Telangana Loses Rs 17 Bn Solar Manufacturing Project
POWER & RENEWABLE ENERGY

Telangana Loses Rs 17 Bn Solar Manufacturing Project

In a major industrial shift, Premier Energies Ltd, a pioneering player in India’s solar cell manufacturing sector, has decided to relocate its 4 GW solar photovoltaic (PV) cell manufacturing facility from Telangana’s Seetharampur Industrial Park to Naidupeta Industrial Park in Andhra Pradesh's Nellore district.

While the 4 GW Solar PV TOPCon Module line will still be set up in Telangana, the Rs 17 billion investment in cell manufacturing is moving to Andhra Pradesh, bringing with it an estimated 2,000 jobs.

Strategic Relocation for Backward Integration Premier Energies initially proposed both a 4 GW solar cell facility and a 4 GW module facility in Telangana. However, recent stock exchange filings reveal a shift in strategy. The company is now implementing a backward integration model, co-locating its silicon ingot and wafer manufacturing operations alongside its solar PV cell manufacturing.

The Andhra Pradesh Industrial Infrastructure Corporation (APIIC) has allotted 269.71 acres to Premier Energies in Nellore district, including:

169.71 acres already allocated An additional 100 acres approved in principle

This site will now host: ? 4 GW Solar PV TOPCon Cell manufacturing facility ? 5 GW silicon ingot and wafer manufacturing plant

By integrating wafer and ingot production with PV cell manufacturing, Premier Energies aims to enhance efficiency, streamline its supply chain, and reduce manufacturing costs.

Discussions between the Andhra Economic Development Board (EDB) and Premier Energies began in October 2024. Land allocation was finalised by February 2025, highlighting Andhra Pradesh’s business-friendly environment and rapid policy execution. Officials cited this as a prime example of the state’s “speed of doing business” approach.

Telangana’s industrial landscape faces a setback, losing a critical component of Premier Energies' expansion. However, the 4 GW Solar PV TOPCon Module line remains in the state. Andhra Pradesh strengthens its position as a renewable energy hub, attracting investments that could bolster its status in India's clean energy transition.

As competition between Telugu states intensifies, Andhra Pradesh’s proactive investment policies and strategic land allocations appear to be giving it a competitive edge in attracting large-scale industrial projects.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

In a major industrial shift, Premier Energies Ltd, a pioneering player in India’s solar cell manufacturing sector, has decided to relocate its 4 GW solar photovoltaic (PV) cell manufacturing facility from Telangana’s Seetharampur Industrial Park to Naidupeta Industrial Park in Andhra Pradesh's Nellore district. While the 4 GW Solar PV TOPCon Module line will still be set up in Telangana, the Rs 17 billion investment in cell manufacturing is moving to Andhra Pradesh, bringing with it an estimated 2,000 jobs. Strategic Relocation for Backward Integration Premier Energies initially proposed both a 4 GW solar cell facility and a 4 GW module facility in Telangana. However, recent stock exchange filings reveal a shift in strategy. The company is now implementing a backward integration model, co-locating its silicon ingot and wafer manufacturing operations alongside its solar PV cell manufacturing. The Andhra Pradesh Industrial Infrastructure Corporation (APIIC) has allotted 269.71 acres to Premier Energies in Nellore district, including: 169.71 acres already allocated An additional 100 acres approved in principle This site will now host: ? 4 GW Solar PV TOPCon Cell manufacturing facility ? 5 GW silicon ingot and wafer manufacturing plant By integrating wafer and ingot production with PV cell manufacturing, Premier Energies aims to enhance efficiency, streamline its supply chain, and reduce manufacturing costs. Discussions between the Andhra Economic Development Board (EDB) and Premier Energies began in October 2024. Land allocation was finalised by February 2025, highlighting Andhra Pradesh’s business-friendly environment and rapid policy execution. Officials cited this as a prime example of the state’s “speed of doing business” approach. Telangana’s industrial landscape faces a setback, losing a critical component of Premier Energies' expansion. However, the 4 GW Solar PV TOPCon Module line remains in the state. Andhra Pradesh strengthens its position as a renewable energy hub, attracting investments that could bolster its status in India's clean energy transition. As competition between Telugu states intensifies, Andhra Pradesh’s proactive investment policies and strategic land allocations appear to be giving it a competitive edge in attracting large-scale industrial projects.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement