+
Louis Berger International bags detailed design of six-Laning of NH-17
Company News

Louis Berger International bags detailed design of six-Laning of NH-17

Louis Berger (A WSP Company), a global professional services corporation, was recently awarded by Uralungal Labour Contract Cooperative Society (ULCCS) Limited, the detailed design of the project for the six-laning of the Thalapady to Chengala section of NH-17 (New NH-66) in Kasaragod, Kerala. ULCCSL was awarded the Hybrid Annuity Mode (HAM) by the National Highways Authority of India (NHAI).

Louis Berger International (LBI) (A WSP Company) will develop the detailed design for the project including geotechnical investigations, traffic survey, soil and material testing, highway design, structures design, storm water drainage design, and construction stage design support. The project will include the design of the main highway of 39km length with service roads on both sides, 4 major bridges, 4 minor bridges, 1 flyover, 10 vehicular underpasses and light vehicular underpass, 3 foot over bridges and 81 culverts.

Kshitish Nadgauda, Senior Vice President and Managing Director, LBI-Asia said, “We are delighted to be working on another project in Kerala and thank ULCCSL for choosing us for this prestigious project under Bharatmala Pariyojana. We are committed to participating with all stakeholders in advancing infrastructure development goals in Kerala. With our highly qualified and experienced group of professionals, we are committed to delivering to ULCCSL, to the NHAI and to Kerala services of the highest quality.”

“This latest win highlights Louis Berger’s dedication and contribution to India’s essential growth. Louis Berger will use its immense expertise and experience to design this project in Kerala. Through this, we aim to deliver the best-in-class infrastructure and experience of our highways, bridges, and roadways to the people of Kerala,” commented Surajit Bhattacharya, Chief Operating Officer, LBI-Asia.

Louis Berger International (LBI) will closely work with the Uralungal Labour Contract Co-operative Society Limited (ULCCS) for the Hybrid Annuity Mode (HAM) project. The Hybrid Annuity Mode (HAM) is a mix of the EPC and BOT models, where the government will contribute 40 per cent of the project cost in the first five years through annual payments (annuity). The balance 60% is arranged by the developer and is recovered from the NHAI in variable annuity amounts after the completion of the project. The NHAI will collect revenue generated by the project.

Louis Berger (A WSP Company), a global professional services corporation, was recently awarded by Uralungal Labour Contract Cooperative Society (ULCCS) Limited, the detailed design of the project for the six-laning of the Thalapady to Chengala section of NH-17 (New NH-66) in Kasaragod, Kerala. ULCCSL was awarded the Hybrid Annuity Mode (HAM) by the National Highways Authority of India (NHAI). Louis Berger International (LBI) (A WSP Company) will develop the detailed design for the project including geotechnical investigations, traffic survey, soil and material testing, highway design, structures design, storm water drainage design, and construction stage design support. The project will include the design of the main highway of 39km length with service roads on both sides, 4 major bridges, 4 minor bridges, 1 flyover, 10 vehicular underpasses and light vehicular underpass, 3 foot over bridges and 81 culverts. Kshitish Nadgauda, Senior Vice President and Managing Director, LBI-Asia said, “We are delighted to be working on another project in Kerala and thank ULCCSL for choosing us for this prestigious project under Bharatmala Pariyojana. We are committed to participating with all stakeholders in advancing infrastructure development goals in Kerala. With our highly qualified and experienced group of professionals, we are committed to delivering to ULCCSL, to the NHAI and to Kerala services of the highest quality.” “This latest win highlights Louis Berger’s dedication and contribution to India’s essential growth. Louis Berger will use its immense expertise and experience to design this project in Kerala. Through this, we aim to deliver the best-in-class infrastructure and experience of our highways, bridges, and roadways to the people of Kerala,” commented Surajit Bhattacharya, Chief Operating Officer, LBI-Asia. Louis Berger International (LBI) will closely work with the Uralungal Labour Contract Co-operative Society Limited (ULCCS) for the Hybrid Annuity Mode (HAM) project. The Hybrid Annuity Mode (HAM) is a mix of the EPC and BOT models, where the government will contribute 40 per cent of the project cost in the first five years through annual payments (annuity). The balance 60% is arranged by the developer and is recovered from the NHAI in variable annuity amounts after the completion of the project. The NHAI will collect revenue generated by the project.

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App