NTPC asks Indian startups to produce torrefied biomass pellets
POWER & RENEWABLE ENERGY

NTPC asks Indian startups to produce torrefied biomass pellets

National Thermal Power Corporation (NTPC) has invited Expression of Interest (EOI) to produce torrefied biomass pellets from Indian startups.

Through its research and development (R&D) wing, the network for space object tracking and analysis (NETRA), NTPC intends to provide a platform for Indian startups to develop advanced technology for producing torrefied biomass pellets for decentralised small-scale users. The deadline for the submission is 19 May 2022.

India produces around 230 million metric tonnes of biomass annually, either wasted or burnt. Biomass in power plants can reduce carbon footprint in the environment.

NTPC has been a pioneer in co-firing biomass in its coal power plants. Since its co-firing, NTPC has been strengthening the entire biomass sector value chain in various dimensions. Many NTPC plants have already started the requisite co-firing biomass pellets with coal. Long-term procurement has not been initiated in many plants.

Till now, the focus has been on non-torrefied biomass pellets. But, for bulk utilisation, torrefied biomass pellet production needs to be given importance, as it has more energy density with similar characteristics to coal.

The torrefied biomass pellets will reduce average transportation costs. Currently, the technology for torrefied pellets is still in the nascent stage of development.

The Ministry of Power (MoP) has set up the National Mission for using biomass in thermal power plants, Mission SAMARTH. It has mandated 5-10% co-firing of biomass in all coal-based thermal power plants in India. Biomass co-firing in power plants has also been included in the Budget 2022 for reducing carbon emissions and generating income for the farmers.

Image Source

Also read: Govt takes steps towards biomass use in coal-based TPPs

National Thermal Power Corporation (NTPC) has invited Expression of Interest (EOI) to produce torrefied biomass pellets from Indian startups. Through its research and development (R&D) wing, the network for space object tracking and analysis (NETRA), NTPC intends to provide a platform for Indian startups to develop advanced technology for producing torrefied biomass pellets for decentralised small-scale users. The deadline for the submission is 19 May 2022. India produces around 230 million metric tonnes of biomass annually, either wasted or burnt. Biomass in power plants can reduce carbon footprint in the environment. NTPC has been a pioneer in co-firing biomass in its coal power plants. Since its co-firing, NTPC has been strengthening the entire biomass sector value chain in various dimensions. Many NTPC plants have already started the requisite co-firing biomass pellets with coal. Long-term procurement has not been initiated in many plants. Till now, the focus has been on non-torrefied biomass pellets. But, for bulk utilisation, torrefied biomass pellet production needs to be given importance, as it has more energy density with similar characteristics to coal. The torrefied biomass pellets will reduce average transportation costs. Currently, the technology for torrefied pellets is still in the nascent stage of development. The Ministry of Power (MoP) has set up the National Mission for using biomass in thermal power plants, Mission SAMARTH. It has mandated 5-10% co-firing of biomass in all coal-based thermal power plants in India. Biomass co-firing in power plants has also been included in the Budget 2022 for reducing carbon emissions and generating income for the farmers. Image Source Also read: Govt takes steps towards biomass use in coal-based TPPs

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?