Ranchi Residents Mobilise Against Proposed 10-Lane HEC Road
ROADS & HIGHWAYS

Ranchi Residents Mobilise Against Proposed 10-Lane HEC Road

Residents have mobilised at Ranchi’s HEC grounds against a proposed 10-lane road, combining environmental concerns with activities intended to highlight the value of the city’s remaining green spaces. The citizen collective Hamari Ranchi has organised music sessions, art workshops, yoga, reading circles and children’s activities beneath the tree canopy.

The campaign began on October 3 after Ranchi resident and product designer Shailesh Krishna noticed trees along the proposed alignment marked with paint. The markings prompted concerns about potential tree loss, leading Krishna to suggest using art on the trees to represent their ecological and social value. The initiative has since developed into a broader effort to create a temporary civic space at the HEC grounds.

Hamari Ranchi said between 200 and 300 trees had been painted as part of the campaign. Krishna separately stated that about 1,978 trees had been marked along the proposed road alignment, while the wider impact could involve more than 7,000 trees if saplings and younger plantations in nearby areas are included. These figures are campaign claims and have not been independently established in the supplied material.

The dispute centres on how the project’s environmental impact is defined. Residents argue that the assessment should consider adjoining plantations, shade, habitat, drainage edges, access points and the wider public use of the grounds, rather than only trees directly within the construction line. The supplied report does not establish the final design, land requirement, tree-removal plan, mitigation measures or whether all required approvals have been issued.

The campaign has also expanded its focus to public-space access, particularly for children and community activities. Prerna, a Ranchi-born mental health professional, joined the initiative as gatherings broadened beyond tree painting. Drawing inspiration from Mumbai’s Save Aarey movement, Hamari Ranchi has submitted representations to government agencies and is exploring legal options while seeking project documents. The next stage is expected to involve scrutiny of the road alignment, permissions, official tree inventory and proposed safeguards. The relevant implementing agency, project cost and construction timeline remain unspecified in the supplied report.

Residents have mobilised at Ranchi’s HEC grounds against a proposed 10-lane road, combining environmental concerns with activities intended to highlight the value of the city’s remaining green spaces. The citizen collective Hamari Ranchi has organised music sessions, art workshops, yoga, reading circles and children’s activities beneath the tree canopy. The campaign began on October 3 after Ranchi resident and product designer Shailesh Krishna noticed trees along the proposed alignment marked with paint. The markings prompted concerns about potential tree loss, leading Krishna to suggest using art on the trees to represent their ecological and social value. The initiative has since developed into a broader effort to create a temporary civic space at the HEC grounds. Hamari Ranchi said between 200 and 300 trees had been painted as part of the campaign. Krishna separately stated that about 1,978 trees had been marked along the proposed road alignment, while the wider impact could involve more than 7,000 trees if saplings and younger plantations in nearby areas are included. These figures are campaign claims and have not been independently established in the supplied material. The dispute centres on how the project’s environmental impact is defined. Residents argue that the assessment should consider adjoining plantations, shade, habitat, drainage edges, access points and the wider public use of the grounds, rather than only trees directly within the construction line. The supplied report does not establish the final design, land requirement, tree-removal plan, mitigation measures or whether all required approvals have been issued. The campaign has also expanded its focus to public-space access, particularly for children and community activities. Prerna, a Ranchi-born mental health professional, joined the initiative as gatherings broadened beyond tree painting. Drawing inspiration from Mumbai’s Save Aarey movement, Hamari Ranchi has submitted representations to government agencies and is exploring legal options while seeking project documents. The next stage is expected to involve scrutiny of the road alignment, permissions, official tree inventory and proposed safeguards. The relevant implementing agency, project cost and construction timeline remain unspecified in the supplied report.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

New National Highway Between Assam and Arunachal Pradesh Notified

A new national highway connecting Assam and Arunachal Pradesh has been notified by the Union Ministry of Road Transport and Highways, bringing renewed attention to the poor condition of a key route in the region. The notification has raised hopes that long-awaited repairs will be undertaken on the deteriorating Likabali-Garu stretch. The newly designated National Highway 515A begins at its junction with NH-515 near Akajan in Assam. From there, it passes through Likabali, Siji, Garu, Dali and Basar before ending at its junction with NH-13 near Bam, also known as Bame, in Arunachal Pradesh. The ..

Next Story
Infrastructure Transport

NHAI Removes 55 Unauthorised Structures Along Two National Highways

The National Highways Authority of India (NHAI) has completed a special anti-encroachment drive along National Highway-44 (NH-44) and National Highway-444A (NH-444A). The operation was conducted by NHAI’s Project Implementation Unit (PIU) in Ambala under the authority’s Regional Office (RO) in Chandigarh. During the drive, officials removed 55 unauthorised temporary structures located on NHAI land and within the Right of Way (ROW) of the two National Highways. The structures were identified as encroachments affecting land and road corridors under the authority’s jurisdiction. The operati..

Next Story
Infrastructure Transport

Ahmedabad–Mehsana Road to Become Eight-Lane Highway

The Gujarat government is planning to upgrade the Ahmedabad–Mehsana Road by widening the existing four-lane corridor into an eight-lane highway at an estimated cost of Rs. 26 bn. The project is intended to improve road capacity and connectivity between Ahmedabad and Mehsana in North Gujarat. The work will involve strengthening and expanding State Highway-41, which serves as an important transport link between Ahmedabad and Mehsana. The proposed improvement will cover the existing carriageway and associated road infrastructure to support smoother movement of passenger and commercial vehicles...

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code