Kanpur To Get Rs 9,883 Million Elevated Corridor Along NH-91
ROADS & HIGHWAYS

Kanpur To Get Rs 9,883 Million Elevated Corridor Along NH-91

The Union road transport and highways minister announced approval of an elevated corridor in Kanpur at an estimated cost of Rs 9,883 million (Rs 9,883 mn). The four lane structure will extend for 10.160 kilometres along the old National Highway 91 from Ramadevi to Gol Chauraha. The project has been presented as a major infrastructure intervention for the city. The announcement was posted on a social networking platform and framed as a significant municipal investment.

It is intended to address chronic congestion caused by frequent stoppages at railway crossings on the Grand Trunk Road. The GT Road route of 10.85 kilometres currently has 18 railway crossings where traffic jams are common, and five locations have been identified for interchanges to allow motorists to enter and exit the elevated corridor. Local journeys that would normally take 10 minutes have at times stretched to one hour during peak periods.

Authorities say the elevated road will permit uninterrupted traffic flow above ground level and is designed to divert through traffic from congested junctions. The minister indicated that the project will significantly reduce congestion at major junctions in the city and will alleviate heavy traffic on the old NH-91 while reducing travel times for commuters. Implementation will require clearances from the Forest and Environment Department and the Railway Ministry before construction can commence.

The scheme is expected to offer long term benefits by improving journey reliability and reducing fuel consumption and emissions associated with stop start traffic. Planners said five million (five mn) residents of the city would stand to gain from reduced delays and more predictable travel. Detailed design work and timelines have not been released and authorities will proceed once statutory approvals are secured. Stakeholders expect phased construction to limit disruption during works.

The Union road transport and highways minister announced approval of an elevated corridor in Kanpur at an estimated cost of Rs 9,883 million (Rs 9,883 mn). The four lane structure will extend for 10.160 kilometres along the old National Highway 91 from Ramadevi to Gol Chauraha. The project has been presented as a major infrastructure intervention for the city. The announcement was posted on a social networking platform and framed as a significant municipal investment. It is intended to address chronic congestion caused by frequent stoppages at railway crossings on the Grand Trunk Road. The GT Road route of 10.85 kilometres currently has 18 railway crossings where traffic jams are common, and five locations have been identified for interchanges to allow motorists to enter and exit the elevated corridor. Local journeys that would normally take 10 minutes have at times stretched to one hour during peak periods. Authorities say the elevated road will permit uninterrupted traffic flow above ground level and is designed to divert through traffic from congested junctions. The minister indicated that the project will significantly reduce congestion at major junctions in the city and will alleviate heavy traffic on the old NH-91 while reducing travel times for commuters. Implementation will require clearances from the Forest and Environment Department and the Railway Ministry before construction can commence. The scheme is expected to offer long term benefits by improving journey reliability and reducing fuel consumption and emissions associated with stop start traffic. Planners said five million (five mn) residents of the city would stand to gain from reduced delays and more predictable travel. Detailed design work and timelines have not been released and authorities will proceed once statutory approvals are secured. Stakeholders expect phased construction to limit disruption during works.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement