Vikram Solar To Supply 327 MW Modules for Gujarat Project
POWER & RENEWABLE ENERGY

Vikram Solar To Supply 327 MW Modules for Gujarat Project

Vikram Solar has secured a significant contract from Gujarat Industries Power Company Limited (GIPCL) to supply 326.625 MW of high-efficiency solar modules for the Khavda Renewable Energy Park in Gujarat. The modules are scheduled for delivery in the 2025–26 financial year.

With this order, Vikram Solar’s total contribution to India’s renewable energy sector rises to approximately 1.3 GW. The company, headquartered in Kolkata, specialises in advanced photovoltaic (PV) module manufacturing and has a presence in 39 countries.

Commenting on the development, Gyanesh Chaudhary, Chairman and Managing Director of Vikram Solar, said: “This order reinforces the strong and enduring relationship between Vikram Solar and GIPCL. The Khavda project symbolises a collective push towards energy security and sustainability. We are proud to contribute to one of the nation’s most ambitious renewable energy initiatives.”

The Khavda Renewable Energy Park is one of India’s flagship solar projects, aimed at accelerating the country's transition to clean energy.

Vikram Solar has secured a significant contract from Gujarat Industries Power Company Limited (GIPCL) to supply 326.625 MW of high-efficiency solar modules for the Khavda Renewable Energy Park in Gujarat. The modules are scheduled for delivery in the 2025–26 financial year.With this order, Vikram Solar’s total contribution to India’s renewable energy sector rises to approximately 1.3 GW. The company, headquartered in Kolkata, specialises in advanced photovoltaic (PV) module manufacturing and has a presence in 39 countries.Commenting on the development, Gyanesh Chaudhary, Chairman and Managing Director of Vikram Solar, said: “This order reinforces the strong and enduring relationship between Vikram Solar and GIPCL. The Khavda project symbolises a collective push towards energy security and sustainability. We are proud to contribute to one of the nation’s most ambitious renewable energy initiatives.”The Khavda Renewable Energy Park is one of India’s flagship solar projects, aimed at accelerating the country's transition to clean energy.

Next Story
Infrastructure Urban

India Expands Semiconductor Training To 500 Institutions

Under the Chips to Startups programme of the India Semiconductor Mission, the Union minister responsible for Railways, Information and Broadcasting, and Electronics and IT reported notable progress in talent development. He indicated that over the past four years substantial steps have been taken towards a 10-year target of training 85,000 engineers in semiconductor design. World-class EDA tools have been deployed in 315 academic institutions across the country to provide students with practical exposure to chip design. These EDA tools are supported by leading global firms and are accessible t..

Next Story
Infrastructure Urban

Delhi Institutions Support India Semiconductor Mission

The Government of India has prioritised talent development through training, upskilling and workforce development under the Chips to Startups initiative of the India Semiconductor Mission, with officials noting progress in four years towards a 10-year target of training 85,000 engineers in semiconductor design. Electronic design automation tools provided by Synopsys, Cadence, Siemens, Renesas, Ansys and AMD have been deployed in 315 academic institutions, enabling students to gain practical chip design experience. Chips have been fabricated and tested at the Semiconductor Laboratory, Mohali, a..

Next Story
Infrastructure Urban

NHA Announces Winners Of NHCX Hackathon At IIT Hyderabad

The National Health Authority (NHA) has concluded the NHCX Hackathon under the Ayushman Bharat Digital Mission (ABDM) to stimulate innovation around the National Health Claims Exchange (NHCX). The winning teams presented their solutions at the NHCX Innovation Meet held at IIT Hyderabad during a two-day event in March 2026 that also served as the hackathon grand finale. The hackathon itself ran from 22 to 28 February 2026 and aimed to accelerate paperless, transparent claims processing across India. The event was organised with a range of ecosystem partners, including the Insurance Regulatory a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement