENEWABLE ENERGY

Ministry of Power Allows ISTS-Tendered Projects to Use InSTS

The Union Ministry of Power has allowed renewable energy (RE) projects tendered with Inter-State Transmission System (ISTS) connectivity to use the State Transmission Utility (STU) or Intra-State Transmission System (InSTS), provided the generation project and power procurer are located within the same state. The decision is intended to reduce transmission costs and make renewable power procurement more economical for state utilities and distribution companies (DISCOMs).

The policy follows a representation from the National Solar Energy Federation of India (NSEFI), which highlighted the potential benefits of using intra-state networks for projects supplying power within the state. After examining the proposal, the ministry determined that transmitting electricity through existing state infrastructure could reduce related costs, and the competent authority approved the arrangement.

Eligible renewable energy developers will now have the flexibility to use STU or InSTS connectivity instead of relying solely on the ISTS network. The provision applies particularly to projects supplying procuring entities or DISCOMs operating in the same state, potentially improving cost efficiency and supporting more economical electricity procurement.

The ministry has clarified that developers and procuring utilities must comply with the requirements of the relevant State Electricity Regulatory Commissions (SERCs) and Joint Electricity Regulatory Commissions (JERCs). They will also need to obtain the necessary approvals for Power Purchase Agreements (PPAs) and Power Sale Agreements (PSAs) when adopting InSTS connectivity, as intra-state procurement falls within the jurisdiction of these regulators.

The ministry has directed that suitable provisions be included in future renewable energy bidding documents to facilitate intra-state connectivity when generation and consumption occur within the same state. The official communication was circulated to NTPC, NHPC, SJVN, Solar Energy Corporation of India (SECI), the Central Electricity Regulatory Commission and relevant state authorities. The change provides greater flexibility while encouraging more effective use of state transmission infrastructure.

The Union Ministry of Power has allowed renewable energy (RE) projects tendered with Inter-State Transmission System (ISTS) connectivity to use the State Transmission Utility (STU) or Intra-State Transmission System (InSTS), provided the generation project and power procurer are located within the same state. The decision is intended to reduce transmission costs and make renewable power procurement more economical for state utilities and distribution companies (DISCOMs). The policy follows a representation from the National Solar Energy Federation of India (NSEFI), which highlighted the potential benefits of using intra-state networks for projects supplying power within the state. After examining the proposal, the ministry determined that transmitting electricity through existing state infrastructure could reduce related costs, and the competent authority approved the arrangement. Eligible renewable energy developers will now have the flexibility to use STU or InSTS connectivity instead of relying solely on the ISTS network. The provision applies particularly to projects supplying procuring entities or DISCOMs operating in the same state, potentially improving cost efficiency and supporting more economical electricity procurement. The ministry has clarified that developers and procuring utilities must comply with the requirements of the relevant State Electricity Regulatory Commissions (SERCs) and Joint Electricity Regulatory Commissions (JERCs). They will also need to obtain the necessary approvals for Power Purchase Agreements (PPAs) and Power Sale Agreements (PSAs) when adopting InSTS connectivity, as intra-state procurement falls within the jurisdiction of these regulators. The ministry has directed that suitable provisions be included in future renewable energy bidding documents to facilitate intra-state connectivity when generation and consumption occur within the same state. The official communication was circulated to NTPC, NHPC, SJVN, Solar Energy Corporation of India (SECI), the Central Electricity Regulatory Commission and relevant state authorities. The change provides greater flexibility while encouraging more effective use of state transmission infrastructure.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

DGTR Opens Anti-Dumping Probe into Aluminium Imports

The Directorate General of Trade Remedies (DGTR) has initiated a suo motu anti-dumping investigation into aluminium products imported from China, Malaysia, Vietnam and Thailand. The investigation follows concerns that increased imports from the four countries have caused injury to domestic manufacturers, particularly micro, small and medium enterprises (MSMEs). According to a DGTR notification dated November 9, the probe followed representations from the Aluminium Extrusion Manufacturers Association of India (ALEMAI). The association represents 228 manufacturers producing aluminium extrusion p..

Next Story
Infrastructure Urban

NMDC Explores Lithium Investments with Russia’s Rosatom

State-owned miner NMDC is in preliminary discussions with Russian state nuclear corporation Rosatom to explore investments in lithium mining and processing projects in Russia, according to media reports citing three people familiar with the matter. The discussions are part of India’s efforts to diversify critical mineral supply chains and secure lithium for batteries and electric vehicles. NMDC officials visited Russia last month to attend a conference and held discussions with Rosatom representatives, the reports said. The miner is examining opportunities across lithium mining and processin..

Next Story
Infrastructure Urban

HCA Global Services Pre-leases 644,000 Sq Ft at Mindspace

HCA Global Services, the Indian subsidiary and Global Capability Centre (GCC) arm of US-based healthcare services provider HCA Healthcare, has pre-leased 644,000 sq ft of office space at Mindspace IT Park in Hyderabad for 10 years. The total rental commitment is estimated at Rs. 9.45 bn, according to documents accessed by Propstack. The office park is owned by Mindspace Business Parks REIT and leased by K Raheja IT Park (Hyderabad). The agreement covers 644,000 sq ft of chargeable area and 451,000 sq ft of carpet area across seven levels in Building 8. The premises include the lower ground flo..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code