+
L&T ships special construction equipment to BRO for strategic needs
Company News

L&T ships special construction equipment to BRO for strategic needs

L&T Construction Equipment (LTCEL) has dispatched the first batch of 25 special variant wheel loaders that are suitable for operation in harsh terrains – high altitudes and extreme weather conditions to the Border Roads Organisation (BRO), an organisation engaged in serving strategic requirements of the nation.

These sturdy machines (model L&T 9020) are fitted with ‘Cold Starting Kits’, enabling them to operate in sub-zero temperatures of up to minus 20 degrees. BRO will deploy them to strengthen road infrastructure in Northeast, North and Northwest India.

Commenting on the development, S N Subrahmanyan, CEO and Managing Director, Larsen & Toubro, has said, “These machines, as part of our contribution to Make in India and Aatmanirbhar Bharat initiative, are designed and developed by our Product Development Centre at Coimbatore and have more than 90 per cent indigenous content in line with Government’s vision to promote local manufacturing.”

BRO had invited bids as part of the Government of India’s efforts to build roads and bridges in border areas. LTCEL bagged the prestigious contract for supplying 70 9020 wheel loaders, its single largest order, against stiff competition from domestic and multinational companies.


Arvind K Garg, Executive Vice President and Head, L&T Construction and Mining Machinery Business, and Director, LTCEL, has said, “LTCEL has been involved in the supply of the indigenous machines for various strategic initiatives of the Indian Government. It has also supplied machines for varied applications required for UN peacekeeping mission, Public Sector Units and the BRO, apart from supplying them in large numbers to private contractors for building India’s infrastructure.”

BRO is India’s multifaceted, transnational construction organisation committed to meeting the strategic needs of the armed forces in maintaining the security and integrity of the nation. It plays a pivotal role in constructing and maintaining operational road infrastructure in inhospitable, far-flung border areas, contributing to the region’s socio-economic development.

LTCEL is engaged in manufacturing a diverse range of road construction equipment such as vibratory compactors, pneumatic tyred rollers, asphalt pavers, skid steer loaders, wheel loaders and hydraulic excavators, besides attachments such as crusher buckets and slope compactors. It also manufactures and markets high-precision hydraulic components, and customised systems for applications in construction equipment, industrial machinery and other engineering sectors.

LTCEL employs smart manufacturing technologies and practices such as CNC machines, welding robots, precision machinery and a multi-modal assembly line. It has been certified for ISO 9001, ISO 14001 and ISO 45001 and shares a legacy of continuous innovation in manufacturing know-how and technology that has translated into offering value-added products. L&T Construction & Mining Machinery Business markets and provides after-sales support to equipment manufactured by LTCEL.

L&T Construction Equipment (LTCEL) has dispatched the first batch of 25 special variant wheel loaders that are suitable for operation in harsh terrains – high altitudes and extreme weather conditions to the Border Roads Organisation (BRO), an organisation engaged in serving strategic requirements of the nation. These sturdy machines (model L&T 9020) are fitted with ‘Cold Starting Kits’, enabling them to operate in sub-zero temperatures of up to minus 20 degrees. BRO will deploy them to strengthen road infrastructure in Northeast, North and Northwest India. Commenting on the development, S N Subrahmanyan, CEO and Managing Director, Larsen & Toubro, has said, “These machines, as part of our contribution to Make in India and Aatmanirbhar Bharat initiative, are designed and developed by our Product Development Centre at Coimbatore and have more than 90 per cent indigenous content in line with Government’s vision to promote local manufacturing.” BRO had invited bids as part of the Government of India’s efforts to build roads and bridges in border areas. LTCEL bagged the prestigious contract for supplying 70 9020 wheel loaders, its single largest order, against stiff competition from domestic and multinational companies. Arvind K Garg, Executive Vice President and Head, L&T Construction and Mining Machinery Business, and Director, LTCEL, has said, “LTCEL has been involved in the supply of the indigenous machines for various strategic initiatives of the Indian Government. It has also supplied machines for varied applications required for UN peacekeeping mission, Public Sector Units and the BRO, apart from supplying them in large numbers to private contractors for building India’s infrastructure.” BRO is India’s multifaceted, transnational construction organisation committed to meeting the strategic needs of the armed forces in maintaining the security and integrity of the nation. It plays a pivotal role in constructing and maintaining operational road infrastructure in inhospitable, far-flung border areas, contributing to the region’s socio-economic development. LTCEL is engaged in manufacturing a diverse range of road construction equipment such as vibratory compactors, pneumatic tyred rollers, asphalt pavers, skid steer loaders, wheel loaders and hydraulic excavators, besides attachments such as crusher buckets and slope compactors. It also manufactures and markets high-precision hydraulic components, and customised systems for applications in construction equipment, industrial machinery and other engineering sectors. LTCEL employs smart manufacturing technologies and practices such as CNC machines, welding robots, precision machinery and a multi-modal assembly line. It has been certified for ISO 9001, ISO 14001 and ISO 45001 and shares a legacy of continuous innovation in manufacturing know-how and technology that has translated into offering value-added products. L&T Construction & Mining Machinery Business markets and provides after-sales support to equipment manufactured by LTCEL.

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App