More than 202 railway stations to get airport-like security
AVIATION & AIRPORTS

More than 202 railway stations to get airport-like security

Airport-like security with passengers and visitors going through checks before accessing platforms will be added to more than 200 railway stations in India. Reports suggest that the new security system will be first introduced at Hubli in Karnataka and Prayagraj in Uttar Pradesh.

Limited entry and exit points for better monitoring are expected to be set up at railway stations. Checks will involve scanning luggage and commuters will be advised to reach the station early. Also, no cut off time to enter the platform will be imposed.

With the help of advanced technology, security in the station would reportedly include real-time face recognition software to alert the RPF command centre about known offenders. All the entry and exit points will be mapped and either boundaries or fencing would be set up to stop entry of people from multiple points. Blueprint of integrated security system (ISS), which includes installation of CCTV cameras, access control, personal and baggage screening system, are reportedly ready for implementation at 202 more stations.

In 2016, the railways had approved ISS to strengthen surveillance mechanism at 202 railway stations. Based on the report of a high level committee and in consultation with the zonal railways, 202 stations have been reportedly identified as sensitive for the purpose of installation of ISS to strengthen surveillance mechanism at these stations.

Airport-like security with passengers and visitors going through checks before accessing platforms will be added to more than 200 railway stations in India. Reports suggest that the new security system will be first introduced at Hubli in Karnataka and Prayagraj in Uttar Pradesh. Limited entry and exit points for better monitoring are expected to be set up at railway stations. Checks will involve scanning luggage and commuters will be advised to reach the station early. Also, no cut off time to enter the platform will be imposed. With the help of advanced technology, security in the station would reportedly include real-time face recognition software to alert the RPF command centre about known offenders. All the entry and exit points will be mapped and either boundaries or fencing would be set up to stop entry of people from multiple points. Blueprint of integrated security system (ISS), which includes installation of CCTV cameras, access control, personal and baggage screening system, are reportedly ready for implementation at 202 more stations. In 2016, the railways had approved ISS to strengthen surveillance mechanism at 202 railway stations. Based on the report of a high level committee and in consultation with the zonal railways, 202 stations have been reportedly identified as sensitive for the purpose of installation of ISS to strengthen surveillance mechanism at these stations.

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?