Kolkata CNG Network Expands with Pipeline-Linked Bus Station
ECONOMY & POLICY

Kolkata CNG Network Expands with Pipeline-Linked Bus Station

Kolkata’s public transport network has added a fourth depot-based compressed natural gas (CNG) station, with the new facility at the South Bengal State Transport Corporation depot in Belgharia becoming the first in the system to receive gas directly through a pipeline. The station will supply CNG to government buses and private vehicles.

The facility was commissioned on Tuesday by Bengal Gas Corporation (BGCL) in partnership with the South Bengal State Transport Corporation (SBSTC). The project cost Rs. 32 mn and was inaugurated by state labour and transport minister Arjun Singh. Its pipeline connection is intended to provide a more reliable supply than stations dependent on gas transported in cascades.

The direct supply arrangement is particularly significant for a bus depot because refuelling reliability affects the ability of operators to keep gas-powered vehicles in daily service. BGCL currently operates 33 CNG stations across its authorised geographical area, including three at state transport depots: WBTC’s Kasba depot, NBSTC’s Ultadanga depot and WBTC’s Tollygunge depot.

The Belgharia station comes as SBSTC operates around 150 CNG buses. Officials said the corporation’s fleet could grow as additional refuelling infrastructure becomes available, linking the expansion of vehicle numbers to the development of supporting fuel facilities. The project therefore adds capacity both for current operations and for any future increase in the depot’s gas-powered fleet.

BGCL is planning similar facilities at WBTC’s Nilgunj and Barasat depots, SBSTC’s Howrah depot and the Santragachi bus depot. If implemented, the stations would extend CNG access across more operating locations and reduce dependence on a limited number of depot-based refuelling points. At the inauguration, Singh said the government was focusing on green energy to reduce pollution and would introduce more electric and CNG-powered buses. The proposed depot projects remain the next stated steps in expanding Kolkata’s alternative-fuel bus infrastructure.

Kolkata’s public transport network has added a fourth depot-based compressed natural gas (CNG) station, with the new facility at the South Bengal State Transport Corporation depot in Belgharia becoming the first in the system to receive gas directly through a pipeline. The station will supply CNG to government buses and private vehicles. The facility was commissioned on Tuesday by Bengal Gas Corporation (BGCL) in partnership with the South Bengal State Transport Corporation (SBSTC). The project cost Rs. 32 mn and was inaugurated by state labour and transport minister Arjun Singh. Its pipeline connection is intended to provide a more reliable supply than stations dependent on gas transported in cascades. The direct supply arrangement is particularly significant for a bus depot because refuelling reliability affects the ability of operators to keep gas-powered vehicles in daily service. BGCL currently operates 33 CNG stations across its authorised geographical area, including three at state transport depots: WBTC’s Kasba depot, NBSTC’s Ultadanga depot and WBTC’s Tollygunge depot. The Belgharia station comes as SBSTC operates around 150 CNG buses. Officials said the corporation’s fleet could grow as additional refuelling infrastructure becomes available, linking the expansion of vehicle numbers to the development of supporting fuel facilities. The project therefore adds capacity both for current operations and for any future increase in the depot’s gas-powered fleet. BGCL is planning similar facilities at WBTC’s Nilgunj and Barasat depots, SBSTC’s Howrah depot and the Santragachi bus depot. If implemented, the stations would extend CNG access across more operating locations and reduce dependence on a limited number of depot-based refuelling points. At the inauguration, Singh said the government was focusing on green energy to reduce pollution and would introduce more electric and CNG-powered buses. The proposed depot projects remain the next stated steps in expanding Kolkata’s alternative-fuel bus infrastructure.

Related Stories

Gold Stories

Next Story
Technology

Where Infrastructure Meets Intelligence: Inside Bentley's Year inc

Oct 28, 2026  @Tanveer PadodeA first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.- By Tanveer Padode, CEO, IMPACCT: A first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.Two days in SingaporeConstruction is won or lost in two places: how a project is designed and how it is delivered. Technology has promised to improve both for years, and the question I carried into Bentley's Year in Infrastructure, held at the Fairmont Si..

Next Story
Infrastructure Transport

Vaishnaw Inaugurates Two Rail Sections in Madhya Pradesh

Railway Minister Ashwini Vaishnaw on October 24 inaugurated the Satna-Devendranagar and Rewa-Churhat rail sections under the Lalitpur-Singrauli Railway Project in Madhya Pradesh. He also flagged off the new Devendranagar-Churhat passenger train service through video conferencing. Chief Minister Dr Mohan Yadav attended the event. The new Rewa-Churhat railway line, which extends approximately 65 km, was built at a cost of over Rs. 10 bn. The 53 km Satna-Devendranagar line was constructed at a cost of over Rs. 8 bn. The passenger service is expected to provide improved rail access to residents in..

Next Story
Infrastructure Transport

Railways Minister to Inaugurate New Rail Sections Covering 118 km

Railways Minister Ashwini Vaishnaw will inaugurate the Satna-Devendra Nagar and Rewa-Churhat rail sections in Madhya Pradesh on October 24. The two sections have a combined length of 118 km and are intended to improve passenger and freight connectivity across the region. Vaishnaw will also flag off a new train service between Devendra Nagar and Churhat. Madhya Pradesh Chief Minister Mohan Yadav will attend the inauguration programme, according to information released by the Ministry of Railways. The 53-km Satna-Devendra Nagar section is expected to improve rail access to Satna, Nagod, Devendra..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code