L&T Construction to build India’s longest river bridge
ROADS & HIGHWAYS

L&T Construction to build India’s longest river bridge

L&T Construction, the construction arm of L&T, has secured a large contract to construct India’s longest road bridge across the river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya.

The 19 km long bridge will be built along National Highway 127-B and will feature a Navigation Bridge of 12.625 km, approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides.

The bridge will have huge strategic relevance by improving the connectivity of the North Eastern States with the rest of the country and establish a vital link between Assam and Meghalaya by reducing the distance between the two states by 250 km. Currently the travel between Dhubri and Phulbari is by ferry, which takes up to 2.5 hours.

“This is an extremely challenging project,” said SV Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “Not only will it be an important passage for offering easier access to our North Eastern international borders but will give a huge fillip to trade and commerce in the region for the accelerated development of all the North Eastern states, especially Assam, Meghalaya, Tripura and the Barak Valley.”

L&T Construction, the construction arm of L&T, has secured a large contract to construct India’s longest road bridge across the river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya. The 19 km long bridge will be built along National Highway 127-B and will feature a Navigation Bridge of 12.625 km, approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides. The bridge will have huge strategic relevance by improving the connectivity of the North Eastern States with the rest of the country and establish a vital link between Assam and Meghalaya by reducing the distance between the two states by 250 km. Currently the travel between Dhubri and Phulbari is by ferry, which takes up to 2.5 hours. “This is an extremely challenging project,” said SV Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure), L&T. “Not only will it be an important passage for offering easier access to our North Eastern international borders but will give a huge fillip to trade and commerce in the region for the accelerated development of all the North Eastern states, especially Assam, Meghalaya, Tripura and the Barak Valley.”

Next Story
Infrastructure Urban

TBO Tek Q2 Profit Climbs 12%, Revenue Surges 26% YoY

TBO Tek Limited one of the world’s largest travel distribution platforms, reported a solid performance for Q2 FY26 with a 26 per cent year-on-year increase in revenue to Rs 5.68 billion, reflecting broad-based growth and improving profitability.The company recorded a Gross Transaction Value (GTV) of Rs 8,901 crore, up 12 per cent YoY, driven by strong performance across Europe, MEA, and APAC regions. Adjusted EBITDA before acquisition-related costs stood at Rs 1.04 billion, up 16 per cent YoY, translating into an 18.32 per cent margin compared to 16.56 per cent in Q1 FY26. Profit after tax r..

Next Story
Infrastructure Energy

Northern Graphite, Rain Carbon Secure R&D Grant for Greener Battery Materials

Northern Graphite Corporation and Rain Carbon Canada Inc, a subsidiary of Rain Carbon Inc, have jointly received up to C$860,000 (€530,000) in funding under the Canada–Germany Collaborative Industrial Research and Development Programme to develop sustainable battery anode materials.The two-year, C$2.2 million project aims to transform natural graphite processing by-products into high-performance, battery-grade anode material (BAM). Supported by the National Research Council of Canada Industrial Research Assistance Programme (NRC IRAP) and Germany’s Federal Ministry for Economic Affairs a..

Next Story
Infrastructure Urban

Antony Waste Q2 Revenue Jumps 16%; Subsidiary Wins Rs 3,200 Cr WtE Projects

Antony Waste Handling Cell Limited (AWHCL), a leading player in India’s municipal solid waste management sector, announced a 16 per cent year-on-year increase in total operating revenue to Rs 2.33 billion for Q2 FY26. The growth was driven by higher waste volumes, escalated contracts, and strong operational execution.EBITDA rose 18 per cent to Rs 570 million, with margins steady at 21.6 per cent, while profit after tax stood at Rs 173 million, up 13 per cent YoY. Revenue from Municipal Solid Waste Collection and Transportation (MSW C&T) reached Rs 1.605 billion, and MSW Processing re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement