L&T Construction to build India’s longest river bridge
ROADS & HIGHWAYS

L&T Construction to build India’s longest river bridge

L&T Construction, the construction arm of L&T, has secured a large contract to construct India’s longest road bridge across the river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya.

The 19 km long bridge will be built along National Highway 127-B and will feature a Navigation Bridge of 12.625 km, approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides.

The bridge will have huge strategic relevance by improving the connectivity of the North Eastern States with the rest of the country and establish a vital link between Assam and Meghalaya by reducing the distance between the two states by 250 km. Currently the travel between Dhubri and Phulbari is by ferry, which takes up to 2.5 hours.

“This is an extremely challenging project,” said SV Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “Not only will it be an important passage for offering easier access to our North Eastern international borders but will give a huge fillip to trade and commerce in the region for the accelerated development of all the North Eastern states, especially Assam, Meghalaya, Tripura and the Barak Valley.”

L&T Construction, the construction arm of L&T, has secured a large contract to construct India’s longest road bridge across the river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya. The 19 km long bridge will be built along National Highway 127-B and will feature a Navigation Bridge of 12.625 km, approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides. The bridge will have huge strategic relevance by improving the connectivity of the North Eastern States with the rest of the country and establish a vital link between Assam and Meghalaya by reducing the distance between the two states by 250 km. Currently the travel between Dhubri and Phulbari is by ferry, which takes up to 2.5 hours. “This is an extremely challenging project,” said SV Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “Not only will it be an important passage for offering easier access to our North Eastern international borders but will give a huge fillip to trade and commerce in the region for the accelerated development of all the North Eastern states, especially Assam, Meghalaya, Tripura and the Barak Valley.”

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code