+
Raimondi tower crane deployed for major Hungarian historic building renovation
Equipment

Raimondi tower crane deployed for major Hungarian historic building renovation

Mamut Daru Kft., established Hungarian rental fleet company of heavy lifting solutions, purchased and deployed its first Raimondi T187 tower crane for a major building revamp in Budapest.

The prestigious project involves the renovation of the main building and the library of the Hungarian Academy of Sciences, a scientific public body that will soon celebrate its 200th anniversary. Given the historical and cultural importance of the building, the project is one of the most notable jobsites in the country also ranking significantly in the European historic places landscape.

?We decided to expand our rental fleet with the company?s first Raimondi crane, a new T187; we opted for this model for its excellent specifications in terms of lifting capabilities and speed,? stated Csaba Balogh, General Manager, Mamut Daru. Csaba Balogh explained that the weight-optimized components facilitating the installation procedure, coupled with crane?s maximum lifting capacity of 10t, played a crucial role when deciding which model to rent to the project?s contractor.

Deployed in February 2024 with the support of a Raimondi operations team, the T187 is erected with a jib length of 55m at a freestanding height of 47.5m. Boasting a tip load of 3.14t, the crane can lift at a maximum speed of 115 meters (m/min) in the 37kW winch version, having a drum capacity of 620m. The modularity of parts and interchangeability of the T Series components figured into the purchase decision, Csaba Balogh said, citing future fleet expansion planning with additional Raimondi?s models.

?Participating in such a renowned refurbishment marks a milestone for our company. A significant responsibility, there were technical challenges to consider due to the site location and nature. Preserving the historic in-use buildings while working within tight site confines required precise crane positioning planning, excellent site coordination and accurate, precise work from the participants of the installation? stated Peter Kaszoni, Head of Tower Cranes.

Equipped with Lumina crane cabin and ConCore, Raimondi?s intelligently-designed control system, the T187 boasts technical and operational features; improved error diagnostic and troubleshooting, swifter calibration and settings, along with enhanced remote assistance allowing for instant and effective intervention.

The Raimondi T187 will remain onsite until completion of the project?s first phase, approximately 12 months.

Mamut Daru Kft., established Hungarian rental fleet company of heavy lifting solutions, purchased and deployed its first Raimondi T187 tower crane for a major building revamp in Budapest. The prestigious project involves the renovation of the main building and the library of the Hungarian Academy of Sciences, a scientific public body that will soon celebrate its 200th anniversary. Given the historical and cultural importance of the building, the project is one of the most notable jobsites in the country also ranking significantly in the European historic places landscape. ?We decided to expand our rental fleet with the company?s first Raimondi crane, a new T187; we opted for this model for its excellent specifications in terms of lifting capabilities and speed,? stated Csaba Balogh, General Manager, Mamut Daru. Csaba Balogh explained that the weight-optimized components facilitating the installation procedure, coupled with crane?s maximum lifting capacity of 10t, played a crucial role when deciding which model to rent to the project?s contractor. Deployed in February 2024 with the support of a Raimondi operations team, the T187 is erected with a jib length of 55m at a freestanding height of 47.5m. Boasting a tip load of 3.14t, the crane can lift at a maximum speed of 115 meters (m/min) in the 37kW winch version, having a drum capacity of 620m. The modularity of parts and interchangeability of the T Series components figured into the purchase decision, Csaba Balogh said, citing future fleet expansion planning with additional Raimondi?s models. ?Participating in such a renowned refurbishment marks a milestone for our company. A significant responsibility, there were technical challenges to consider due to the site location and nature. Preserving the historic in-use buildings while working within tight site confines required precise crane positioning planning, excellent site coordination and accurate, precise work from the participants of the installation? stated Peter Kaszoni, Head of Tower Cranes. Equipped with Lumina crane cabin and ConCore, Raimondi?s intelligently-designed control system, the T187 boasts technical and operational features; improved error diagnostic and troubleshooting, swifter calibration and settings, along with enhanced remote assistance allowing for instant and effective intervention. The Raimondi T187 will remain onsite until completion of the project?s first phase, approximately 12 months.

Next Story
Infrastructure Urban

GRM Overseas Reports Q1 FY26 Results; Strengthens Global & Domestic Presence

GRM Overseas has announced its unaudited financial results for the quarter ended 30 June 2025. The company reported a positive performance in terms of margins and profitability, despite topline pressures from global geopolitical challenges.Atul Garg, Managing Director, said:"We have maintained healthy margins and profitability while navigating short-term headwinds. Our focus remains on expanding our product portfolio, enhancing brand visibility, and deepening our distribution network. Internationally, we continue to hold a strong position in the Basmati rice export market, particularly in the ..

Next Story
Infrastructure Urban

Zuari Industries Posts Q1 FY26 Revenue Growth; PAT Turns Positive

Zuari Industries has announced its audited financial results for the quarter ended 30 June 2025.On a standalone basis, the company reported Revenue from Operations of Rs 2.10 billion and Operating EBITDA of Rs 220.4 million. Standalone Profit Before Tax (PBT), before exceptional items, stood at Rs 90 million.On a consolidated basis, Revenue rose 10.5 per cent year-on-year to Rs 2.67 billion, while Profit After Tax (PAT) stood at Rs 50 million compared to a loss of Rs 330.6 million in Q1 FY25.Segment HighlightsSugar, Power & Ethanol: Operations were impacted by an early mill closure due to ..

Next Story
Infrastructure Urban

Karnataka Bank Reports Q1 FY26 Net Profit of Rs 2.92 Bn

Karnataka Bank has announced a net profit of Rs 2.92 billion for the first quarter of FY26, compared to Rs 4 billion in Q1 FY25. The results were approved at the Board of Directors meeting held on 13 August 2025 at the Bank’s headquarters in Mangaluru.Asset Quality & Capital AdequacyGross NPA: 3.46 per cent, improved from 3.54 per cent in Q1 FY25.Net NPA: 1.44 per cent, down from 1.66 per cent in Q1 FY25.Capital Adequacy Ratio (CAR): 20.46 per cent, up from 17.64 per cent in Q1 FY25.Announcing the results, Raghavendra S Bhat, Managing Director & CEO, said:"The Bank has registered a m..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?