+
L&T Construction to build India’s longest river bridge
ROADS & HIGHWAYS

L&T Construction to build India’s longest river bridge

L&T Construction, the construction arm of L&T, has secured a large contract to construct India’s longest road bridge across the river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya.

The 19 km long bridge will be built along National Highway 127-B and will feature a Navigation Bridge of 12.625 km, approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides.

The bridge will have huge strategic relevance by improving the connectivity of the North Eastern States with the rest of the country and establish a vital link between Assam and Meghalaya by reducing the distance between the two states by 250 km. Currently the travel between Dhubri and Phulbari is by ferry, which takes up to 2.5 hours.

“This is an extremely challenging project,” said SV Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “Not only will it be an important passage for offering easier access to our North Eastern international borders but will give a huge fillip to trade and commerce in the region for the accelerated development of all the North Eastern states, especially Assam, Meghalaya, Tripura and the Barak Valley.”

L&T Construction, the construction arm of L&T, has secured a large contract to construct India’s longest road bridge across the river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya. The 19 km long bridge will be built along National Highway 127-B and will feature a Navigation Bridge of 12.625 km, approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides. The bridge will have huge strategic relevance by improving the connectivity of the North Eastern States with the rest of the country and establish a vital link between Assam and Meghalaya by reducing the distance between the two states by 250 km. Currently the travel between Dhubri and Phulbari is by ferry, which takes up to 2.5 hours. “This is an extremely challenging project,” said SV Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “Not only will it be an important passage for offering easier access to our North Eastern international borders but will give a huge fillip to trade and commerce in the region for the accelerated development of all the North Eastern states, especially Assam, Meghalaya, Tripura and the Barak Valley.”

Next Story
Infrastructure Transport

Rs 19.5 Billion Meerut–Nazibabad Rail Electrification Complete

The Rs 19.5 billion railway electrification of the Meerut–Nazibabad section has been completed, marking a major step towards improving connectivity in northern India. The project covers 132 kilometres of track and is expected to enhance operational efficiency while reducing travel time and fuel costs.Officials from the Ministry of Railways said the electrification will enable faster, more reliable train services and contribute to reduced carbon emissions. The initiative aligns with the government’s broader goal of achieving 100 per cent electrification of India’s railway network by 2030...

Next Story
Infrastructure Urban

AU Small Finance Bank Secures RBI Approval For Universal Bank

AU Small Finance Bank has received approval from the Reserve Bank of India (RBI) to transition into a universal bank. The move will allow the Jaipur-based lender to expand its range of financial services and compete directly with larger commercial banks.Founded in 1996 as a non-banking finance company, AU Small Finance Bank became a small finance bank in 2017. The transition to a universal bank will enable it to offer a broader portfolio, including enhanced corporate banking, treasury operations, and new retail products.Managing Director and CEO Sanjay Agarwal said the approval marks a signifi..

Next Story
Building Material

India Cements Q1 Loss Narrows To Rs 276 Million On Higher Sales

India Cements Ltd has reported a consolidated net loss of Rs 276 million for the quarter ended June 2025, narrowing from a loss of Rs 831 million a year earlier. Consolidated revenue from operations rose 20 per cent year-on-year to Rs 17.9 billion from Rs 14.9 billion.The company attributed the improvement to higher sales volumes and better price realisations, which offset some of the impact of elevated fuel and raw material costs. EBITDA turned positive at Rs 1.1 billion, compared with a loss in the same period last year.Vice Chairman and Managing Director N. Srinivasan said the company will ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?