Mooreast to Explore Up to 500 MW RE Projects in Timor-Leste
POWER & RENEWABLE ENERGY

Mooreast to Explore Up to 500 MW RE Projects in Timor-Leste

Mooreast Holdings, listed on the Singapore Exchange Catalist, announced that it will begin feasibility studies this month for the development of up to 500 megawatts (MW) of large-scale renewable energy (RE) projects in Timor-Leste.

The studies follow a Letter of Intent (LOI) signed between Mooreast and the Secretario de Estado de Electricidade Agua e Saneamento (SEEAS), the secretariat for Electricity, Water and Sanitation under Timor-Leste’s Ministry of Public Works. Under the LOI, Mooreast will explore the development of 300–500 MW of floating renewable energy over the next five to ten years.

As part of the feasibility phase, Mooreast will evaluate suitable offshore locations along Timor-Leste’s coastline to harness floating wind, solar, hydroelectric, tidal, current, and wave energy.

The LOI forms the foundation of a broader two-phase Renewable Energy Development Plan aimed at accelerating the country’s shift toward sustainable energy. Timor-Leste, which currently depends heavily on diesel-fired power generation, has set a target of achieving 100 per cent electrification by 2030, supported by a diversification into clean energy. The nation recently became the 11th member of ASEAN at the 47th ASEAN Summit in Kuala Lumpur.

Beyond project development, Mooreast’s scope under the proposed plan also includes:

  • Upgrading grid transmission and RE integration infrastructure
  • Establishing pilot microgrids for remote communities
  • Exploring power and hydrogen fuel export potential
  • Introducing smart-grid and energy storage technologies

Mooreast has been granted 12 months of exclusivity to complete feasibility studies and outline commercial, technical, and financing models. A formal Project Development Agreement (PDA) is expected in the first half of 2026. The PDA will cover:

  • Joint ventures for RE project development
  • Green financing and investment frameworks
  • Roles and responsibilities of Electricidade de Timor-Leste (EDTL)
  • Mooreast’s EPCI and floating RE responsibilities
  • Long-term Power Purchase Agreement terms

Mooreast, a specialist in offshore mooring and rigging solutions, is Asia’s only designer and manufacturer of ultra-high-power anchors. The Group is actively expanding its footprint globally amid rising adoption of floating wind technologies.

Eirik Ellingsen, CEO of Mooreast, said, “Timor-Leste has significant potential for floating renewable energy, which can drive economic development and support the nation’s electrification and sustainability goals. We are excited to bring our expertise and partnerships to deliver a mutually beneficial outcome.”


Mooreast Holdings, listed on the Singapore Exchange Catalist, announced that it will begin feasibility studies this month for the development of up to 500 megawatts (MW) of large-scale renewable energy (RE) projects in Timor-Leste.The studies follow a Letter of Intent (LOI) signed between Mooreast and the Secretario de Estado de Electricidade Agua e Saneamento (SEEAS), the secretariat for Electricity, Water and Sanitation under Timor-Leste’s Ministry of Public Works. Under the LOI, Mooreast will explore the development of 300–500 MW of floating renewable energy over the next five to ten years.As part of the feasibility phase, Mooreast will evaluate suitable offshore locations along Timor-Leste’s coastline to harness floating wind, solar, hydroelectric, tidal, current, and wave energy.The LOI forms the foundation of a broader two-phase Renewable Energy Development Plan aimed at accelerating the country’s shift toward sustainable energy. Timor-Leste, which currently depends heavily on diesel-fired power generation, has set a target of achieving 100 per cent electrification by 2030, supported by a diversification into clean energy. The nation recently became the 11th member of ASEAN at the 47th ASEAN Summit in Kuala Lumpur.Beyond project development, Mooreast’s scope under the proposed plan also includes:Upgrading grid transmission and RE integration infrastructureEstablishing pilot microgrids for remote communitiesExploring power and hydrogen fuel export potentialIntroducing smart-grid and energy storage technologiesMooreast has been granted 12 months of exclusivity to complete feasibility studies and outline commercial, technical, and financing models. A formal Project Development Agreement (PDA) is expected in the first half of 2026. The PDA will cover:Joint ventures for RE project developmentGreen financing and investment frameworksRoles and responsibilities of Electricidade de Timor-Leste (EDTL)Mooreast’s EPCI and floating RE responsibilitiesLong-term Power Purchase Agreement termsMooreast, a specialist in offshore mooring and rigging solutions, is Asia’s only designer and manufacturer of ultra-high-power anchors. The Group is actively expanding its footprint globally amid rising adoption of floating wind technologies.Eirik Ellingsen, CEO of Mooreast, said, “Timor-Leste has significant potential for floating renewable energy, which can drive economic development and support the nation’s electrification and sustainability goals. We are excited to bring our expertise and partnerships to deliver a mutually beneficial outcome.”

Next Story
Real Estate

RBI Rate Cut Boosts Confidence Across Housing Market

Industry Context and Market DynamicsThe real estate industry has welcomed the RBI’s rate cut as a timely boost to affordability and demand. With home prices having risen steadily across major markets, even a marginal reduction in interest rates meaningfully strengthens purchasing power, especially for first-time and mid-income buyers.Ashish Jerath, President – Sales & Marketing, Smartworld Developers, observes:“The RBI’s 25-basis-point cut, bringing the repo rate down to 5.25%, is a timely boost for the real estate sector. Lower interest rates reduce borrowing costs, enabling homeb..

Next Story
Infrastructure Transport

BMC Resumes Rs 170 Billion Road Works, Targets 80 per cent By Jan 2026

Following the withdrawal of the southwest monsoon in October, the Brihanmumbai Municipal Corporation (BMC) has restarted work on 645 roads—covering 297.49 kilometres—under its large-scale concretisation programme. Data shows that more than 60 per cent of the resumed works are located in the western suburbs. Officials said the civic body aims to complete concretisation on 80 per cent of the roads where fresh work has begun by January 2026. Launched in 2022, the Rs 170 billion project seeks to concretise 700 kilometres of roads across Mumbai. All civil works were halted during the monsoon ..

Next Story
Infrastructure Urban

India Pushes Digital Shift In Urban Land Mapping

The Department of Land Resources (DoLR) under the Ministry of Rural Development has convened a National Symposium on NAKSHA – the National Geospatial Knowledge-based Land Survey of Urban Habitations – to advance India’s transition to modern, technology-driven land mapping. Speaking at the inaugural session, Secretary Manoj Joshi underscored the urgent need to move revenue departments away from outdated, tape-based methods and rough hand-drawn sketches. He stressed that adopting latitude–longitude-based digital mapping and GIS-linked registration systems is essential for economic stabi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App