+
BEST Expands Fleet with 17 New E-Buses, Launches Coastal Road Service
ECONOMY & POLICY

BEST Expands Fleet with 17 New E-Buses, Launches Coastal Road Service

The Brihanmumbai Electric Supply and Transport (BEST) Undertaking has added 17 new 12-metre electric buses to its fleet, enhancing services across Mumbai. Some of these buses will operate on the newly launched AC route A-84, connecting Oshiwara Depot to Dr Shyamaprasad Mukherji Chowk (Museum) via the Coastal Road.

The new buses, manufactured by Nagpur-based Mumbadevi Mobility Private Limited, were inaugurated at the Colaba depot by IAS officer Asheesh Sharma, BEST’s acting general manager. The Coastal Road route will include four new stops between Worli and Marine Drive.

Equipped with modern amenities such as public address systems, mobile and laptop charging points, the buses aim to improve passenger comfort.

BEST’s current fleet stands at 2,711 buses, of which over 1,000 are electric—including 50 double-decker e-buses—operated largely on a wet lease model. The latest induction comes under BEST’s broader push towards fleet electrification, with 250 additional electric buses tendered last year.


News source: The Free Press Journal

The Brihanmumbai Electric Supply and Transport (BEST) Undertaking has added 17 new 12-metre electric buses to its fleet, enhancing services across Mumbai. Some of these buses will operate on the newly launched AC route A-84, connecting Oshiwara Depot to Dr Shyamaprasad Mukherji Chowk (Museum) via the Coastal Road.The new buses, manufactured by Nagpur-based Mumbadevi Mobility Private Limited, were inaugurated at the Colaba depot by IAS officer Asheesh Sharma, BEST’s acting general manager. The Coastal Road route will include four new stops between Worli and Marine Drive.Equipped with modern amenities such as public address systems, mobile and laptop charging points, the buses aim to improve passenger comfort.BEST’s current fleet stands at 2,711 buses, of which over 1,000 are electric—including 50 double-decker e-buses—operated largely on a wet lease model. The latest induction comes under BEST’s broader push towards fleet electrification, with 250 additional electric buses tendered last year.News source: The Free Press Journal

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App