STEL secures power infra project in TN
POWER & RENEWABLE ENERGY

STEL secures power infra project in TN

Salasar Techno Engineering (STEL), a provider of customised steel fabrication and infrastructure solutions, has secured a Rs 364 crore power infrastructure project in Tamil Nadu.

The work order has been awarded by Tamil Nadu Generation and Distribution Corporation (TANGEDCO) ? an electrical power generation and distribution public sector undertaking owned by the Government of Tamil Nadu.

The contract focuses on the execution of loss reduction work in turnkey mode and enhancing the power infrastructure in the Erode district of Tamil Nadu.

?Under the contract, STEL is entrusted with the supply, erection, and installation of feeder segregation, high voltage distribution system, separation of double distribution transformer, and augmentation of 33KV Lines,? the company said.

The above contract strengthens the order book of the company and is expected to be completed within 36 months in a phased manner, it said.

New Delhi-based STEL is a steel structure manufacturer and EPC infrastructure company, providing services across telecom, energy and railways.

Salasar Techno Engineering (STEL), a provider of customised steel fabrication and infrastructure solutions, has secured a Rs 364 crore power infrastructure project in Tamil Nadu. The work order has been awarded by Tamil Nadu Generation and Distribution Corporation (TANGEDCO) ? an electrical power generation and distribution public sector undertaking owned by the Government of Tamil Nadu. The contract focuses on the execution of loss reduction work in turnkey mode and enhancing the power infrastructure in the Erode district of Tamil Nadu. ?Under the contract, STEL is entrusted with the supply, erection, and installation of feeder segregation, high voltage distribution system, separation of double distribution transformer, and augmentation of 33KV Lines,? the company said. The above contract strengthens the order book of the company and is expected to be completed within 36 months in a phased manner, it said. New Delhi-based STEL is a steel structure manufacturer and EPC infrastructure company, providing services across telecom, energy and railways.

Next Story
Infrastructure Urban

NACDAC PAT Rises 39%, Net Worth Doubles in FY25

NACDAC Infrastructure Limited has posted robust financial results for the fiscal year ended March 2025, with profit after tax (PAT) rising by 38.97 per cent year-on-year and net worth more than doubling. The company also reported a 33.84 per cent increase in revenue from operations, supported by operational efficiency, strategic project execution, and expansion across sectors and regions.In FY25, NACDAC recorded:Revenue from operations of Rs 485.8 million (up from Rs 362.97 million in FY24)EBITDA of Rs 67.6 million (up 31.93 per cent YoY)PAT of Rs 41.4 million (up from Rs 29.8 million in FY24)..

Next Story
Infrastructure Urban

Tata Communications Boosts Asia Connectivity With New Subsea Cable

Tata Communications, a global leader in communications technology, has announced the integration of the TGN-IA2 submarine cable system into its existing network. Developed by the Asia Direct Cable (ADC) consortium, the new cable represents a major advancement in network capacity, speed, and reliability for businesses across Asia and beyond.The TGN-IA2 cable is designed to deliver seamless connectivity, scalable bandwidth, and high-capacity data transfer across multiple routes. It will benefit enterprises, hyperscalers, and service providers by offering diverse and resilient connectivity throug..

Next Story
Infrastructure Urban

L&T Wins Water Projects in Rajasthan Worth Over Rs 1 Billion

Larsen & Toubro’s Water & Effluent Treatment (WET) business has secured major engineering, procurement and construction (EPC) orders from the Public Health Engineering Department of Rajasthan, aimed at improving water access and infrastructure across rural areas of the state.The largest order is for the Rajasthan Rural Water Supply and Fluorosis Mitigation Project – Phase II, Package-1, which includes the supply and installation of 5,251 km of transmission and distribution pipelines, construction of 38 ground-level reservoirs with a combined capacity of 40 million litres (ML), 20 p..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?