STEL secures power infra project in TN
POWER & RENEWABLE ENERGY

STEL secures power infra project in TN

Salasar Techno Engineering (STEL), a provider of customised steel fabrication and infrastructure solutions, has secured a Rs 364 crore power infrastructure project in Tamil Nadu.

The work order has been awarded by Tamil Nadu Generation and Distribution Corporation (TANGEDCO) ? an electrical power generation and distribution public sector undertaking owned by the Government of Tamil Nadu.

The contract focuses on the execution of loss reduction work in turnkey mode and enhancing the power infrastructure in the Erode district of Tamil Nadu.

?Under the contract, STEL is entrusted with the supply, erection, and installation of feeder segregation, high voltage distribution system, separation of double distribution transformer, and augmentation of 33KV Lines,? the company said.

The above contract strengthens the order book of the company and is expected to be completed within 36 months in a phased manner, it said.

New Delhi-based STEL is a steel structure manufacturer and EPC infrastructure company, providing services across telecom, energy and railways.

Your next big infra connection is waiting at RAHSTA 2025 – Asia’s Biggest Roads & Highways Expo, Jio World Convention Centre, Mumbai. Don’t miss out!

Salasar Techno Engineering (STEL), a provider of customised steel fabrication and infrastructure solutions, has secured a Rs 364 crore power infrastructure project in Tamil Nadu. The work order has been awarded by Tamil Nadu Generation and Distribution Corporation (TANGEDCO) ? an electrical power generation and distribution public sector undertaking owned by the Government of Tamil Nadu. The contract focuses on the execution of loss reduction work in turnkey mode and enhancing the power infrastructure in the Erode district of Tamil Nadu. ?Under the contract, STEL is entrusted with the supply, erection, and installation of feeder segregation, high voltage distribution system, separation of double distribution transformer, and augmentation of 33KV Lines,? the company said. The above contract strengthens the order book of the company and is expected to be completed within 36 months in a phased manner, it said. New Delhi-based STEL is a steel structure manufacturer and EPC infrastructure company, providing services across telecom, energy and railways.

Next Story
Infrastructure Transport

Indian Railways Marks New Milestone with 4.5 km Long ‘Rudrastra’ Trial

Indian Railways has successfully conducted the trial run of Asia’s longest freight train, named ‘Rudrastra’, achieving a new milestone in cargo transportation, as per news reports. The 4.5 km-long train began its trial from Ganjkhwaja railway station in Chandauli, Uttar Pradesh, and travelled to Garhwa in Jharkhand. Covering a distance of 209 km in 5 hours and 10 minutes, it maintained an average speed of 40.5 km per hour. The train was formed by combining three long-haul racks, with ..

Next Story
Infrastructure Energy

UltraTech Launches India’s First On-Site Hybrid RTC Renewable Energy Project

UltraTech Cement has operationalised a 7.5 MW round-the-clock (RTC) hybrid renewable energy project at its Sewagram Cement Works in Gujarat. The first-of-its-kind solution combines bifacial solar modules with trackers, wind energy and battery storage, co-located on-site, to ensure uninterrupted power for cement manufacturing without grid reliance. The project was executed in collaboration with clean energy solutions provider Gentari. Installed as a behind-the-meter system, it is the country..

Next Story
Infrastructure Transport

Patna Metro Trials Successful, Red Line Priority Corridor to Launch This Month

Patna is set to roll out its first metro rail service later this month, with successful trial runs conducted on the Red Line priority corridor, the Patna Metro Rail Corporation announced.On 7 September, a metro train completed a test run between the Patna depot and Bhootnath station. Officials said the trials involved rigorous checks of rolling stock fitness, overhead electrification (OHE), and track alignment and stability to ensure operational safety and performance.The corridor from the New Pataliputra Bus Terminal to Bhoothnath has been designated as the priority stretch and will be the fi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?