Gomti Nagar Station redeveloped by CP Kukreja Architects
Company News

Gomti Nagar Station redeveloped by CP Kukreja Architects

Lucknow’s Gomti Nagar Railway Station was recently inaugurated by Prime Minister Narendra Modi via video conferencing. It was redeveloped by global architecture and design practice CP Kukreja Architects, the mixed-use project comprises the existing railway station infrastructure — a built-up area of 20 acres — and integrates a 40-acre commercial land parcel.

“Owing to the station's proximity to the city centre and its strategic location in Gomti Nagar, the up-and-coming commercial and IT heart of Lucknow city, the station is reimagined as an integrated, mixed-use development,” says Dikshu Kukreja, Managing Principal at CP Kukreja Architects and Honorary Consul General for the Republic of Albania. “The presence of such a complex will not only improve the region’s transport connectivity but also boost the economy of the region."

The project is based on a self-financing model of redevelopment, which means that the revenue generated from the commercial development will be used to bear the cost of renovation and refurbishment of the railway infrastructure.

"The design ensures efficient connectivity between the station building and the retail complex so that the passengers can easily walk from shopping and office areas into the railway station and vice versa. This allows them to enjoy entertainment spaces, kiosks and retail shops while making their way in or out," adds Kukreja.

The overall plan for the station is designed to achieve hassle-free circulation. The arrival and departure terminals have been segregated vertically to separate the flow of arriving passengers on the ground floor from departing passengers on the first floor. This will free the station from the typical hindrances caused due to cross-passenger movements commonly seen at railway stations.

The façade, which amalgamates contemporary and traditional Awadhi architecture, pays homage to the city's history and culture. Arches adorned with jaalis (traditional perforated screens) are introduced into the skin of the facade. Spanning the entire length of the facade, these arches are actually structural elements that reinforce the strength and integrity of the structure. Drawing inspiration from the domes found in Lucknow's traditional architecture, the station's roof is curvilinear and is lined with photovoltaic cells for solar power generation.

Lucknow’s Gomti Nagar Railway Station was recently inaugurated by Prime Minister Narendra Modi via video conferencing. It was redeveloped by global architecture and design practice CP Kukreja Architects, the mixed-use project comprises the existing railway station infrastructure — a built-up area of 20 acres — and integrates a 40-acre commercial land parcel.“Owing to the station's proximity to the city centre and its strategic location in Gomti Nagar, the up-and-coming commercial and IT heart of Lucknow city, the station is reimagined as an integrated, mixed-use development,” says Dikshu Kukreja, Managing Principal at CP Kukreja Architects and Honorary Consul General for the Republic of Albania. “The presence of such a complex will not only improve the region’s transport connectivity but also boost the economy of the region.The project is based on a self-financing model of redevelopment, which means that the revenue generated from the commercial development will be used to bear the cost of renovation and refurbishment of the railway infrastructure.The design ensures efficient connectivity between the station building and the retail complex so that the passengers can easily walk from shopping and office areas into the railway station and vice versa. This allows them to enjoy entertainment spaces, kiosks and retail shops while making their way in or out, adds Kukreja.The overall plan for the station is designed to achieve hassle-free circulation. The arrival and departure terminals have been segregated vertically to separate the flow of arriving passengers on the ground floor from departing passengers on the first floor. This will free the station from the typical hindrances caused due to cross-passenger movements commonly seen at railway stations.The façade, which amalgamates contemporary and traditional Awadhi architecture, pays homage to the city's history and culture. Arches adorned with jaalis (traditional perforated screens) are introduced into the skin of the facade. Spanning the entire length of the facade, these arches are actually structural elements that reinforce the strength and integrity of the structure. Drawing inspiration from the domes found in Lucknow's traditional architecture, the station's roof is curvilinear and is lined with photovoltaic cells for solar power generation.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?