BMC Issues SOP For Amnesty Scheme For Buildings Without OC
ECONOMY & POLICY

BMC Issues SOP For Amnesty Scheme For Buildings Without OC

The Brihanmumbai Municipal Corporation (BMC) has issued a Standard Operating Procedure for an amnesty scheme that will allow buildings without an Occupancy Certificate (OC) to seek formal recognition. The measure is aimed at relieving thousands of residents in structures occupied before 17 November 2016 and will take effect from the date the circular was published. The scheme covers eligible residential blocks, hospitals and schools where approvals were obtained but an OC was not granted due to procedural lapses or developer non-compliance.

To qualify, residential buildings must produce an Intimation of Disapproval, an approved plan and a Commencement Certificate from the BMC and establish occupation before 17 November 2016. Individual units will be eligible only if the carpet area does not exceed 80 square metres. A building will be treated as residential where more than 50 per cent of its use is residential and shops or offices located in such blocks may apply but will not receive financial concessions.

Registered cooperative housing societies and individual flat owners can apply for a partial OC and may proceed where the original developer has not sought certification, subject to a no objection certificate from the developer or the issuance of a notice under the Mumbai Municipal Corporation Act. The SOP provides a 50 per cent concession on regularisation charges and on premium for additional and fungible compensatory floor space index in specified cases.

The SOP allows conversion of features not counted in floor space index without penalty if applications are submitted within the first six months, while those lodged between six months and one year will attract a 50 per cent discount after which no concession will apply. Where architects or documents are unavailable a new architect or licensed surveyor may certify executed work and the BMC may grant an OC on an as-is-where-is basis subject to a registered undertaking and an indemnity bond. The SOP permits rehabilitation wings to be delinked from sale components so they can receive OCs independently and states that unauthorised construction will not be legitimised.

The Brihanmumbai Municipal Corporation (BMC) has issued a Standard Operating Procedure for an amnesty scheme that will allow buildings without an Occupancy Certificate (OC) to seek formal recognition. The measure is aimed at relieving thousands of residents in structures occupied before 17 November 2016 and will take effect from the date the circular was published. The scheme covers eligible residential blocks, hospitals and schools where approvals were obtained but an OC was not granted due to procedural lapses or developer non-compliance. To qualify, residential buildings must produce an Intimation of Disapproval, an approved plan and a Commencement Certificate from the BMC and establish occupation before 17 November 2016. Individual units will be eligible only if the carpet area does not exceed 80 square metres. A building will be treated as residential where more than 50 per cent of its use is residential and shops or offices located in such blocks may apply but will not receive financial concessions. Registered cooperative housing societies and individual flat owners can apply for a partial OC and may proceed where the original developer has not sought certification, subject to a no objection certificate from the developer or the issuance of a notice under the Mumbai Municipal Corporation Act. The SOP provides a 50 per cent concession on regularisation charges and on premium for additional and fungible compensatory floor space index in specified cases. The SOP allows conversion of features not counted in floor space index without penalty if applications are submitted within the first six months, while those lodged between six months and one year will attract a 50 per cent discount after which no concession will apply. Where architects or documents are unavailable a new architect or licensed surveyor may certify executed work and the BMC may grant an OC on an as-is-where-is basis subject to a registered undertaking and an indemnity bond. The SOP permits rehabilitation wings to be delinked from sale components so they can receive OCs independently and states that unauthorised construction will not be legitimised.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code