+
Kanpur To Get Rs 9,883 Million Elevated Corridor Along NH-91
ROADS & HIGHWAYS

Kanpur To Get Rs 9,883 Million Elevated Corridor Along NH-91

The Union road transport and highways minister announced approval of an elevated corridor in Kanpur at an estimated cost of Rs 9,883 million (Rs 9,883 mn). The four lane structure will extend for 10.160 kilometres along the old National Highway 91 from Ramadevi to Gol Chauraha. The project has been presented as a major infrastructure intervention for the city. The announcement was posted on a social networking platform and framed as a significant municipal investment.

It is intended to address chronic congestion caused by frequent stoppages at railway crossings on the Grand Trunk Road. The GT Road route of 10.85 kilometres currently has 18 railway crossings where traffic jams are common, and five locations have been identified for interchanges to allow motorists to enter and exit the elevated corridor. Local journeys that would normally take 10 minutes have at times stretched to one hour during peak periods.

Authorities say the elevated road will permit uninterrupted traffic flow above ground level and is designed to divert through traffic from congested junctions. The minister indicated that the project will significantly reduce congestion at major junctions in the city and will alleviate heavy traffic on the old NH-91 while reducing travel times for commuters. Implementation will require clearances from the Forest and Environment Department and the Railway Ministry before construction can commence.

The scheme is expected to offer long term benefits by improving journey reliability and reducing fuel consumption and emissions associated with stop start traffic. Planners said five million (five mn) residents of the city would stand to gain from reduced delays and more predictable travel. Detailed design work and timelines have not been released and authorities will proceed once statutory approvals are secured. Stakeholders expect phased construction to limit disruption during works.

The Union road transport and highways minister announced approval of an elevated corridor in Kanpur at an estimated cost of Rs 9,883 million (Rs 9,883 mn). The four lane structure will extend for 10.160 kilometres along the old National Highway 91 from Ramadevi to Gol Chauraha. The project has been presented as a major infrastructure intervention for the city. The announcement was posted on a social networking platform and framed as a significant municipal investment. It is intended to address chronic congestion caused by frequent stoppages at railway crossings on the Grand Trunk Road. The GT Road route of 10.85 kilometres currently has 18 railway crossings where traffic jams are common, and five locations have been identified for interchanges to allow motorists to enter and exit the elevated corridor. Local journeys that would normally take 10 minutes have at times stretched to one hour during peak periods. Authorities say the elevated road will permit uninterrupted traffic flow above ground level and is designed to divert through traffic from congested junctions. The minister indicated that the project will significantly reduce congestion at major junctions in the city and will alleviate heavy traffic on the old NH-91 while reducing travel times for commuters. Implementation will require clearances from the Forest and Environment Department and the Railway Ministry before construction can commence. The scheme is expected to offer long term benefits by improving journey reliability and reducing fuel consumption and emissions associated with stop start traffic. Planners said five million (five mn) residents of the city would stand to gain from reduced delays and more predictable travel. Detailed design work and timelines have not been released and authorities will proceed once statutory approvals are secured. Stakeholders expect phased construction to limit disruption during works.

Next Story
Building Material

NITI Aayog Unveils Cement Decarbonisation Roadmap

NITI Aayog has released a sector-specific decarbonisation roadmap for cement as part of three green transition reports covering cement, aluminium and MSMEs. The report projects cement production rising to around 2,100 million tonnes by 2070 from 391 million tonnes in 2023, while targeting a reduction in carbon intensity to 0.09–0.13 tCO₂e per tonne. It recommends clinker substitution, refuse-derived fuels, CCUS adoption and carbon trading mechanisms to enable deep decarbonisation. ..

Next Story
Technology

Genesys Launches Advanced GeoRadar System

Genesys International Corporation has launched an advanced Ground Penetrating Radar (GPR) solution from IDS GeoRadar for underground utility mapping in India. The system uses patented Equalised Scrambling Technology (EST) and Wide/Multi-Array Antenna Technology to deliver high-resolution three-dimensional imaging of subsurface infrastructure. The technology enables the detection and mapping of buried assets such as water pipelines, sewer networks, telecom cables and power lines. By providing detailed subsurface insights, the system aims to help urban authorities and infrastructure developers ..

Next Story
Infrastructure Urban

Hindustan Zinc Partners Virginia Tech to Boost Silver Recovery

Hindustan Zinc Limited recently signed a Memorandum of Understanding (MoU) with Virginia Tech to advance research aimed at improving silver recovery across its lead–zinc (Pb–Zn) concentrators. The collaboration will focus on refining flotation techniques and optimising reagent usage to improve concentrate quality and operational efficiency at processing plants.Virginia Tech, based in Blacksburg, Virginia, is globally recognised for its expertise in mining engineering, mineral processing and applied metallurgical research. Through this partnership, Hindustan Zinc will leverage global resear..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App