BCPL Railway Infrastructure Gains Rs. 372.6 mn Order from Eastern Railway
RAILWAYS & METRO RAIL

BCPL Railway Infrastructure Gains Rs. 372.6 mn Order from Eastern Railway

BCPL Railway Infrastructure’s shares rose 4.21 per cent on the BSE after the company secured a Rs. 372.6 mn order from Eastern Railway. The contract, inclusive of GST, was awarded by the railway’s Asansol division for the replacement of overaged structures in the Waria-Raniganj section.

The order is scheduled to be executed over 12 months. The contract adds to the company’s recent business from Eastern Railway, following an earlier order worth Rs. 62.2 mn from the railway’s Howrah division, also inclusive of GST.

At the time of the market report, the company’s stock was trading at Rs. 69.07, up Rs. 2.79 from its previous close of Rs. 66.28. The scrip opened at Rs. 68.90 and recorded an intraday high of Rs. 69.29 and a low of Rs. 67.83.

A total of 60 shares had changed hands on the counter. The BSE group B stock, with a face value of Rs. 10, had recorded a 52-week high of Rs. 92.58 on 5 May 2026 and a 52-week low of Rs. 55.40 on 24 March 2026.

The stock’s one-week high and low stood at Rs. 72 and Rs. 66 respectively. BCPL Railway Infrastructure had a market capitalisation of Rs. 1.13 bn, while promoters held 72.86 per cent of the company and non-institutional investors held the remaining 27.14 per cent. The latest railway order is expected to support activity in the company’s infrastructure business as it undertakes the structure-replacement work in the Asansol division.

BCPL Railway Infrastructure’s shares rose 4.21 per cent on the BSE after the company secured a Rs. 372.6 mn order from Eastern Railway. The contract, inclusive of GST, was awarded by the railway’s Asansol division for the replacement of overaged structures in the Waria-Raniganj section. The order is scheduled to be executed over 12 months. The contract adds to the company’s recent business from Eastern Railway, following an earlier order worth Rs. 62.2 mn from the railway’s Howrah division, also inclusive of GST. At the time of the market report, the company’s stock was trading at Rs. 69.07, up Rs. 2.79 from its previous close of Rs. 66.28. The scrip opened at Rs. 68.90 and recorded an intraday high of Rs. 69.29 and a low of Rs. 67.83. A total of 60 shares had changed hands on the counter. The BSE group B stock, with a face value of Rs. 10, had recorded a 52-week high of Rs. 92.58 on 5 May 2026 and a 52-week low of Rs. 55.40 on 24 March 2026. The stock’s one-week high and low stood at Rs. 72 and Rs. 66 respectively. BCPL Railway Infrastructure had a market capitalisation of Rs. 1.13 bn, while promoters held 72.86 per cent of the company and non-institutional investors held the remaining 27.14 per cent. The latest railway order is expected to support activity in the company’s infrastructure business as it undertakes the structure-replacement work in the Asansol division.

Related Stories

Gold Stories

Next Story
Technology

Where Infrastructure Meets Intelligence: Inside Bentley's Year inc

Oct 28, 2026  @Tanveer PadodeA first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.- By Tanveer Padode, CEO, IMPACCT: A first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.Two days in SingaporeConstruction is won or lost in two places: how a project is designed and how it is delivered. Technology has promised to improve both for years, and the question I carried into Bentley's Year in Infrastructure, held at the Fairmont Si..

Next Story
Infrastructure Transport

Vaishnaw Inaugurates Two Rail Sections in Madhya Pradesh

Railway Minister Ashwini Vaishnaw on October 24 inaugurated the Satna-Devendranagar and Rewa-Churhat rail sections under the Lalitpur-Singrauli Railway Project in Madhya Pradesh. He also flagged off the new Devendranagar-Churhat passenger train service through video conferencing. Chief Minister Dr Mohan Yadav attended the event. The new Rewa-Churhat railway line, which extends approximately 65 km, was built at a cost of over Rs. 10 bn. The 53 km Satna-Devendranagar line was constructed at a cost of over Rs. 8 bn. The passenger service is expected to provide improved rail access to residents in..

Next Story
Infrastructure Transport

Railways Minister to Inaugurate New Rail Sections Covering 118 km

Railways Minister Ashwini Vaishnaw will inaugurate the Satna-Devendra Nagar and Rewa-Churhat rail sections in Madhya Pradesh on October 24. The two sections have a combined length of 118 km and are intended to improve passenger and freight connectivity across the region. Vaishnaw will also flag off a new train service between Devendra Nagar and Churhat. Madhya Pradesh Chief Minister Mohan Yadav will attend the inauguration programme, according to information released by the Ministry of Railways. The 53-km Satna-Devendra Nagar section is expected to improve rail access to Satna, Nagod, Devendra..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code